o
.
JUN
61986
Docket / License No. 50-289/DPR-50
GPU Nuclear Corporation
ATTN: Mr. H. D. Hukill
Vice President and Director, TMI-1
P.O. Box 480
Middletown, Pennsylvania 17057
Gentlemen:
Subject:
Inspection 50-289/86-05
During the period from March 7, 1986, to April 11, 1986, members of the NRC
Region I Staff conducted routine safety inspection activities at your facility
with respect to power and shutdown operations, radiation protection and fire
protection. The inspectors documented the results of these inspections in the
-
enclosed inspection report. At the conclusion of the inspection, Mr. R. Conte,
of my staff, summarized the inspection findings for you and other members of
your staff. We recognize several positive attributes and initiatives on your
part in controlling your transition to, and the performance of, outage work.
However, there were two apparent violations of NRC requirements (Appendix A)
identified during the outage period.
In one instance there was a failure to properly survey for airborne activity,
and this resulted in Reactor Building (RB) iodine concentrations going unde-
tected for up to fourteen hours, along with unplanned exposures to personnel,
when the reactor coolant system was vented to the RB.
In another instance,
there was a failure to properly post a radiation area. You are required to
respond to this letter; and, in so doing, you should follow the instructions
in Appendix A.
With respect to the radiological events described in paragraphs 3.3 and 3.4 of
the inspection report, we note that enhanced personnel and management attention
to circumstances leading to these events may have precluded them from occurring.
In responding to the violations, you should also provide your view on the pace
of activities as a contributing factor to these events and, as applicable, pro-
vide corrective measures to prevent recurrence.
0FFICIAL RECORD COPY
IR TMIl 86-05 - 0001.0.0
8606120422 860606-
\\
ADOCK 05000289
O
PDR..
..
O
.
GPU Nuclear Corporation
2
This letter also acknowledges receipt of your letter, dated January 31, 1986,
concerning the event in which records were discarded for the Power Operated
Relief Valve (PORV) surveillance test data.
Your response addressed the con-
cerns we had about that incident. We will review your corrective action in a
future inspection.
Your cooperation with us in this matter is appreciated.
Sincerely,
Harry B. Kister, Chief
Reactor Projects Branch No. 1
Division of Reactor Projects
Enclosure:
Appendix A, Notice of Violation
NRC Region I Inspection Report Number 50-289/86-05
cc w/ encl:
R. J. Toole, Operations and Maintenance Director, TMI-1
C. W. Smyth, TMI-1 Licensing Manager
R. J. McGoey, Manager, PWR Licensing
E. L. Blake, Jr.
TMI-1 OTSG Hearing Service List
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
0FFICIAL RECORD COPY
IR TMIl 86-05 - 0002.0.0
06/04/86
.-_-
-
-
-
--
--
-
,
-
.-
.
a
%~
'
GPU Nuclear Corporation
3
bec w/ encl:
Region I Docket Room (concurrence copy)
J. Goldberg, OELD: HQ
Management Assistant, DRMA (w/o encl)
A. Blough, DRP Section Chief
W. Travers, NRR
K. Abraham, RI
R. Conte, RI
W. Baunack, RI
A. Weadock, RI
F. Young, RI
4
D. Johnson, RI
i
D. LeQuia, RI
J. Rogers, RI
A. Krasopoulos, RI
,
-
4
l
i
i
i
,
i
I
M
$
e
,r-
RI:DRP
RI:DRP
RI:D
Rr:DRSS
RI:DRS
i
St?DRS
ll'.DRP
_ ate RConte/cph/ms ABlough
Shanbaky
3Bellary CAndersonj JWi gins
HKister
5/27 6
5/1//86
/1/86
Wh/86
5 i
5/2 /86
f/5/86
'
/8
,
0FFICIAL RECORD COPY
IR TMIl 86-05 - 0003.0.0
05/28/86
- .,
..
-
-
.- -
..
-.
..,.. - -
, - - - - - _ .
..
-.
. , - . . - - . ,
.
..~