ML20215L999
| ML20215L999 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 05/06/1987 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Carey J DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20215M002 | List: |
| References | |
| TAC-62924, NUDOCS 8705130053 | |
| Download: ML20215L999 (2) | |
See also: IR 05000412/1987018
Text
.4
i
.
i
MAY 0 61987
Docket No.: 50-412
Duquesne Light Company
ATTN: Mr. J. J. Carey
Senior Vice President, Nuclear Group
Post Office Box 4
Shippingport, Pennsylvania
15077
Gentlemen:
Subject:
Inspection 50-412/87-18
This refers to the routine resident safety' inspection by Messrs. J. Beall and
L. Prividy on March 1 - April 12,1987, at the Beaver Valley Power Station, Unit
2, Shippingport, Pennsylvania.
The inspection consisted of document reviews, in-
terviews and observation of construction and preoperational test activities.
The
findings were discussed with Mr. R. Swiderski of your staff.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter.
Within these areas, the inspection con-
sisted of selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspectors.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation enclosed herewith as Appendix A.
The violations have been
categorized by severity level in accordance with the " General Statement of Policy
and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C.
You are
required to respond to the enclosed Notice, and in preparing your response, you
should follow the instructions specified therein. As we discussed on the phone
on 5/5/87, these violations should be resolved with the NRC prior to initial cri-
ticality (see enclosed inspection report items 11 and 12).
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation is appreciated.
Sincerely,
Original S16ned By*
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report 50-412/87-18
8705130053 870506
DR
ADOCK 0500
2
I ]
y
,
-
.
.
.
.
. -
-
.
.
.
.
.
.
.
~\\
3 ::
~'
- .
..
Duquesne Light Company
2
0 6 1987
~,
cc w/encls:
.J. D. Sieber, Vice President, Nuclear
J.-Crockett, Senior Manager, Nuclear Operations
E. Ewing, Quality Assurance Manager
R. J. Swiderski, Manager, Startup Group
J. P. Thomas, Manager, Engineering
R. E. Martin,. Manager, Regulatory Affairs
C. O. Richardson, Stone and Webster Engineering Corporation
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
'
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
DRP Section Chief
T. Martin, DRSS
S. Ebneter, DRS
P. Tam, LPM, NRR
R. J. Bores, DRSS
A. Lodewyk, DRS
S. Pindale, RI, BV-1
A. Asars, RI, Haddam Neck
<
'
RI:DRP
R:
D
R-
/ )P
J.B.
/
(. Beall/meo
Tr pp
W z l
er
4/23/87
j
-
.
'
0FFICI L RECORD COPY
-
-
- -
-
-
- -
-
-
-
-
- - -
-
-
- -
--
-
-
-
-
-
- -