Responds to Requesting Addl Info on 750326 Loss of Offsite Power at Unit.Normal Power Was Off for Approx Four Minutes & Restored Manually.Unit in Cold Shutdown. Oscillograph at Castle Hayne Read 50% Voltage Loss
ML19256G051
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/18/1979
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
GD-79-3229, NUDOCS 7912270325
Download: ML19256G051 (2)


Text

s

.g 1> A S D j' M ].3

2.,,,:~.

,.m

n-December 18, 1979 FILE: NG-3514(B)

SERIAL NO.: GD-79-3229 Office of Nuclear Reactor Regulation Attention:

Mr. T. A. Ippolito, Chief Operating Reactors Branch No. 3 United States Nuclear Regulatory Com:nission Washington, D. C.

20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-324 LICENSE NO. DPR-62 INFORMATION ON LOSS OF OFF-SITE POWER

Dear Mr. Ippolito:

In response to your letter dated September 18, 1979 requesting additional information on the loss of off-site power event at the 3runswick Steam Electric Plait, Unit No. 2, which occurred on March 26, 1975, Carolina Power & Light Company supplies the following information.

Sections "A" and "C" of the Request for Additional Information are not applicable to the Brunswick Unit 2 event. Our response to Section "3"

follows:

1.

Normal power was off for approximately four (4) minutes. The emergency buses were reenergized within ten seconds due to the automatic starts of the diesel generators.

2.

The unit was in cold shutdown at the time of the loss of off-site power event.

3.

Full power was restored in approximately four (4) minutes by manual actions.

4.

The oscillograph at the Castle Hayne 230 Kv Substation showed an approximate 507. loss of voltage on the A-Phase.

The oscillograph at the Brunswick plant was not recording at the }bk

}g time of the event.

\\

M

\\

\\

i 79,2 e 7 0 b

70 ^

u Mr. T. A. Ippolito 5.

There is no indication from available data that there was any frequency decay experienced.

6.

This event occurred at 0213 on March 26, 1975.

We truer this information satisfies your request for additional information on the loss of off-site power.

Yours very truly,

/

/f/,

/_,-

E. E. Utley Executive Vice President Power Supply & Customer Services 3.'O / C33 /j cb 1643 137