Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6402, Revised Response to Violation Item B Noted in Insp Repts 50-445/85-18 & 50-446/85-15.Corrective Steps Taken & Action to Prevent Recurrence Sections Updated to Show Results Achieved.Dates of Full Compliance Moved to 870831 & 880331 + (02:38:27, 4 December 2024)
- ML20215L762 + (02:38:27, 4 December 2024)
- 05000277/LER-1987-004-02, :on 870407,primary Containment Isolations Occurred.Caused by Partial Loss of Offsite Power Due to Buildup of Snow on Power Lines & Contact W/Trees.Trees Near 220-kV Lines Trimmed + (02:38:29, 4 December 2024)
- ML20215L759 + (02:38:30, 4 December 2024)
- ML20215L757 + (02:38:31, 4 December 2024)
- ML20215L758 + (02:38:31, 4 December 2024)
- ML20215L756 + (02:38:32, 4 December 2024)
- ML20215L751 + (02:38:33, 4 December 2024)
- ML20215L748 + (02:38:34, 4 December 2024)
- ML20215L749 + (02:38:34, 4 December 2024)
- ST-HL-AE-2268, Responds to NRC Re Open Items Noted in Insp Repts 50-498/87-08 & 50-499/87-08.Operation Procedure 0PGP03-Z0-0003 Revised to Cause Reviewers to Ensure That Previous License Compliance Evaluation Performed + (02:38:35, 4 December 2024)
- ST-HL-AE-2032, Provides Addl Info Re Insp of Pressurizer Safety Relief Valves,Per NRC Request.Safety Relief Valves Will Be Inspected After Each Lift Involving Loop Seal or Water Discharge,Under Procedure OPMP04-RC-0024 + (02:38:35, 4 December 2024)
- ML20215L744 + (02:38:36, 4 December 2024)
- ML20215L740 + (02:38:37, 4 December 2024)
- ML20215L741 + (02:38:37, 4 December 2024)
- ML20215L739 + (02:38:38, 4 December 2024)
- ML20215L735 + (02:38:39, 4 December 2024)
- ML20215L737 + (02:38:39, 4 December 2024)
- TXX-6437, Interim Deficiency Rept CP-86-37 Re Firing Board Assemblies & Amplifier Boards in Battery Chargers That Do Not Conform to Vendor Assembly Drawings.Initially Reported on 870514.Review Continuing.Next Rept Expected by 870626 + (02:38:40, 4 December 2024)
- ML20215L732 + (02:38:41, 4 December 2024)
- ML20215L731 + (02:38:41, 4 December 2024)
- ML20215L728 + (02:38:42, 4 December 2024)
- ML20215L726 + (02:38:43, 4 December 2024)
- ML20215L723 + (02:38:44, 4 December 2024)
- ML20215L724 + (02:38:44, 4 December 2024)
- ML20215L722 + (02:38:45, 4 December 2024)
- ML20215L719 + (02:38:46, 4 December 2024)
- ST-HL-AE-2157, Advises That Category I Structures Completed.Const Dewatering of Plant Areas Terminated in Jan 1987.Monitoring of Groundwater Levels Will Continue Using Permanent Piezometer Sys + (02:38:46, 4 December 2024)
- ML20215L715 + (02:38:47, 4 December 2024)
- JAFP-87-0393, Monthly Operating Rept for Apr 1987 + (02:38:48, 4 December 2024)
- ML20215L712 + (02:38:48, 4 December 2024)
- ML20215L711 + (02:38:49, 4 December 2024)
- ML20215L709 + (02:38:50, 4 December 2024)
- ML20215L710 + (02:38:50, 4 December 2024)
- ML20215L708 + (02:38:51, 4 December 2024)
- 05000282/LER-1987-005-01, :on 870409,while in Cold Shutdown,Status Lights for Both Trains of Auxiliary & Turbine Bldgs Steam Exclusion Dampers Discovered Off.Caused by Design Flaw.Mod Initiated to Separate Power Supplies + (02:38:53, 4 December 2024)
- ML20215L704 + (02:38:53, 4 December 2024)
- ML20215L703 + (02:38:54, 4 December 2024)
- ML20215L701 + (02:38:55, 4 December 2024)
- ML20215L700 + (02:38:55, 4 December 2024)
- ML20215L699 + (02:38:56, 4 December 2024)
- ML20215L696 + (02:38:57, 4 December 2024)
- ML20215L695 + (02:38:57, 4 December 2024)
- ML20215L694 + (02:38:58, 4 December 2024)
- ST-HL-AE-2269, Informs of Intention to Disable Transfer Switch So That 13.8-kV Switchgear Will Be Connected to Normal 125 Volt Dc Control Power Source.Corrective Action Will Be Implemented by First Refueling Outage + (02:38:59, 4 December 2024)
- ML20215L693 + (02:38:59, 4 December 2024)
- ML20215L689 + (02:39:00, 4 December 2024)
- ML20215L687 + (02:39:00, 4 December 2024)
- L-87-264, Responds to Generic Ltr 86-06, Periodic Verification of Leaktight Integrity of Pressure Isolation Valves (Pivs). List of PIVs & Procedures for Periodic Test or Other Measures Performed to Assure Integrity of Valve Encl + (02:39:01, 4 December 2024)
- ML20215L685 + (02:39:02, 4 December 2024)
- ML20215L684 + (02:39:02, 4 December 2024)
- ML20215L683 + (02:39:03, 4 December 2024)