Text
'MOV18 gg Docket No.:
50-423 Mr. John F. Opeka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P.O. Box 270 Hartford, CT 06141-0270
Dear Mr. Opeka:
SUBJECT:
DRAFT SAFETY EVALUATION REPORT FOR MII.lSTONE NUCLEAR POWER STATION, UNIT N0. 3, REACTOR C0OLANT PUMP TRIP (GENERIC 1.ETTER 85-12)
The staff has completed a preliminary review to assess the completeness and adequacy of your response to Generic l.etter 85-12. Your response was found to be incomplete in several of the areas evaluated.
The Draft SER (Enclosure 1) provides our initial conclusions and their bases. This information should be used as the basis for a telephone confer-ence call prior to preparation of your response.
It is anticipated that much of the needed clarification will be obtained during the conference call.
I plan to contact your licensing staff within approximately two weeks of the date of this letter to arrange the call.
Sincerely, Elizabeth L. Doolittle, Pro.fect Manager PWR Project Directorate No. 5 Division of PWR I.icensing-A
Enclosure:
As stated cc: See next page Distribution:
Docket Files EJordan ACRS (10)
NRC PDR JPartlow MRushbrook I.PDR BGrimes PD#5 Rdg. Files OGC-Bethesda E. Doolittle TNovak P'P EDoolittle:.is 11/
/86 0FFICIAI. RECORD COPY l
8612010343 861118 PDR ADOCK 05000423 P
PDR t
p via UNITED STATES 8
'o NUCLEAR REGULATORY COMMISSION h
WASHINGT ON, D. C. 20555
%"'....,/
NOV 151986 Docket No.:
50-423 Mr. John F. Opeka Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company P.O. Box 270 Partford, CT 06141-0270
Dear Mr. Opeka:
SUBJECT:
DRAFT SAFETY EVAI.UATION REPORT FOR MIU. STONE NUCl. EAR POWER STATION, UNIT NO. 3, REACTOR C001. ANT PUMP TRIP (GENERIC 1.ETTER 85-12)
The staff has completed a preliminary review to assess the completeness and adequacy of your response to Generic l.etter 85-12. Your response was found to be incomplete in several of the areas evaluated.
The Draft SED (Enclosure 1) provides our initial conclusions and their bases. This information should be used as the basis for a telephone confer-ence call prior to preparation of your response.
It is anticipated that much of the needed clarification will be obtained durino the conference call.
I plan to contact your licensing staff within approximately two weeks of the date of this letter to arrange the call.
Sincerely, Elizab I., Doolittle, Project Manager PWR Project Directorate No. 5 Division of PWR l.icensing-A
Enclosure:
As stated cc: See next page
Mr. J. F. Opeka Millstone Nuclear Power Station 6
Northeast Nuclear Energy Company Unit No. 3 cc:
Gerald Garfield, Esq.
Ms. Jane Spector Day, Berry & Poward Federal Energy Regulatory Commission City Place 825 N. Capitol Street, NE Partford, Connecticut 06103-3499 Room 8608C Washington, D.C.
20426 Mr. Maurice R. Scully, Executive Director Mr. Kevin McCarthy, Director Connecticut Municipal Electric Radiation Control Unit Enercy Cooperative Department of Environmental Protection 268 Thomas Road State Office Building Groton, Connecticut 06340 Partford, Connecticut 06115 Robert W. Bishop, Esq.
Corporate Secretary Northeast Utilities Post Office Box 270 Hartford, Connecticut 06141 Mr. Thomas Shediosky Senior Resident inspector Office U. S. Nuclear Regulatory Commission Millstone III P. O. Box 811 Niantic, Connecticut 06357-08 Mr. Michael L. Jones, Manager Pro.iect Management Department Massachusetts Municipal Wholesale Electric Company Post Office Box 426 ludlow, Massachusetts 01056 Regional Administrator U. S. NRC, Recion i 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Karl Abraham Public Affairs Office, Reaion I U. S. Nuclear Regulatory Commission, King of Prussia, Pennsylvania 19406
-_