Forwards Engineering Assurance Program Insp Rept 50-412/86-17 on 860602-06.No Violation Noted.Items Identified in Insp Rept 50-412/86-09 Satisfactorily Resolved & Considered Closed,Except for Two Listed Items
ML20214J539
Person / Time
Site: Beaver Valley
Issue date: 08/13/1986
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20214J540 List:
References
TAC-62939, NUDOCS 8608150062
Download: ML20214J539 (3)


See also: IR 05000412/1986017

Text

Dcs

.

.

bue

.g[*

UNITED STATES

.,

'

g

NUCLEAR REGULATORY COMMISSION

j

WASHINGTON, D. C. 205S5

D

6

%,* o

E

s.,,

AUG 13 1906

D:cket No. 50-412

Mr. J. J. Carey, Vice President

Duquesne Light Company

Nuclear Group

P. O. Box 4

-

Shippingport, PA 15077

-

-

Dear Mr. Carey:

SUBJECT:

BEAVER VALLEY POWER STATION UNIT NO. 2 (BV-2) ENGINEERING

ASSURANCE (EA) PROGRAM INSPECTION REPORT 50-412/86-17

This letter conveys the results of the implementation inspection of the

review plan for the Duquesne Light Company (DLC) EA Technical Audit

(Ref. EA-lll, " Program for Completion of the Engineering Assurance In-Depth

Technical Audits of Beaver Valley 2 Project," dated April 23,1986).

The

inspection was conducted by the NRC's Office of Inspection and Enforcement and

consultants.

The inspection took place at the offices of Stone and Webster

Engineering Corporation (SWEC), Boston, Massachusetts from June 2, 1986 to

June 6, 1986.

,

The NRC's implementation inspection of the EA Technical Audit of BV-2 was

organized into five disciplines:

mechanical systems, mechanical components,

civil / structural, electrical power, and instrumentation and controls (I&C).

In each of these areas, the NRC inspector assessed whether the audit was being

conducted in accordance with the approved review plan and supporting procedures

and whether the audit was being conducted in sufficient technical depth and

detail to be an acceptable mechanism for providing additional a::surance that

!

the design of BV-2 complies with all licensing commitments and regulatory

i'

requirements.

In addition, the NRC team evaluated the action taken in response

to concerns from the previous NRC inspections.

The NRC team finds that the EA In-Depth Technical Audit of BV-2 is being con-

ducted in accordance with the approved review plan and supporting audit plans

ard that the audits are generally being conducted in sufficient technical depth

to achieve program objectives.

Except for two items in the mechanical components

area (as noted in Encloture 2 to the enclosed inspection report), items identi-

fied in NRC Inspection Report 50-412/86-09, dated June 17, 1986, have been satis-

factorily acted upon or otherwise resolved with the NRC team and are considered

to be closed.

i

j

6

9

e6081500gG$hi2

PDR

ADO

pgg

G

-

.

,

~

J. J. Carey

-2-

,

General and specific comments of the NRC team are provided in the enclosed

inspection report.

Resolution of the items identified in this report will be

determined by the NRC team during our final inspection of audit resdits and

corrective actions, currently scheduled for the week of September 22, 1986.

Sincerely,

/T

ian K. Grimes, Dir

or

ivision of Quality ssurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

.

..

.

Enclosures:

As stated

cc:

see next page

i

i

l

,

.

1

l

i

!

l

_ _ . _ _ _ _ _

_

. .

.

_ _ _ _ _ , _ _ _ , _ _ _ _ . _ _ _ _ _ _ _ _

_ -_

'

.

.

Mr. J. J. Carey

Beaver Valley 2 Power Station

,

- Duquesne Light Company

ec:

Mr. R. E. Martin, Manager

Gerald Charnoff, Esq.

Regulatory Affairs

Jay E. Silberg, Esq.

Duquesne Light Company

Shaw, Pittman, Potts & Trowbridge

Beaver Valley Two Pro. ect

i

1800 M Street, N.W.

Washington, DC 20036

P. O. Box 328

Pittsburgh, Pennsylvania

15077

Zori Ferkin

Mr. C. W. Ewing, Quality Assurance

Assistant Counsel

Manager

Governor Energy Council

Quality Assurance Department

1625 N. Front Street

Duquesne Light Company

Harrisburg, PA 15105

P. O. Box 186

Shippingport, Pennsylvania 15077,

-

Director, Pennsylvania Emergency

Management Agency

Room B .a1

Transportation & Safety Building

Harrisburg, Pennsylvania

17120

Mr. Thomas Gerusky

'

Mr. T. J. Lex

Bureau of Rediation Protection

Westinghouse Electric Corporation

PA Department of Environmental

Power Systems

Resources

P. O. Box 355

P. O. Box 2063

Pittsburgh, Pennsylvania 15230

Harrisburg, Pennsylvania 17120

Mr. P. RaySircar

BVPS-2 Records Management Supervisor

Stons & Webster Engineering Corporation

Duquesne Light Company

P. O. Box 2325

Post Office Box 4

Boston, Massachusetts 02107

Shippingport, Pennsylvania 15077

Mr. W. Troskoski

John A. Lee, Esq.

U. S. NRC

Duquesne Light Company

P. O. 181

Shippingport, Pennsylvania 15077

10xford Centre

301 Grant Street

Mr. Thomas E. Murley, Regional Admin.

Pittsburgh, Pennsylvania 15779

U. S. NRC, Region I

631 Park Avenue

King of Prussia, Pennsylvania

15229

l

.

I

-

f

i

.

,

'-

--

-- -

-

. ,_-.

,

_