TVA EMPLOYEE CONCERNS REPORT NUMBER: 215.10 SPECIAL PROGRAM REPORT TYPE:
Rational for Non-Inclusion REVISION NUMBER: 0
(~'
as Restart Item TITLE: Feedwater Heater Monorail Design PAGE 1 0F 3 REASON FOR REVISION:
PREPARATION PREPARED BY:
J. W. Benkert (see sheet 2 for signature) 9-11-86 SIGNATURE DATE C. W. Jordan (see sheet 2 for signature) 9-11-86 REVIEWS PEER:
SIGNATURE DATE TAS-N
/
8 SIGNATURE DATE CONCURRENCES CEG-H: h M $ N W 9-20f0 G. K. McNutt SRP:
w
//~ /2-86 SIGNATURE DATE SIGNATURE
- DATE APPROVED BY:
Y A
$'lb'N N/A ECSP MAIAGER DATE MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)
- SRP Secretary's signature denotes SRP concurrences are in files.
8612010131 861117 PDR ADOCK 05000327 P
r 1
SEQUOYAH NUCLEAR PLANT ENGINEERINC RELATED EMPLOYEE CONCERNS SPECIAL PROGRAM RATIONALE FOR NON-INCLUSION AS RESTART ITEM SUBCATEGORY / ELEMENT 215.10 (b)
Feed Water Heater Monorail Design The feedwater heater monorail in question is physically located in the turbine building adjacent to the feedwater heaters where there are no safety related equipment. Therefore, this is not a plant safety concern and thus is not a SQN restart issue.
n..
ATTACHENT: List of Issues for Civil ELEENT NO.
215.10 (b)
Date:
09/08/86 l
Evaluator 6 4 %
Date q\\ des, Resp. Mgr. M 2
Y)h/
{
Date ECEG-H
/
Date k M P' 0976d
?
50N REST ELEENT NupeER 215.D
.O
)
F. W. HEATER MONORAIL DESIGN
?
ELEENT iMERE RESPON-CONCERN NUMBER (S)
ISSUES ADDRESSED SIBLE GENERAL APPROACH /ETH000 LOGY FOR ELEENT REPORT LDA-85-001 1.
Structural integrity of feedwater 215.10 NGS NOTE: The feed water monorail in question is
" Structural integrity of the heater monorail hangers is physically located in the turbine butiding, feedwater neater monorail-questionable.
Therefore, this is not a plant safety concern.
and thus is not a SQN restart issue.
hangers" 1.
Obtain copies of feed water heater monorail drawings ar.d calculations. Review same.
2.
Determine if monorail has been load tested and obtain docismentation if available.
3.
Review TVA report LDA-85-001.
1 i