Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P266 + (06:14:50, 4 December 2024)
- IR 05000424/1986047 + (06:14:51, 4 December 2024)
- ML20214P262 + (06:14:51, 4 December 2024)
- ML20214P257 + (06:14:54, 4 December 2024)
- ML20214P255 + (06:14:55, 4 December 2024)
- ML20214P256 + (06:14:55, 4 December 2024)
- ML20214P251 + (06:14:56, 4 December 2024)
- ML20214P248 + (06:14:58, 4 December 2024)
- ML20214P249 + (06:14:58, 4 December 2024)
- ML20214P244 + (06:14:59, 4 December 2024)
- ML20214P245 + (06:14:59, 4 December 2024)
- TAC:57634 + (06:15:00, 4 December 2024)
- ML20214P241 + (06:15:01, 4 December 2024)
- 05000271/LER-1987-002, :on 870501,primary Containment Isolation Sys Group III & Subsequent Standby Gas Treatment Sys Initiation Occurred.Caused by Technician Exposing Operating Radiation Detector.Detector Location Labeled + (06:15:05, 4 December 2024)
- IR 05000424/1986100 + (06:15:09, 4 December 2024)
- ML20214P234 + (06:15:10, 4 December 2024)
- ML20214P232 + (06:15:11, 4 December 2024)
- ML20214P233 + (06:15:11, 4 December 2024)
- ML20214P230 + (06:15:12, 4 December 2024)
- ML20214P224 + (06:15:13, 4 December 2024)
- ML20214P225 + (06:15:13, 4 December 2024)
- ML20214P220 + (06:15:16, 4 December 2024)
- IR 05000123/1986002 + (06:15:17, 4 December 2024)
- ML20214P216 + (06:15:17, 4 December 2024)
- ML20214P211 + (06:15:18, 4 December 2024)
- ML20214P210 + (06:15:19, 4 December 2024)
- ML20214P208 + (06:15:20, 4 December 2024)
- ML20214P209 + (06:15:20, 4 December 2024)
- PNO-II-86-087, on 861107,employee Received Calculated Exposure of 75 Rems to One Hand,Exceeding 10CFR20,18.75 Rems Limit.Cause of Contamination Undetermined.Region II Radiation Specialist Dispatched for Followup + (06:15:21, 4 December 2024)
- ML20214P206 + (06:15:21, 4 December 2024)
- ST-HL-AE-2213, Forwards Proprietary & Nonproprietary Addl Info in Support of Elimination of Postulated Pipe Ruptures in Accumulator Lines of South Texas Projects Units 1 & 2 (WCAP-11383/11351) (10-Inch & 8-Inch RHR Piping Attached to Accumulator Line + (06:15:22, 4 December 2024)
- ML20214P199 + (06:15:23, 4 December 2024)
- ML20214P200 + (06:15:23, 4 December 2024)
- ML20214P197 + (06:15:24, 4 December 2024)
- RBG-24816, Forwards Suppl 1 to Startup Test Rept, Covering Period Through 861031.Info Submitted Per Tech Specs 6.9.1.2 & 6.9.1.3 & Reg Guides 1.16 & 1.68 + (06:15:24, 4 December 2024)
- PNO-III-86-096, on 860911,bomb Threat Received at Telephone Switchboard,Stating That Bomb Placed in Training Ctr.Ctr Evacuated & Facility Searched.No Bomb Found.Nrc Info Assessment Team Notified + (06:15:25, 4 December 2024)
- ML20214P190 + (06:15:26, 4 December 2024)
- ML20214P191 + (06:15:26, 4 December 2024)
- 05000416/LER-1986-040, :on 861027,determined That Two Weekly Surveillances of Breaker Alignment Not Performed in Required Tech Spec Time Interval.Caused by Nonlicensed Operator Oversight.Procedures Now Hand Carried + (06:15:28, 4 December 2024)
- ML20214P187 + (06:15:29, 4 December 2024)
- ML20214P182 + (06:15:30, 4 December 2024)
- PNO-III-86-094, on 860910,federal Grand Jury in State of Mi Western District Indicted Util & Jg Del Percio W/Violations of NRC Fire Protection Requirements Occurring from Mar 1981 - Apr 1982 + (06:15:30, 4 December 2024)
- ML20214P180 + (06:15:31, 4 December 2024)
- ML20214P179 + (06:15:32, 4 December 2024)
- ML20214P178 + (06:15:32, 4 December 2024)
- 05000302/LER-1986-013, :on 860815,following Control Complex Return Duct Radiation Monitor Failure,Operator Placed Control Room Ventilation Sys in Recirculation Mode Using Supply Fan. Caused by Operator Error + (06:15:34, 4 December 2024)
- ML20214P168 + (06:15:35, 4 December 2024)
- 0CAN118601, Forwards Revised Version of Integrated Implementation Plan for Tasks in Response to NUREG-0737,Suppl 1.Progress on Crdr,Spds,Emergency Operating Procedures & Reg Guide 1.97 Mods Described.Next Update Scheduled for Apr 1987 + (06:15:36, 4 December 2024)
- ML20214P167 + (06:15:36, 4 December 2024)
- 05000327/LER-1984-025-01, :on 840415,sampling of RCS for Boron Concentration Initiated,Causing Pressurizer Level Transmitter 1-LT-68-320 to Be Inoperable.Caused by Operator Error.Transmitter Moved + (06:15:38, 4 December 2024)
- ML20214P163 + (06:15:39, 4 December 2024)
- IR 05000348/1986022 + (06:15:40, 4 December 2024)