d DEC 171986 Geor giower Company ATTN: Mr. J. H. Miller, Jr.
President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
1
SUBJECT:
V0GTLE UNIT 1 - STATUS OF FACILITY COMPLETION The NRC will issue an operating license to GPC for Vogtle Unit 1 once we have concluded that the commitments in the FSAR for preparing that facility for operation have been met.
Your letter to me dated November 14, 1986, generally described the status of your implementation of these commitments.
I understand that you will send me another letter which more specifically describes the status of completion of the facility including those items which will not be completed by the time of licensing.
Enclosed is a memorandum prepared by Region II to inform the Office of Nuclear Reactor Regulation of the status of preparedness for licensing Vogtle Unit 1.
This memorandum includes items requiring inspection and resolution before a finding of readiness for operation can be made.
The status of items listed in the enclosure will be closely monitored by the NRC to provide timely assessment of readiness for operation.
In addition to the items listed in the enclosed memorandum, we are reviewing your status reports onsite and inspecting construction, testing and staffing activities underway to close open items on these reports We will keep you informed of the results of our assessment. This letter and the enclosure are being placed in the Public Document Room.
Sincerely, Original Signed by M. ' L. Ernst/for J. Nelson Grace Regional Administrator l
Enclosure:
I Status of Facility Completion cc w/ encl:
J. P. O'Reilly, Senior Vice President Nuclear Operations y
g, R. E. Conway, Senior Vice President &
bo Project Director (cc w/ encl cont'd on page 2) 8612230450 861217 PDR ADOCK 05000424 A
\\
gc ol
,GeorgTa Power Company 2
DEC 171986 c
/ encl cont'd-
. O. Foster, Vice President, Project Support P. D. Rice, Vice President, Project Engineering R. H. Pinson, Vice President, Project Construction LA. Beckham, Vice President, Plant Hatch R. A. Thomas, Vice President, Licensing
'D. S. Read, General Manager, Quality Assurance C. W. Hayes, Vogtle Quality
. Assurance Manager
' W. C. Ramsey, Manager -
Readiness Review G. B. Bockhold, General Manager, Nuclear Operations L. Gucwa, Manager, Nuclear Safety and Licensing M. H. Googe, Project Construction Manager E. D. Groover, Quality Assurance Site Managar -
Construction J. A. Bailey, Project Licensing Manager G. F. Trowbridge, Esq., Shaw, Pittman, Potts and Trowbridge B. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge E. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge J. E. Joiner, Troutman, Sanders, Lockerman and Ashmore J. G. Ledbetter, Commissioner, Department of Human Resources C. H. Badger, Office of Planning a d Budget
. Kirkland, III, Counsel, Office of the Consumer's Utility Juncil C
,V. Feig, Georgians Against clear Energy
. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel Dr. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board inenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel (bec w/enci see page 3)
s, DEC 171986 Georgia Power Company 3
dcw/ encl:
Ej.eis, OGC Y.J. Hill, IE W. Miller, NRR W Brach, EDO Sinkule, RII Christnot, RII W C Resident Inspector pD.cument Control Desk State of Georgia rih RII RII RII RIJ RII RI!
E stnot:dm M kule VLB niee e
JS t'.o b r AG on t
12/9/86 12/j(,/86 1246/86 12//4./86 12/sf/86 (fot 12/p /86 12/f /86 L
/