Record of Telcon W/B Holmgren,J Haseltine,G Papanic, D Le Franeois,N Williams & M Russell on 870522 Re Acceptability of Analyses Performed Using Ycs Input & 100% SAMsML20214H983 |
Person / Time |
---|
Site: |
Yankee Rowe |
---|
Issue date: |
05/22/1987 |
---|
From: |
Cheng T, Mckenna E NRC |
---|
To: |
|
---|
References |
---|
NUDOCS 8705270574 |
Download: ML20214H983 (1) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20216F2221997-12-0101 December 1997 Non-proprietary Rev 0 to Spent Fuel Pool Passive Cooling ML20216F1961997-12-0101 December 1997 Rev 0 to Spent Fuel Pool Thermal-Hydraulic Calculations ML20216F2431994-04-15015 April 1994 Rev 1 to Estimation of Spent Fuel Pit Heat-Up Rate Incorporating Actual Plant Data & Thermal Losses ML20216F2341992-06-0303 June 1992 Rev 0 to Estimation of Spent Fuel Pit Heat-Up Rate Incorporating Actual Plant Data & Thermal Losses ML20214J0011987-05-22022 May 1987 Record of Telcon W/Bw Holmgren of Util & Ty Wang of Cygna on 870327 Re Soil Ultimate Bearing Capacity Beneath Vapor Container ML20214H9831987-05-22022 May 1987 Record of Telcon W/B Holmgren,J Haseltine,G Papanic, D Le Franeois,N Williams & M Russell on 870522 Re Acceptability of Analyses Performed Using Ycs Input & 100% SAMs IA-86-445, Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 8201311986-07-28028 July 1986 Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131 ML20203H2851986-07-28028 July 1986 Package of Documents Re Operating Experience W/Westinghouse PWR Steam Generators Through 820131 ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams ML20135H3531984-06-19019 June 1984 Package of Reactor Operator & Senior Reactor Operator License Exam Questions & Answer Keys for Several Facilities, Including Yankee Rowe,Point Beach Units 1 & 2,Fort Calhoun Unit 1 & Calvert Cliffs Units 1 & 2 ML20148J6171976-06-25025 June 1976 Summary of Telcon W/Springfield Daily News on 760616 Re New England Coalition on Nuclear Pollution,Inc & Safe Power for Me 760611 Petition for Issuance of Show Cause Order to Util Re Discrepancies in QA Program 1997-12-01
[Table view] Category:TELEPHONE OR VERBAL CONVERSATION RECORD
MONTHYEARML20214J0011987-05-22022 May 1987 Record of Telcon W/Bw Holmgren of Util & Ty Wang of Cygna on 870327 Re Soil Ultimate Bearing Capacity Beneath Vapor Container ML20214H9831987-05-22022 May 1987 Record of Telcon W/B Holmgren,J Haseltine,G Papanic, D Le Franeois,N Williams & M Russell on 870522 Re Acceptability of Analyses Performed Using Ycs Input & 100% SAMs ML20148J6171976-06-25025 June 1976 Summary of Telcon W/Springfield Daily News on 760616 Re New England Coalition on Nuclear Pollution,Inc & Safe Power for Me 760611 Petition for Issuance of Show Cause Order to Util Re Discrepancies in QA Program 1987-05-22
[Table view] |
Text
,- . . _ . - . ,- . . . . - . ~ . _ - - - __ _.__._ _-- _ __
9Moo go ' -
UNITED STATES .
8 o NUCLEAR REGULATORY COMMISSION
{ I WASHINGTON, D. C. 20666
% . * * *) MAY 2 21987 50-029 RECORD OF PHONE CONVERSATION
Participants:
NRC: T. Cheng, E, McKenna Yankee Atomic Electric Company: B. Holmgren, !
J. Haseltine, G. Papanic, D. Le Franeois . !
Cygna: N. Williams EG & G: M. Russell Date and Time: Thursday, May 1,1987 11:00 a.m. EDT
SUBJECT:
USE OF 100% SAMS FOR YCS ANALYSIS AND BLOCK WALLS A telephone conference was conducted to discuss the acceptability of analyses perfomed using YCS input and 100% SAMs.
Mark Russell of EG & G had performed some analyses which raised a concern that a YCS analysis with 100% SAM may not provide the same margin as an NRC loading analysis, with 60% SAM, even considering the strain criteria, particularly for cold stainless steel.
There were some conservatisms in this simplified analysis, therefore, the con-clusion was not that the piping results are unacceptable but rather that a closer look is needed at some specific piping problems. 'The details of the analysis will be provided to all participants of the call for review and another conference call will be conducted next week.
Another issue was discussed concerning block walls in the. turbine building.
Lawrence Livemore Lab had previously indicated that these walls would have to be shown not to develop horizontal and vertical cracks simultaneously, for acceptability. This was based on the confimatory analysis results of the PAR north wall. Yankee noted that such a demonstration would require reanalysis of the walls for NRC loading and that such effort should not be required considering the overall results of the confirmatory analysis and the small change to the PAB north wall modifications.
The staff stated that the concern would be for adequacy of block walls that not been modified (based on a YCS analysis) and which were in the vicinity of-safety-related equipment. Yankee stated there were no such walls, and that .
they would document this in a letter.