ML20214M101
| ML20214M101 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 04/21/1987 |
| From: | Turbak M COMMONWEALTH EDISON CO. |
| To: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8706010171 | |
| Download: ML20214M101 (1) | |
Text
[ [ } Comme'$ wealth Edison OoM k
"-Q 4 One Fir;3 Nat onal Plaza. Chicago. Illinois DESIGNATr'D C3ICINAI; t
/ Address Reply to: Post Offc; Box 767
.j-,
\\d Chcago. Illinois 60690 0767 gg$d.
MAC pg April 21, 1987 v
m M
i na m
rator U.S. Nuclear Regulatory Commission SAFEGUARDS IfVf0RMADON Region III NO.10 799 Roosevelt Road
^
_]
Glen Ellyn, IL 60137
Subject:
LaSalle County Station Units 1 and 2 Response to I&E Inspection Report Nos.
50-373/87009 and 50-374/87009 NRC Docket Nos. 50-373 and 50-374 Reference (a):
J. A. Hind letter to Cordell Reed dated March 24, 1987.
Dear Mr. Davis:
This letter concerns the routine safety inspection conducted by Messrs. G. Pirtle, T. Madeda and J. Knicely on March 2-10, 1987, of activities at LaSalle County Station. Reference (a) indicated that certain activities appeared to be in violation of NRC requirements. The Commonwealth Edison Company response to the two severity level violations contained in the Notice of Violation is provided in the enclosure.
No response was required to the Severity Level V violation identified. Commonwealth Edison agrees that the actions identified in Section 7.b of the report are commitments that were made to your inspectors.
The Attachment to this letter contains information concerning the Security Plan for a nuclear power station and should be controlled in accordance with the provisions of 10 CFR 73.21.
If there are any questions concerning this matter, please contact this office.
Very truly yours, 1 07 73 07060 kg05 p8 M. S. Turbak PDR Operating Plant Licensing Director 4
,r9 1"
Attachment i
l cc: Region III Inspector - LSCS 2982K I