Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214J564 + (06:52:41, 4 December 2024)
- ML20214J562 + (06:52:42, 4 December 2024)
- TXX-4826, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/85-16 & 50-446/85-13.Corrective Actions:Design Change Authorization 13,349 Rereviewed & Results Documented in Calculations SRB-128C,Set 2,Rev 10 + (06:52:43, 4 December 2024)
- ML20214J561 + (06:52:43, 4 December 2024)
- ST-HL-AE-1817, Forwards marked-up FSAR Pages 3.10N-7 Through 3.10N-9 & Question/Response 032.5 Re Equipment Qualification.Revs Will Be Incorporated Into Future FSAR Amend.Related Correspondence + (06:52:44, 4 December 2024)
- ML20214J558 + (06:52:45, 4 December 2024)
- ML20214J557 + (06:52:45, 4 December 2024)
- ML20214J553 + (06:52:46, 4 December 2024)
- ML20214J556 + (06:52:46, 4 December 2024)
- ML20214J551 + (06:52:47, 4 December 2024)
- ML20214J552 + (06:52:47, 4 December 2024)
- ML20214J549 + (06:52:48, 4 December 2024)
- ML20214J548 + (06:52:49, 4 December 2024)
- ML20214J545 + (06:52:49, 4 December 2024)
- PNO-II-87-029, on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup + (06:52:50, 4 December 2024)
- ML20214J542 + (06:52:51, 4 December 2024)
- ML20214J539 + (06:52:51, 4 December 2024)
- ML20214J537 + (06:52:52, 4 December 2024)
- ML20214J538 + (06:52:52, 4 December 2024)
- ML20214J536 + (06:52:53, 4 December 2024)
- ML20214J534 + (06:52:54, 4 December 2024)
- ML20214J535 + (06:52:54, 4 December 2024)
- ML20214J531 + (06:52:55, 4 December 2024)
- ML20214J532 + (06:52:55, 4 December 2024)
- ML20214J530 + (06:52:56, 4 December 2024)
- ML20214J529 + (06:52:56, 4 December 2024)
- ML20214J526 + (06:52:57, 4 December 2024)
- ML20214J528 + (06:52:57, 4 December 2024)
- 0CAN078613, Forwards Revised Justifications for Continued Operation Re Limitorque Operator Concerns Expressed by NRC During 860714- 18 Audit/Insp of Environ Qualification Program,Per 860722 Telcon.Clarification of Specific Issues Provided + (06:52:58, 4 December 2024)
- ML20214J524 + (06:52:59, 4 December 2024)
- GO2-86-696, Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant + (06:53:00, 4 December 2024)
- ML20214J522 + (06:53:00, 4 December 2024)
- 05000458/LER-1986-044, :on 860807,reactor Trip Occurred as Result of Turbine Bldg High Temp Isolation Trip Signal.Caused by Failure of Main Steam Moisture Separator Reheater Drain Tank Gasket.Gasket Replaced + (06:53:02, 4 December 2024)
- ML20214J517 + (06:53:03, 4 December 2024)
- ML20214J516 + (06:53:03, 4 December 2024)
- W3P87-1329, Remits Insp Fee for 860622-860927 + (06:53:04, 4 December 2024)
- ML20214J514 + (06:53:04, 4 December 2024)
- ML20214J510 + (06:53:05, 4 December 2024)
- ML20214J509 + (06:53:06, 4 December 2024)
- ML20214J508 + (06:53:06, 4 December 2024)
- ML20214J506 + (06:53:07, 4 December 2024)
- IR 05000412/1986020 + (06:53:08, 4 December 2024)
- ML20214J503 + (06:53:09, 4 December 2024)
- ML20214J504 + (06:53:09, 4 December 2024)
- IR 05000309/1987003 + (06:53:10, 4 December 2024)
- ML20214J500 + (06:53:11, 4 December 2024)
- ML20214J499 + (06:53:11, 4 December 2024)
- 05000369/LER-1987-009-02, :on 870415,reactor Tripped Due to Turbine Tripped Signal Generated While Station Personnel Testing Turbine auto-stop Oil Pressure Switch.Caused by Design Deficiency.Preventive Maint Code Changed + (06:53:13, 4 December 2024)
- ML20214J491 + (06:53:14, 4 December 2024)
- ML20214J493 + (06:53:14, 4 December 2024)
- ML20214J488 + (06:53:15, 4 December 2024)
- TXX-6106, Interim Deficiency Rept CP-85-54 Re Seismic Qualification of HVAC Supports.Initially Reported on 860926.Engineering Evaluations Will Be Performed to Ensure Compliance W/Fsar Commitments.Next Rept Will Be Submitted by 870522 + (06:53:16, 4 December 2024)