Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214M142 + (06:32:14, 4 December 2024)
- ML20214M139 + (06:32:15, 4 December 2024)
- ML20214M138 + (06:32:16, 4 December 2024)
- 05000322/LER-1987-010, :on 870210,RHR Pump D Failed to Trip During Surveillance Test.Caused by Loose Connecting Pin Due to Pin Weld Failure.All Similar Breakers Inspected.Insp Procedure & Trip Crank Replacement Procedure Written + (06:32:18, 4 December 2024)
- ML20214M135 + (06:32:19, 4 December 2024)
- ML20214M129 + (06:32:21, 4 December 2024)
- ML20214M132 + (06:32:21, 4 December 2024)
- ML20214M126 + (06:32:22, 4 December 2024)
- IR 05000424/1986071 + (06:32:23, 4 December 2024)
- ML20214M117 + (06:32:27, 4 December 2024)
- ML20214M115 + (06:32:28, 4 December 2024)
- ML20214M110 + (06:32:29, 4 December 2024)
- IR 05000054/1986002 + (06:32:36, 4 December 2024)
- ML20214M105 + (06:32:40, 4 December 2024)
- ML20214M101 + (06:32:41, 4 December 2024)
- JPN-87-029, Forwards Safety Evaluation for Deletion of Secondary Containment Cooler Temp Parameter from Facility SPDS Safety Analysis.Parameter Duplicates Functions of Secondary Area Temp Parameter + (06:32:42, 4 December 2024)
- ML20214M099 + (06:32:42, 4 December 2024)
- ML20214M096 + (06:32:43, 4 December 2024)
- AECM-86-0272, Forwards Rev 5 to Vol 1 of Administrative Procedure 01-S-04-2, Licensed Operator Requalification Training, Safety-Related, in Response to NRC 851127 Request for Addl Info + (06:32:44, 4 December 2024)
- IR 05000295/1986004 + (06:32:46, 4 December 2024)
- ML20214M088 + (06:32:47, 4 December 2024)
- NLS8600262, Semiannual Operating Rept Radioactive Effluents,Jan-June 1986 + (06:32:47, 4 December 2024)
- ML20214M087 + (06:32:48, 4 December 2024)
- 05000369/LER-1986-009-01, :on 860507,determined That Electric Motor Operators for Unit 1 Valve 1NI-10 & Unit 2 Valves 2NI-9 & 2NI-10 Insufficiently Sized to Guarantee Opening.Temporary Mod Made + (06:32:50, 4 December 2024)
- 05000364/LER-1986-010-01, :on 860804,reactor Tripped During Testing of Solid State Protection Sys.Caused by Faulty Secondary Disconnecting Contacts on Train B Reactor Trip Bypass Breakers.Contacts Replaced as Needed + (06:32:52, 4 December 2024)
- ML20214M076 + (06:32:53, 4 December 2024)
- IR 05000373/1986041 + (06:32:54, 4 December 2024)
- ML20214M073 + (06:32:55, 4 December 2024)
- ML20214M063 + (06:32:57, 4 December 2024)
- IR 05000413/1986026 + (06:32:58, 4 December 2024)
- RBG-24286, Application for Amend to License NPF-47,permitting Recirculation Flow Transmitters for Listed Three Functions to Be Calibr on 18 Month Basis.Fee Paid + (06:32:59, 4 December 2024)
- IR 05000237/1986020 + (06:33:02, 4 December 2024)
- ML20214M047 + (06:33:02, 4 December 2024)
- ML20214M044 + (06:33:03, 4 December 2024)
- ML20214M037 + (06:33:04, 4 December 2024)
- ML20214M042 + (06:33:04, 4 December 2024)
- ML20214M034 + (06:33:05, 4 December 2024)
- ML20214M031 + (06:33:06, 4 December 2024)
- ML20214M030 + (06:33:07, 4 December 2024)
- IR 05000409/1986008 + (06:33:10, 4 December 2024)
- ML20214M028 + (06:33:11, 4 December 2024)
- ML20214M026 + (06:33:12, 4 December 2024)
- IR 05000410/1986044 + (06:33:13, 4 December 2024)
- ML20214M013 + (06:33:14, 4 December 2024)
- ML20214M016 + (06:33:14, 4 December 2024)
- ML20214M011 + (06:33:15, 4 December 2024)
- ML20214M007 + (06:33:16, 4 December 2024)
- ML20214M008 + (06:33:16, 4 December 2024)
- ML20214M004 + (06:33:17, 4 December 2024)
- ML20214M000 + (06:33:18, 4 December 2024)
- ML20214L994 + (06:33:19, 4 December 2024)