Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000346/LER-1979-114-03, /03L-0:on 791122,RCS Indicated Flow Below Tech Spec Requirements.Cause Undetermined.Flow Transmitter Signal Output Circuits Operating Normally.Actual RCS Flow & Transmitter Calibr Will Be Checked & Tubing Backfilled + (04:15:59, 4 January 2025)
- 05000346/LER-1979-114, Forwards LER 79-114/03L-0 + (04:16:28, 4 January 2025)
- ML19256G078 + (04:16:30, 4 January 2025)
- ML19256G077 + (04:16:31, 4 January 2025)
- ML19256G076 + (04:16:34, 4 January 2025)
- ML19256G074 + (04:16:36, 4 January 2025)
- ML19256G073 + (04:16:38, 4 January 2025)
- ML19256G072 + (04:16:40, 4 January 2025)
- ML19256G071 + (04:16:41, 4 January 2025)
- ML19256G070 + (04:16:43, 4 January 2025)
- ML19256G069 + (04:16:44, 4 January 2025)
- ML19256G068 + (04:16:46, 4 January 2025)
- ML19256G067 + (04:16:47, 4 January 2025)
- ML19256G066 + (04:16:49, 4 January 2025)
- ML19256G064 + (04:16:52, 4 January 2025)
- ML19256G063 + (04:16:53, 4 January 2025)
- ML19256G062 + (04:16:54, 4 January 2025)
- ML19256G061 + (04:16:56, 4 January 2025)
- ML19256G060 + (04:16:58, 4 January 2025)
- ML19256G058 + (04:17:27, 4 January 2025)
- ML19256G056 + (04:17:35, 4 January 2025)
- 05000289/LER-1979-017-01, /01T-1:on 791108,size of Support Bolting for Rigid Anchor DHH-127 Was Found to Be Inadequate in Design & Installation.Caused by Bolts Being 5/8-inch in Diameter, Contrary to 3/4-inch Design Requirement + (04:17:59, 4 January 2025)
- ML19256G052 + (04:18:01, 4 January 2025)
- ML19256G051 + (04:18:03, 4 January 2025)
- 05000289/LER-1979-017, Forwards LER 79-017/01T-1 + (04:18:07, 4 January 2025)
- ML19256G048 + (04:18:09, 4 January 2025)
- ML19256G047 + (04:18:11, 4 January 2025)
- 05000325/LER-1979-089-03, /03L-0:on 791120,reactor Core Isolation Cooling Turbine Tripped on Mechanical Overspeed During Scram.Caused by Crack in Amphenol Connector to Tachometer Pickup. Connector Replaced + (04:18:14, 4 January 2025)
- 05000325/LER-1979-089, Forwards LER 79-089/03L-0 + (04:18:29, 4 January 2025)
- ML19256G042 + (04:19:17, 4 January 2025)
- ML19256G040 + (04:19:20, 4 January 2025)
- ML19256G039 + (04:19:22, 4 January 2025)
- ML19256G037 + (04:19:24, 4 January 2025)
- ML19256G036 + (04:19:26, 4 January 2025)
- ML19256G035 + (04:19:27, 4 January 2025)
- ML19256G031 + (04:20:00, 4 January 2025)
- ML19256G030 + (04:20:01, 4 January 2025)
- ML19256G029 + (04:20:02, 4 January 2025)
- ML19256G027 + (04:20:05, 4 January 2025)
- 05000237/LER-1979-064-03, /03L-0:on 791124,torus-to-drywell Vacuum Breaker Found Inoperable.Caused by Swollen Teflon Shaft Bushings. Bushings Machined to Required Clearance & Study Initiated Re Applicability of Teflon as Bushing Material + (04:20:44, 4 January 2025)
- ML19256G025 + (04:20:50, 4 January 2025)
- ML19256G024 + (04:20:52, 4 January 2025)
- ML19256G023 + (04:20:53, 4 January 2025)
- ML19256G021 + (04:20:55, 4 January 2025)
- ML19256G019 + (04:20:57, 4 January 2025)
- 05000348/LER-1979-058-03, /03L-0:on 791121,boron Injection Tank Declared Inoperable Due to Low Concentration.Caused by Inadvertent Safety Injection.Concentration Increased by Batching + (04:21:37, 4 January 2025)
- ML19256G017 + (04:21:42, 4 January 2025)
- 05000348/LER-1979-057-03, /03L-0:on 791122,steam Generator B Level Channel 486 Declared Inoperable Due to High Reading.Caused by Instruments Equalizing Valve Leaking.Valve Tightened,Tested & Returned to Operation + (04:22:21, 4 January 2025)
- ML19256G015 + (04:22:32, 4 January 2025)
- ML19256G011 + (04:22:34, 4 January 2025)
- ML19256G010 + (04:22:35, 4 January 2025)