Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000412/1987018 + (02:36:11, 4 December 2024)
- ML20215M008 + (02:36:12, 4 December 2024)
- ML20215M006 + (02:36:13, 4 December 2024)
- ML20215M005 + (02:36:13, 4 December 2024)
- ML20215M003 + (02:36:14, 4 December 2024)
- ML20215M004 + (02:36:14, 4 December 2024)
- ML20215L999 + (02:36:15, 4 December 2024)
- IR 05000416/1986026 + (02:36:23, 4 December 2024)
- ML20215L997 + (02:36:23, 4 December 2024)
- 05000266/LER-1987-002, :on 870409,as Found Containment Integrated Leak Rate Determined to Exceed Allowable Tech Spec Limit.Caused by Packing Failure of One Valve.Valve Replaced & Successfully Tested as Part of Leak Rate Test + (02:36:25, 4 December 2024)
- ML20215L994 + (02:36:26, 4 December 2024)
- ML20215L991 + (02:36:26, 4 December 2024)
- ML20215L990 + (02:36:27, 4 December 2024)
- ML20215L989 + (02:36:27, 4 December 2024)
- ML20215L987 + (02:36:28, 4 December 2024)
- ML20215L982 + (02:36:29, 4 December 2024)
- ML20215L980 + (02:36:32, 4 December 2024)
- ST-HL-AE-2143, Forwards Revised Pages to FSAR Tables 3.2.A-1 & 3.2.B-2 Re Quality Classification of Structures,Sys & Components. Certain Items in Tables Proposed for Deletion in Retained Per Discussions W/Nrc + (02:36:33, 4 December 2024)
- TXX-6439, Informs That Date for Full Compliance Re Enforcement Action EA-86-009,App B,Item I.B.2 Revised to 871030.Review of Vendor Drawings Being Performed as Part of Corrective Action Taking Longer than Expected + (02:36:33, 4 December 2024)
- ML20215L975 + (02:36:34, 4 December 2024)
- ML20215L972 + (02:36:35, 4 December 2024)
- TXX-6046, Interim Deficiency Rept CP-85-19 Re Conduit Support Spans. Initially Reported on 850515.Field Verifications & Engineering Evaluations Continuing for Unit 1.Design Verification Conducted for Unit 2.Next Rept by 870310 + (02:36:36, 4 December 2024)
- ML20215L968 + (02:36:37, 4 December 2024)
- ML20215L967 + (02:36:38, 4 December 2024)
- ML20215L966 + (02:36:39, 4 December 2024)
- ML20215L965 + (02:36:39, 4 December 2024)
- ML20215L963 + (02:36:40, 4 December 2024)
- ML20215L964 + (02:36:40, 4 December 2024)
- ML20215L956 + (02:36:42, 4 December 2024)
- ML20215L954 + (02:36:42, 4 December 2024)
- ML20215L952 + (02:36:43, 4 December 2024)
- ST-HL-AE-2153, Forwards Excerpt from Amend 6 to Plant Fire Hazard Analysis Rept,Section 2.4.1.2 Re Charging Pump Suction Gravity Pump. Section Changed to Describe Ability of Charging Pumps to Take Suction from Gravity Drain Sys of Boric Acid Tanks + (02:36:43, 4 December 2024)
- ML20215L951 + (02:36:44, 4 December 2024)
- ML20215L948 + (02:36:46, 4 December 2024)
- ML20215L945 + (02:36:46, 4 December 2024)
- ML20215L944 + (02:36:47, 4 December 2024)
- ML20215L942 + (02:36:48, 4 December 2024)
- 05000483/LER-1987-003, :on 870402,reactor Protection Sys Actuation Occurred Due to Water Level in Steam Generator Decreasing lo-lo Level Trip Setpoint.Caused by Open Power Supply Breaker.Breaker Replaced & Workers Retrained + (02:36:49, 4 December 2024)
- ST-HL-AE-2156, Informs That Util Will Wrap Solid State Protection Sys (Ssps) Demultiplexer & Time Synchronization Cables to Resolve NRC Concerns During 870504 Meeting That Deviation from Reg Guide 1.75 Unacceptable + (02:36:50, 4 December 2024)
- ML20215L936 + (02:36:52, 4 December 2024)
- ML20215L934 + (02:36:53, 4 December 2024)
- ML20215L933 + (02:36:54, 4 December 2024)
- ML20215L932 + (02:36:54, 4 December 2024)
- TXX-6052, Interim Deficiency Rept CP-86-46 Re Gould Battery Racks Transverse Bracing.Originally Reported on 860611.Engineering Procedure Revised to Provide More Detailed Instructions. Next Rept Anticipated by 870501 + (02:36:55, 4 December 2024)
- IR 05000423/1987009 + (02:36:57, 4 December 2024)
- ML20215L929 + (02:36:57, 4 December 2024)
- ML20215L927 + (02:36:58, 4 December 2024)
- ML20215L928 + (02:36:58, 4 December 2024)
- ML20215L925 + (02:36:59, 4 December 2024)
- ML20215L923 + (02:37:00, 4 December 2024)
- PNO-III-86-119, on 861020,northwest District of Ohio Assoc of Public School Employees Signed Resolution Opposing Member Participation in Planning or Actual Participation in Evacuation Caused by Nuclear Plant Accident + (02:37:00, 4 December 2024)
- ML20215L921 + (02:37:01, 4 December 2024)