ML19256G074

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1979
ML19256G074
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/17/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19256G075 List:
References
NUDOCS 7912270386
Download: ML19256G074 (1)


Text

  • Alabama Power Company 600 Nortn 18th Street Post Office Box 241 Birmingham, Alabama 35291 Telephone 205 323-5341 kbj'fe'R;sti AlabamaPower b

tre soarem eec:rc sys:em December 17, 1979 Director, Office of Management information and Program Control L. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-343 Menthly Operating Data Report Attached are two (2) copies of the November, 1979 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stol to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative c ummary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly,

' ~, ,{ l. A g C'"

^

F. L. Clayton, Jr.

FLCJr/TNE:bhj Attachments cc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy)

%\

7912270 M6 1654 170