ML20215L689
| ML20215L689 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/22/1986 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Beckham J GEORGIA POWER CO. |
| References | |
| NUDOCS 8610290246 | |
| Download: ML20215L689 (2) | |
Text
t
@ 7tGQ f g, UNITED STATES y
g NUCLEAR REGULATORY COMMISSION 5-
- j WASHINGTON, D. C. 20555
- ..... j' 4
October 22, 1986 Cocket Nos.: 50-321 and 50-366 Mr. J. T. Beckham, Jr.
Vica President - Nuclear Generation Georgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 Gentlemen:
SUBJECT:
EQUIPMENT QUALIFICATION INSPECTION - EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 This letter confirms the dates of November 3 through 7,1986 for the NRC equipment qualification (EQ) inspection of Edwin I. Hatch Nuclear Plant, Units 1 and 2.
These dates were established during a telephone conversation with Mr. Trent Powers of your staff and Mr. R. C. Wilson of the NRC. We have also discussed the logistics of the inspection in detail with your staff. The entire inspection will take place at the plant site.
A management entrance meeting is scheduled for 2:30 p.m. on November 3,1986.
A management exit meeting is tentatively scheduled for 10:30 a.m. on November 7, 1986. A plant walkdown inspection of equipment is tentatively planned for November 5, 1986.
The inspection will include the following:
1.
Review of your implementation of a 10 CFR 50.49 program including preservation of the qualified status of qualified equipment.
2.
Review of your implementation of Technical Evaluation Report / Safety Evaluation Report EQ corrective action commitments.
3.
Review of EQ documentation files.
4 Physical inspection of selected equipment.
8610290246 861022 PDR ADOCK 05000321 G
e
's -
t Georgia Power Company October 22, 1986 Your cooperation with us during this inspection will be appreciated.
Should you have any questions regarding this inspection, please contact R. C. Wilson at(301)492-4841 or A. B. Ruff at (404) 331-4849.
Sincerely, oristual signed by:
Robort Heishanse i
Robert F. Heishman, Chief Vendor Program Branch l
Division of Quality Assurance, Vendor l
and Technical Training Center Programs Office of Inspection and Enforcement cc: Mr. H. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 DISTRIBUTION:
- NRC PDRIEDocketFiles]
VPB Reading DQAVT Reading JTaylor RStarostecki BGrimes HMiller JNGrace, RII GRivenback, NRR TConlon, RII ARuff, RII Algnatonus, RII RFHeishman UPotapovs RWilson 0Gormley MYost, INEL Delray MJacobus, SNL Resident Inspector U.S.N.R.C.
I Route 1, Post Office Box 279 Baxley, Georgia 31513 VPB:DQAVT SC/VPB:00AVT BC/V B:DQAVT RCWilson: sam UPotapovs RFHeishman 10/22/86 10/E7486 Igf7/86 flW EbdyvP
-