Submits Supplemental Info to Items 4 & 8 of Util 870521 Response to NRC Comments Re Changes Made in FSAR Section 14.2, Initial Test Program. Air Receiver Vol Test Not Required Since Instrument Air Sys Not safety-related
ML20214J030
Person / Time
Site: Beaver Valley
Issue date: 05/25/1987
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
2NRC-7-141, TAC-63534, NUDOCS 8705270603
Download: ML20214J030 (2)


Text

d hl

'Af M

retephone (412) 393-6000 Nuclear Group May 25, 1987 s$pN$rt. PA 15077-0004

~

United States Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555

SUBJECT:

Beaver Valley Power Station Unit No. 2 Docket No. 50-412 Supplemental Information to Initial Test Program

REFERENCE:

Letter 2NRC-7-ll5 from J.

J.

Carey, DLC to USNRC; Response to NRC Comments to Changes Made to FSAR Section 14.2, Initial Test Program; May 21, 1987 Gentlemen:

In a telephone conversation, May 22, 1987, the NRC requested additional information on DLC's letter of May 21, 1987.

-Specifically, Items 4 and 8wof the referenced letter are supplemented here:

1)

Item 4, an Air Receiver Volume Test is not required because the Containment Instrument Air System is not safety related, not required to achieve safety-grade cold shutdown and all valves using instrument air fail to their safe position which is verified by SOV-2.34.05, Response of Plant Air-Operatored Valves To Loss of Instrument Air Test.

2)

Item 8, The Manufacturers Report of Main Transformer Test, 270ll-41-301-001A shows that the transformer maintains the winding temperature rise to less than 55 C as required by ANSI C57.12.90 which is called for by Generator Step-up Transformer Specification 2BVS-301.

Additionally, DLC will test the Transformer Cooling System at 50% and 100% Reactor Power by STP-2.35.01, Main Transformer Test.

If you should have any questions, please call Mr. A.

N.

D.

Cesavo at (412) 393-7742.

DUQUESNE LIGIT OMPANY L/ JCsG. Carey

$hgok Senior Vice President 8705270603 B70525 PDR ADOCK 05000412 i

A PDR 0

g l

,e United States Nuclear Regulatory Commission Supplemental Information to Initial Test Program Page 2 AND/smf NR/AND/FS/142 AR/NAR cc:

Mr.

P. Tam, Project Manager Mr.

J.

Beall, NRC Senior Resident Inspector Mr.

L.

Prividy, NRC Resident Inspector INPO Records Center I

w

-