Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212H353 + (11:02:45, 4 December 2024)
- ML20212H344 + (11:02:49, 4 December 2024)
- IR 05000298/1998011 + (11:02:50, 4 December 2024)
- ML20212H340 + (11:02:50, 4 December 2024)
- ML20212H339 + (11:02:51, 4 December 2024)
- ML20212H337 + (11:02:52, 4 December 2024)
- ML20212H335 + (11:02:53, 4 December 2024)
- ML20212H333 + (11:02:53, 4 December 2024)
- ML20212H332 + (11:02:54, 4 December 2024)
- ML20212H331 + (11:02:55, 4 December 2024)
- ML20212H330 + (11:02:56, 4 December 2024)
- 05000423/LER-1986-057, ;on 861216,reactor Trip Setpoints Associated W/ Low Flow Trip Determined Incorrect Due to Incorrect Calculation of RCS Flowrate.Caused by Failure to Transmit Correct Temp Detector Charts.Procedure Revised + (11:02:57, 4 December 2024)
- ML20212H328 + (11:02:58, 4 December 2024)
- ML20212H325 + (11:03:00, 4 December 2024)
- ML20212H323 + (11:03:01, 4 December 2024)
- ML20212H324 + (11:03:01, 4 December 2024)
- ML20212H319 + (11:03:02, 4 December 2024)
- ML20212H317 + (11:03:03, 4 December 2024)
- ML20212H310 + (11:03:04, 4 December 2024)
- ML20212H311 + (11:03:04, 4 December 2024)
- NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable + (11:03:05, 4 December 2024)
- ML20212H302 + (11:03:06, 4 December 2024)
- TXX-6223, Forwards Revs 1 to Comanche Peak Response Team Results Repts Isap I.a.1,ISAP I.b.4,ISAP Ii.C,Isap V.D & Isap VII.a.3 + (11:03:07, 4 December 2024)
- ML20212H299 + (11:03:10, 4 December 2024)
- ML20212H298 + (11:03:11, 4 December 2024)
- ML20212H295 + (11:03:13, 4 December 2024)
- ML20212H293 + (11:03:14, 4 December 2024)
- ML20212H294 + (11:03:14, 4 December 2024)
- ML20212H290 + (11:03:15, 4 December 2024)
- ML20212H291 + (11:03:15, 4 December 2024)
- B12385, Forwards Comments on NRC Final Draft Review of Northeast Utils Svc Co Probabilistic Safety Study,Submitted on 860331, as Part of Plant Isap Effort + (11:03:19, 4 December 2024)
- ML20212H286 + (11:03:19, 4 December 2024)
- ML20212H283 + (11:03:20, 4 December 2024)
- ML20212H281 + (11:03:21, 4 December 2024)
- ML20212H280 + (11:03:22, 4 December 2024)
- ML20212H279 + (11:03:22, 4 December 2024)
- U-600678, Submits Quarterly Update Re Const Schedule,Per NRC 810529 Request.Current Estimate for Fuel Load Is Late Aug 1986 + (11:03:23, 4 December 2024)
- ML20212H275 + (11:03:23, 4 December 2024)
- NRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired + (11:03:24, 4 December 2024)
- ML20212H271 + (11:03:25, 4 December 2024)
- ML20212H272 + (11:03:25, 4 December 2024)
- ML20212H270 + (11:03:26, 4 December 2024)
- ML20212H266 + (11:03:27, 4 December 2024)
- ML20212H267 + (11:03:27, 4 December 2024)
- ML20212H265 + (11:03:28, 4 December 2024)
- ML20212H263 + (11:03:28, 4 December 2024)
- ML20212H262 + (11:03:29, 4 December 2024)
- ML20212H260 + (11:03:30, 4 December 2024)
- ML20212H261 + (11:03:30, 4 December 2024)
- B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant + (11:03:31, 4 December 2024)
- NSD-NRC-98-5635, Transmits Results of Evaluation Performed by W to Quantify & Compare Volumetric Froude Numbers for Limiting Declg LOCA & Smaller Break Locas,Per Request + (11:03:31, 4 December 2024)
- 05000321/LER-1984-018-01, :on 840824,contract Engineering Personnel Noted That Numerous Fire Barrier Penetration Seals Not Functional. Caused by Deficient Penetration Seals.Installation & Repair of Fire Seals Implemented + (11:03:33, 4 December 2024)