- TXX-6465, Advises of Delays in Field Verification Activities for Identification of Raceway Sleeves,Per Util 870506 Response to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Verification Will Be Completed by 870626 + (06:52:29, 4 December 2024)
- ML20214J580 + (06:52:30, 4 December 2024)
- ML20214J577 + (06:52:31, 4 December 2024)
- AECM-87-0079, Forwards Current Certificate of Coverage by Nuclear Mutual Ltd & Corrected Ani/Maelu & Nuclear Electric Insurance Ltd Certificate + (06:52:32, 4 December 2024)
- ML20214J576 + (06:52:32, 4 December 2024)
- 05000454/LER-1986-029-03, :on 861022,480-volt Breaker,Providing Overcurrent Protection for Electrical Penetration Feed to Containment Crane 1HC22G,discovered Not Tested Prior to Entry Into Mode 4.Caused by Personnel Error + (06:52:34, 4 December 2024)
- ML20214J572 + (06:52:34, 4 December 2024)
- ML20214J571 + (06:52:35, 4 December 2024)
- 05000293/LER-1986-018, :on 860629,GE Akf Model 25 Field Breaker Failed to Trip Automatically.Similar Events Occurred on 830213, 850209 & 0315.Util Investigating for Cause.Corrective Actions Will Be Completed Prior to Startup + (06:52:36, 4 December 2024)
- ML20214J569 + (06:52:37, 4 December 2024)
- ML20214J568 + (06:52:38, 4 December 2024)
- 05000528/LER-1986-047, :on 860712,reactor Tripped at 100% Power on Low Reactor Coolant Flow Signal in Steam Generator 2.Caused by 860522 Reduction in Trip Setpoints for Low Reactor Flow. New Trip Setpoints Being Evaluated + (06:52:40, 4 December 2024)
- RBG-25974, Special Rept Re Measured Settlement Value Outside Tech Spec 3.7.10-1 Limits.Probably Caused by Effects of Const Schedule on Structural Settlement.Calculation Revised to Account for Differences in Const Schedule + (06:52:40, 4 December 2024)
- ML20214J565 + (06:52:41, 4 December 2024)
- ML20214J564 + (06:52:41, 4 December 2024)
- ML20214J562 + (06:52:42, 4 December 2024)
- TXX-4826, Responds to NRC Re Violations & Deviations Noted in Insp Repts 50-445/85-16 & 50-446/85-13.Corrective Actions:Design Change Authorization 13,349 Rereviewed & Results Documented in Calculations SRB-128C,Set 2,Rev 10 + (06:52:43, 4 December 2024)
- ML20214J561 + (06:52:43, 4 December 2024)
- ST-HL-AE-1817, Forwards marked-up FSAR Pages 3.10N-7 Through 3.10N-9 & Question/Response 032.5 Re Equipment Qualification.Revs Will Be Incorporated Into Future FSAR Amend.Related Correspondence + (06:52:44, 4 December 2024)
- ML20214J558 + (06:52:45, 4 December 2024)
- ML20214J557 + (06:52:45, 4 December 2024)
- ML20214J553 + (06:52:46, 4 December 2024)
- ML20214J556 + (06:52:46, 4 December 2024)
- ML20214J551 + (06:52:47, 4 December 2024)
- ML20214J552 + (06:52:47, 4 December 2024)
- ML20214J549 + (06:52:48, 4 December 2024)
- ML20214J548 + (06:52:49, 4 December 2024)
- ML20214J545 + (06:52:49, 4 December 2024)
- PNO-II-87-029, on 870516,unit Tripped on Low Reactor Coolant Flow Rate in Loop A.Caused by Partial Closure of Hot Loop Isolation Valve.Outage of 12 Days Planned to Correct Problem.Resident Inspector Will Provide Followup + (06:52:50, 4 December 2024)
- ML20214J542 + (06:52:51, 4 December 2024)
- ML20214J539 + (06:52:51, 4 December 2024)
- ML20214J537 + (06:52:52, 4 December 2024)
- ML20214J538 + (06:52:52, 4 December 2024)
- ML20214J536 + (06:52:53, 4 December 2024)
- ML20214J534 + (06:52:54, 4 December 2024)
- ML20214J535 + (06:52:54, 4 December 2024)
- ML20214J531 + (06:52:55, 4 December 2024)
- ML20214J532 + (06:52:55, 4 December 2024)
- ML20214J530 + (06:52:56, 4 December 2024)
- ML20214J529 + (06:52:56, 4 December 2024)
- ML20214J526 + (06:52:57, 4 December 2024)
- ML20214J528 + (06:52:57, 4 December 2024)
- 0CAN078613, Forwards Revised Justifications for Continued Operation Re Limitorque Operator Concerns Expressed by NRC During 860714- 18 Audit/Insp of Environ Qualification Program,Per 860722 Telcon.Clarification of Specific Issues Provided + (06:52:58, 4 December 2024)
- ML20214J524 + (06:52:59, 4 December 2024)
- GO2-86-696, Forwards Details of Static O-Ring (Sor) Differential Pressure Switch Utilization,Per IE Bulletin 86-002, Static O-Ring Differential Pressure Switches, Dtd 860718.Four Sor Switches Utilized at Plant + (06:53:00, 4 December 2024)
- ML20214J522 + (06:53:00, 4 December 2024)
- 05000458/LER-1986-044, :on 860807,reactor Trip Occurred as Result of Turbine Bldg High Temp Isolation Trip Signal.Caused by Failure of Main Steam Moisture Separator Reheater Drain Tank Gasket.Gasket Replaced + (06:53:02, 4 December 2024)
- ML20214J517 + (06:53:03, 4 December 2024)
- ML20214J516 + (06:53:03, 4 December 2024)
- W3P87-1329, Remits Insp Fee for 860622-860927 + (06:53:04, 4 December 2024)
- ML20214J514 + (06:53:04, 4 December 2024)
- ML20214J510 + (06:53:05, 4 December 2024)