- 05000370/LER-1986-019-03, :on 861118,personnel Failed to Verify Operability of Diesel Generators 2A & 2B & Second Offsite Power Source.Caused by Personnel Error.Incident Will Be Reviewed During Requalification Training + (03:29:36, 4 December 2024)
- ML20215F651 + (03:29:37, 4 December 2024)
- ML20215F644 + (03:29:38, 4 December 2024)
- ML20215F647 + (03:29:38, 4 December 2024)
- ML20215F642 + (03:29:39, 4 December 2024)
- ML20215F641 + (03:29:39, 4 December 2024)
- ML20215F640 + (03:29:40, 4 December 2024)
- 05000324/LER-1986-025-01, :on 861120,determined That 861119 Surveillance of Reactor Jet Pump Missed.Caused by Personnel Error. Surveillance Performed Satisfactorily.Personnel Disciplined & Training Initiated + (03:29:42, 4 December 2024)
- ML20215F634 + (03:29:43, 4 December 2024)
- 05000237/LER-1986-025-04, :on 861122,grab Sample Not Connected to Chimney Effluent Sample Point.Caused by Personnel Error.Technician Involved Admonished.Comprehensive Training Planned for All Technicians to Review Tech Spec + (03:29:45, 4 December 2024)
- 05000413/LER-1987-020, :on 870514,determined That Weekly Fire Door Insp Not Performed on 870508.Caused by Personnel Error.Insp Performed Upon Discovery.Memo Issued to Remind Personnel of Insp + (03:29:48, 4 December 2024)
- 05000354/LER-1986-066, :on 860907,discovered That Surveillance Testing of Main Turbine Bypass Valve Not Performed Prior to Increasing Reactor Power Above 25%.Caused by Procedural Inadequacy.Surveillance Test Procedure Revised + (03:29:49, 4 December 2024)
- IR 05000454/1986047 + (03:29:59, 4 December 2024)
- ML20215F625 + (03:29:59, 4 December 2024)
- ML20215F622 + (03:30:02, 4 December 2024)
- ML20215F620 + (03:30:02, 4 December 2024)
- IR 05000354/1986041 + (03:30:08, 4 December 2024)
- 1CAN128602, Proposed Tech Specs Deleting Requirements for Enrichment Limit for Reload Fuel Assemblies + (03:30:09, 4 December 2024)
- ML20215F614 + (03:30:10, 4 December 2024)
- ML20215F613 + (03:30:10, 4 December 2024)
- IR 05000334/1986019 + (03:30:11, 4 December 2024)
- ML20215F611 + (03:30:11, 4 December 2024)
- ML20215F607 + (03:30:12, 4 December 2024)
- ML20215F603 + (03:30:13, 4 December 2024)
- ML20215F605 + (03:30:13, 4 December 2024)
- ML20215F601 + (03:30:14, 4 December 2024)
- ML20215F600 + (03:30:15, 4 December 2024)
- ML20215F599 + (03:30:15, 4 December 2024)
- ML20215F598 + (03:30:16, 4 December 2024)
- IR 05000321/1986031 + (03:30:17, 4 December 2024)
- ML20215F594 + (03:30:18, 4 December 2024)
- ML20215F586 + (03:30:19, 4 December 2024)
- W3P86-0044, Clarifies Discrepancy Found in Util 860214 Response to Violations Noted in Insp Repts 50-382/85-04 & 50-382/85-27. Replacement of O-rings on Rosemount 1153 Transmitter Completed on 860221 Instead of 851231 + (03:30:20, 4 December 2024)
- ML20215F580 + (03:30:21, 4 December 2024)
- 05000354/LER-1986-088, :on 861118,discovered That Low Flow Switches for RHR Room Coolers Calibr Incorrectly.Caused by Delay in Updating Calibr Documents After Startup Deviation Rept Implemented.Icd Cards Corrected + (03:30:23, 4 December 2024)
- ML20215F574 + (03:30:24, 4 December 2024)
- ML20215F577 + (03:30:24, 4 December 2024)
- ML20215F572 + (03:30:25, 4 December 2024)
- ML20215F573 + (03:30:25, 4 December 2024)
- ML20215F570 + (03:30:26, 4 December 2024)
- W3P86-0019, Responds to NRC Re Violations Noted in Insp Repts 50-382/85-04 & 50-382/85-27.Corrective Actions:Nuclear Purchasing Procedure Revised to Include Issuance of Ack Copy of Purchase Order Changes for safety-related Orders + (03:30:27, 4 December 2024)
- IR 05000416/1986037 + (03:30:40, 4 December 2024)
- 05000397/LER-1986-031, :on 860910,RCIC Inboard Steam Line Isolation Valves Closed on Erroneous RCIC Equipment Area High Temp Signal.Caused by Technicians Inadvertently Connecting Test Equipment to Wrong Circuit.Personnel Counseled + (03:30:42, 4 December 2024)
- ML20215F564 + (03:30:43, 4 December 2024)
- ML20215F563 + (03:30:43, 4 December 2024)
- U-600720, Forwards Summary of Results of Preoperational Phase Testing of Piping Vibration,Thermal Expansion & Dynamic Effects,Per FSAR Subsection 3.9.2.Tests Complete Preoperational Phase Evaluation of Piping Sys + (03:30:44, 4 December 2024)
- ML20215F559 + (03:30:44, 4 December 2024)
- ML20215F557 + (03:30:45, 4 December 2024)
- ML20215F552 + (03:30:46, 4 December 2024)
- ML20215F551 + (03:30:47, 4 December 2024)
- ML20215F549 + (03:30:48, 4 December 2024)
- ML20215F546 + (03:30:48, 4 December 2024)