Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215L215 + (02:43:27, 4 December 2024)
- ML20215L214 + (02:43:28, 4 December 2024)
- ML20215L211 + (02:43:29, 4 December 2024)
- ML20215L212 + (02:43:29, 4 December 2024)
- ML20215L210 + (02:43:30, 4 December 2024)
- ML20215L209 + (02:43:31, 4 December 2024)
- AECM-86-0334, Forwards Grand Gulf Nuclear Station Safety Relief Valve Fatigue Evaluation, Per OL Condition 2.C(10)(a),for Review. Safety-related Equipment in Containment Not Adversely Affected When Subj to Safety Relief Valve Loading.Fee Paid + (02:43:32, 4 December 2024)
- ML20215L205 + (02:43:33, 4 December 2024)
- IR 05000317/1987006 + (02:43:36, 4 December 2024)
- ML20215L203 + (02:43:37, 4 December 2024)
- ML20215L200 + (02:43:38, 4 December 2024)
- ML20215L199 + (02:43:39, 4 December 2024)
- ML20215L197 + (02:43:40, 4 December 2024)
- ML20215L196 + (02:43:40, 4 December 2024)
- 05000387/LER-1986-032, :on 860923,Limiting Condition for Operation 3.0.3 Entered & Cleared Four Times to Perform Surveillances on Engineered Safeguard Sys Buses.Caused by Loss of Both Channels of Degraded Voltage Protection + (02:43:42, 4 December 2024)
- ML20215L194 + (02:43:42, 4 December 2024)
- ML20215L191 + (02:43:44, 4 December 2024)
- ML20215L188 + (02:43:45, 4 December 2024)
- ML20215L190 + (02:43:45, 4 December 2024)
- ML20215L187 + (02:43:46, 4 December 2024)
- ML20215L185 + (02:43:46, 4 December 2024)
- B12287, Remits Insp Fees for Facilities & Matls Licenses for First Quarter 1986.Invoices Encl + (02:43:47, 4 December 2024)
- ML20215L179 + (02:43:48, 4 December 2024)
- ML20215L176 + (02:43:50, 4 December 2024)
- ML20215L177 + (02:43:50, 4 December 2024)
- ML20215L175 + (02:43:51, 4 December 2024)
- ML20215L172 + (02:43:52, 4 December 2024)
- ML20215L173 + (02:43:52, 4 December 2024)
- ML20215L171 + (02:43:53, 4 December 2024)
- ML20215L170 + (02:43:54, 4 December 2024)
- ML20215L169 + (02:44:02, 4 December 2024)
- ML20215L166 + (02:44:09, 4 December 2024)
- ML20215L164 + (02:44:10, 4 December 2024)
- ML20215L163 + (02:44:10, 4 December 2024)
- ML20215L162 + (02:44:20, 4 December 2024)
- AECM-86-0337, Responds to NRC 860408 Concerns Re Rev 1 to Process Control Program Description.Permanent Solid Radwaste Sys Has Not Been Utilized for Solidification of Wet Waste.Concerns Incorporated Into Encl Rev 2 to Description + (02:44:21, 4 December 2024)
- ML20215L160 + (02:44:21, 4 December 2024)
- ML20215L158 + (02:44:22, 4 December 2024)
- ML20215L156 + (02:44:23, 4 December 2024)
- ML20215L155 + (02:44:24, 4 December 2024)
- ML20215L153 + (02:44:25, 4 December 2024)
- ML20215L152 + (02:44:26, 4 December 2024)
- ML20215L151 + (02:44:26, 4 December 2024)
- ML20215L150 + (02:44:27, 4 December 2024)
- TXX-6027, Interim Deficiency Rept CP-86-63 Re Increased Scope of Pipe Support Const Deficiencies.Initially Reported on 860904. Reinsp Program to Be Conducted Reverifying Adequacy of Pipe Support Installations.Next Rept Will Be Submitted by 870202 + (02:44:28, 4 December 2024)
- ML20215L147 + (02:44:30, 4 December 2024)
- ML20215L145 + (02:44:31, 4 December 2024)
- ML20215L146 + (02:44:31, 4 December 2024)
- ML20215L144 + (02:44:32, 4 December 2024)
- ML20215L141 + (02:44:33, 4 December 2024)
- ML20215L142 + (02:44:33, 4 December 2024)
- 05000440/LER-1986-064, :on 860925,leak Detection Sys Isolation Logic Div 2 for Rwcu,Rcic & RHR Sys Inoperable for Period Exceeding Tech Spec Limit.Caused by Personnel Error. Personnel Counseled + (02:44:35, 4 December 2024)