Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19332D335 + (07:34:30, 31 December 2024)
- ML19332D334 + (07:34:31, 31 December 2024)
- NRC-89-0215, Application for Amend to License NPF-43,deleting License Condition 2.C(7) & Revising Tech Spec 3/4.7.2 to Provide Surveillance Requirements for Periodic Leakage Testing & Visual Insp of Control Room Emergency Filteration Sys + (07:34:32, 31 December 2024)
- IR 05000424/1989030 + (07:34:33, 31 December 2024)
- ML19332D330 + (07:34:35, 31 December 2024)
- ML19332D327 + (07:34:36, 31 December 2024)
- ML19332D328 + (07:34:36, 31 December 2024)
- ML19332D326 + (07:34:37, 31 December 2024)
- NRC-89-0265, Application for Amend to License NPF-43,revising Tech Spec Figure 3.2.3-2 Re Flow Correction Factor Concerning Cycle 2 Reload to Correct Error in Amend 42,Tech Spec 3.2.4 Re Fuel Bundle Types & Ref of New Figures in Tech Spec 4.2.3.1 + (07:34:38, 31 December 2024)
- ML19332D323 + (07:34:39, 31 December 2024)
- ML19332D321 + (07:34:40, 31 December 2024)
- ML19332D320 + (07:34:41, 31 December 2024)
- IR 05000395/1989020 + (07:34:42, 31 December 2024)
- ML19332D317 + (07:34:44, 31 December 2024)
- ML19332D316 + (07:34:45, 31 December 2024)
- ML19332D315 + (07:34:46, 31 December 2024)
- PNO-I-89-093, in Jan & May 1989,urinalysis for Worker in Nickel Plating Lab Indicated Uptake of Ni-63 at 120 MPC H. Dupont Took 98 Contaminated Samples from Employees Apartment & 19 Samples from Car.Investigation Continuing + (07:34:48, 31 December 2024)
- ML19332D313 + (07:34:50, 31 December 2024)
- PNO-II-89-077, on 891115,high Winds from Storm Caused Damage to Electrical Switchyard.Section of 500 Kv Transmission Line Knocked Out & Electrical Equipment Damaged,Resulting in Spill of 3 Gallons of Pcb.Util Notified State of AL & EPA + (07:34:52, 31 December 2024)
- 05000346/LER-1989-015, :on 890924,RCS Flow Transmitter Out of Tolerance When Reactor Protection Sys Channel 2 Returned to Operable Status.Caused by leak-by in Instrument Manifold Seen as Zero Shift.Transmitter Recalibr + (07:34:53, 31 December 2024)
- ML19332D310 + (07:34:56, 31 December 2024)
- ML19332D309 + (07:34:57, 31 December 2024)
- ML19332D307 + (07:34:58, 31 December 2024)
- ML19332D306 + (07:34:59, 31 December 2024)
- ML19332D303 + (07:35:00, 31 December 2024)
- ML19332D302 + (07:35:01, 31 December 2024)
- ML19332D301 + (07:35:02, 31 December 2024)
- ML19332D300 + (07:35:02, 31 December 2024)
- ML19332D299 + (07:35:03, 31 December 2024)
- ML19332D298 + (07:35:04, 31 December 2024)
- ML19332D296 + (07:35:07, 31 December 2024)
- W3P89-1552, Advises That Same Special Security Measures Used During Refueling Outage II Will Be Reinstituted During Upcoming Refueling Outage Scheduled for 890922 + (07:35:10, 31 December 2024)
- ML19332D295 + (07:35:10, 31 December 2024)
- ML19332D292 + (07:35:13, 31 December 2024)
- ML19332D291 + (07:35:13, 31 December 2024)
- ML19332D290 + (07:35:14, 31 December 2024)
- ML19332D288 + (07:35:15, 31 December 2024)
- ML19332D287 + (07:35:17, 31 December 2024)
- ML19332D286 + (07:35:18, 31 December 2024)
- ML19332D285 + (07:35:19, 31 December 2024)
- ML19332D284 + (07:35:20, 31 December 2024)
- ML19332D283 + (07:35:21, 31 December 2024)
- ML19332D282 + (07:35:23, 31 December 2024)
- ML19332D281 + (07:35:24, 31 December 2024)
- ML19332D279 + (07:35:25, 31 December 2024)
- ML19332D277 + (07:35:26, 31 December 2024)
- ML19332D275 + (07:35:28, 31 December 2024)
- ML19332D276 + (07:35:28, 31 December 2024)
- ML19332D271 + (07:35:29, 31 December 2024)
- ML19332D267 + (07:35:31, 31 December 2024)
- ML19332D266 + (07:35:31, 31 December 2024)
- ML19332D264 + (07:35:32, 31 December 2024)