- 05000247/LER-1986-035, :on 861020,reactor Tripped When Reactor Trip Breaker B Opened.Caused by Loose Wires in Relay Racks.Relay Rack Terminals Checked for Loose Connections & Auxiliary Feedwater Sys Retested & Restored to Operation + (06:55:39, 4 December 2024)
- ML20214J087 + (06:55:39, 4 December 2024)
- ML20214J085 + (06:55:40, 4 December 2024)
- ML20214J083 + (06:55:41, 4 December 2024)
- B12311, Forwards Review for Isap Topic 1.10, Torque Switch Mods, Per SEP Topic III-10.A.Torque Switch & Thermal Overload Protection Issues Adequately Addressed.Further Evaluation Ongoing + (06:55:42, 4 December 2024)
- ML20214J081 + (06:55:42, 4 December 2024)
- A06518, Ack Receipt of Listed Invoices for Cost Incurred for Review of Facility Submittals.Fee Paid.License Number for Millstone Unit 3 Incorrect on Invoice 1099A + (06:55:43, 4 December 2024)
- ML20214J079 + (06:55:43, 4 December 2024)
- ML20214J068 + (06:55:46, 4 December 2024)
- ML20214J064 + (06:55:47, 4 December 2024)
- ML20214J062 + (06:55:47, 4 December 2024)
- ML20214J058 + (06:55:49, 4 December 2024)
- ML20214J053 + (06:55:49, 4 December 2024)
- ML20214J051 + (06:55:50, 4 December 2024)
- ML20214J048 + (06:55:51, 4 December 2024)
- PNO-V-87-038, on 870513,female Air Lock Operator Received Injury to Neck While Opening Air Lock Door to Transfer Matl from Containment.Operator Transported Offsite for Medical Attention.No Serious Injuries or Contamination Found + (06:55:51, 4 December 2024)
- ML20214J047 + (06:55:52, 4 December 2024)
- ML20214J046 + (06:55:53, 4 December 2024)
- IR 05000336/1986020 + (06:55:54, 4 December 2024)
- ML20214J040 + (06:56:00, 4 December 2024)
- ML20214J035 + (06:56:01, 4 December 2024)
- ML20214J033 + (06:56:02, 4 December 2024)
- ML20214J034 + (06:56:02, 4 December 2024)
- ML20214J030 + (06:56:03, 4 December 2024)
- ML20214J028 + (06:56:04, 4 December 2024)
- ML20214J022 + (06:56:05, 4 December 2024)
- ML20214J020 + (06:56:06, 4 December 2024)
- ML20214J021 + (06:56:06, 4 December 2024)
- ML20214J019 + (06:56:07, 4 December 2024)
- ML20214J015 + (06:56:08, 4 December 2024)
- ML20214J008 + (06:56:10, 4 December 2024)
- ML20214J007 + (06:56:10, 4 December 2024)
- ML20214J002 + (06:56:11, 4 December 2024)
- JAFP-87-0419, Responds to NRC Re Violations Noted in Insp Rept 50-333/87-06.Corrective Actions:All Keys Inventoried & Entire Control Sys for nonsecurity-related Keys Reviewed & New Sys Established + (06:56:12, 4 December 2024)
- ML20214J001 + (06:56:12, 4 December 2024)
- ML20214H997 + (06:56:13, 4 December 2024)
- ML20214H998 + (06:56:13, 4 December 2024)
- 05000315/LER-1950-315, Retracts LER 50-315/85-70,per Generic Ltr 86-10 & Engineering Evaluation.Ler Number Will Not Be Reissued. Records Should Be Updated Accordingly + (06:56:14, 4 December 2024)
- ML20214H990 + (06:56:15, 4 December 2024)
- ML20214H992 + (06:56:15, 4 December 2024)
- 2CAN058705, Forwards Addl Info Re Potential for Stress Corrosion Cracking & Hydrogen Embrittlement of Weldment & Discussion of Potential Compensatory Measures Which Could Be Taken in Event Weld Failed,Per 870515 Telcon + (06:56:16, 4 December 2024)
- ML20214H986 + (06:56:17, 4 December 2024)
- TXX-6460, Final Deficiency Rept CP-85-54 Re Seismic Qualification of HVAC Supports.Initally Reported on 860926.Project Organization & Responsibilities for HVAC Activities Realigned & Field Verification Effort Expanded + (06:56:17, 4 December 2024)
- ML20214H983 + (06:56:18, 4 December 2024)
- ML20214H980 + (06:56:19, 4 December 2024)
- ML20214H977 + (06:56:20, 4 December 2024)
- ML20214H976 + (06:56:20, 4 December 2024)
- AECM-87-0046, Forwards Application for Amend to License NPF-29,changing Tech Specs by Deleting Condition 2.C.(23) & Adding New Std Fire Protection License Condition (Designated 2.C.(41)). Marked-up Tech Specs Encl + (06:56:21, 4 December 2024)
- ML20214H969 + (06:56:23, 4 December 2024)
- 05000251/LER-1986-012-01, :on 860711,during Cold Shutdown,Process Radiation Monitor R-11 Failed High,Resulting in Control Room/Containment Ventilation Isolation Logic.Caused by Zener Diode Failure.Diode Replaced + (06:56:25, 4 December 2024)
- TXX-6459, Interim Deficiency Rept CP-86-22 Re Capacity of Present Fan Cooler Design in Safeguards Area to Adequately Handle Heat Load in Several Rooms.Initially Reported on 860402. Evaluation Continuing.Next Rept Expected by 870708 + (06:56:25, 4 December 2024)
- A06502, Responds to NRC Re Violations Noted in Insp Repts 50-245/87-02,50-336/87-02 & 50-423/87-03.Corrective Actions: All Safeguard Info Contained in Repository Subsequently Relocated to Designated Repository in Main Office Area + (06:56:26, 4 December 2024)