Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19209C954 + (03:29:26, 5 January 2025)
- ML19209C953 + (03:29:26, 5 January 2025)
- ML19209C950 + (03:29:27, 5 January 2025)
- ML19209C946 + (03:29:29, 5 January 2025)
- ML19209C945 + (03:29:29, 5 January 2025)
- PNO-III-79-010, local Intervenors Issued Press Releases Stating Util Has Bypassed Requirements Re Setting of Reactor Vessel.Const Problems Have Prevented Shield Wall from Reaching Elevation Estimated for Vessel Placement + (03:29:31, 5 January 2025)
- ML19209C942 + (03:29:32, 5 January 2025)
- ML19209C941 + (03:29:33, 5 January 2025)
- ML19209C939 + (03:29:34, 5 January 2025)
- ML19209C935 + (03:29:35, 5 January 2025)
- ML19209C934 + (03:29:35, 5 January 2025)
- ML19209C931 + (03:29:37, 5 January 2025)
- ML19209C929 + (03:29:38, 5 January 2025)
- IR 05000321/1979017 + (03:29:40, 5 January 2025)
- ML19209C927 + (03:29:41, 5 January 2025)
- ML19209C924 + (03:29:42, 5 January 2025)
- ML19209C926 + (03:29:42, 5 January 2025)
- ML19209C923 + (03:29:44, 5 January 2025)
- ML19209C921 + (03:29:45, 5 January 2025)
- ML19209C920 + (03:29:46, 5 January 2025)
- ML19209C919 + (03:29:46, 5 January 2025)
- ML19209C918 + (03:29:47, 5 January 2025)
- ML19209C917 + (03:29:48, 5 January 2025)
- 05000302/LER-1979-086-03, /03L-0:on 790916,channel D Reactor Bldg High Pressure Bistable Tripped.Caused by Buildup of Dust on Shaft of Reactor Bldg Switch BS-62-PS.Switch Was Disassembled, Cleaned,Reassembled & Returned to Svc + (03:29:50, 5 January 2025)
- ML19209C914 + (03:29:52, 5 January 2025)
- 05000302/LER-1979-086, Forwards LER 79-086/03L-0 + (03:29:53, 5 January 2025)
- ML19209C911 + (03:29:56, 5 January 2025)
- IR 05000339/1979040 + (03:29:59, 5 January 2025)
- 05000259/LER-1979-023-03, /03L-0:on 790917,daily Source Checks on Various Continuous Air Monitors Were Missed Due to Airborne Contamination on Refuel Floor.Caused by Personnel Failure to Realize That Checks Are Tech Spec Requirement + (03:30:00, 5 January 2025)
- 05000277/LER-1979-041-03, /03L-0:on 790905,inadvertently Opened 440-volt Breaker Switch Made RHR Loop Injection Valve Inoperable. Caused by Breaker Switch Being Hit by Scaffolding Transported Through Area.Breaker Switch Reclosed + (03:30:05, 5 January 2025)
- ML19209C907 + (03:30:10, 5 January 2025)
- ML19209C906 + (03:30:11, 5 January 2025)
- 05000259/LER-1979-023, Forwards LER 79-023/03L-0 + (03:30:13, 5 January 2025)
- ML19209C902 + (03:30:15, 5 January 2025)
- ML19209C901 + (03:30:15, 5 January 2025)
- ML19209C900 + (03:30:19, 5 January 2025)
- ML19209C899 + (03:30:20, 5 January 2025)
- ML19209C898 + (03:30:21, 5 January 2025)
- ML19209C897 + (03:30:22, 5 January 2025)
- ML19209C896 + (03:30:23, 5 January 2025)
- ML19209C895 + (03:30:24, 5 January 2025)
- ML19209C894 + (03:30:25, 5 January 2025)
- 05000219/LER-1979-033-03, /03L-0:on 790917,electromatic Relief Valve Pressure Switch 1A83A Tripped at Pressure in Excess of Limit.Caused by Defective High Pressure Microswitch. Replacement Switch Installed + (03:30:27, 5 January 2025)
- ML19209C890 + (03:30:29, 5 January 2025)
- ML19209C888 + (03:30:29, 5 January 2025)
- 05000219/LER-1979-033, Forwards LER 79-033/03L-0 + (03:30:30, 5 January 2025)
- ML19209C884 + (03:30:31, 5 January 2025)
- ML19209C883 + (03:30:32, 5 January 2025)
- ML19209C882 + (03:30:33, 5 January 2025)
- ML19209C881 + (03:30:34, 5 January 2025)
- ML19209C880 + (03:30:36, 5 January 2025)