Text
%
p w
?
(ca KERRMcGEENUCLEAR COR50R/ITION P.O. tGE all. CatSCEMT. CKLAMour 73o33 April 8, 1973 gh n-11 J. A.t Hind, Directorat'e sding of Regulatory Operations
~
i, U. S. Nuclear Regulatory Commission
- s Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
- ua-
Dear Mr. Hind:
f
.e Please refer to your letter of March 19, 1975, Docket No. 70-1193 transmitting the results of the inspection by your of fice on February 18-22, 1975, of our compliance with current conditions of License No. SNM-1174.
g
,/
As required by 10 CFR 2.202, the attachment to this letter responds to the observations of your inspectors.
In accordande with 10 CFR 2 790, the enclosure to this letter should not be made available for public inspection.
rd Very truly y urs,I
- a-
/
m 1
l
(
W.!. Shelley,'C Dir etor R/g'ulation and
~
trol e
l l
1
& c.
N/3
- 4.,* Proper notification of shipments to' the consignee' were made by phone.
However, formal records of this notification were not maintained.
Beginning with the next shipment, a record will be started as proof of this notification as required by 10 CFR
()
73 70 g.
5 Proper notification of receipts to th'e shipper were made by phone.
However, formal records of this notification were not maintained. _
Beginning with the next shipment, a record will be started as proof of this notification as required by 10 CFR 73.70(g),
- 6. 'Re ords for the shipment dates indicated were not maintained, but a request was made to Tri-State requesting this irtformation.
In the future all such data vill be requested and maintained on file.
In order to provid5 additional assurance that the above items and other requirements for shipping these nuclear materials are completed, a pro-cedure and check list will be prepared.
This will be complete by April 15, 1975 In reference to the specific deviations sent to Tri-State by you, we will request a copy of their response to you and follow-up with them to determine proper compliance in their response.