Forwards Request for Addl Info Re Plant Settlement Monitoring Program to Complete Review
ML19332D267
Person / Time
Site: Vogtle  
Issue date: 11/21/1989
From: Hopkins J
Office of Nuclear Reactor Regulation
To: Hairston W
GEORGIA POWER CO.
References
TAC-73574, TAC-73575, NUDOCS 8911300236
Download: ML19332D267 (3)


Text

g, e-.

.e' "1:

  1. p' 13 jM,
  • ~ ' '

J

,,e Qi M u m

NW, f' 4 t.

$ijp"\\;

150-424:

i Novembtr 21, 1989 D + ?.

  • ~

J* (Docket Nos.

i

50-425r

}

%v a

~

i r

, f's; t

Mr. W. G..~Hairston,tIII g

L iSenior Vice President --

i a

L

-Nuclear Operations

  • -l Georgia Power Company P.O. Box.1295 sa y

iBirmingham,zAlabama" 35201.

i 4

iDeArLMr.Hairston:'

+

^ SUBJECTU< REQUEST FOR ADDITIONAL INFORMATION:.V0GTLE SETTLEMENT MONITORING PROGRAM (TACS 73574/73575)-

c The NRC' staff is reviewing the Vogtle Settlement Monitoring Program: described in the: letter submitted June 23,'1989.- The NRC: staff finds that it'needs.

4 additional-information in order to; complete its review. Enclosed is the crequest for ; additional )information for. which we request a response.- If you Lhave any. questions, contact me.

?

The! reporting and/or recordkeeping-requirements contained in this letter.

' affectefewer. than 10 respondents;' therefore, OMB.earance is' not required sq

'under P.L.96-511'.

t m

Sincerely,s i

j ;,,

f p

.b 4

Jon B.'Hopkins, Project, Manager.

Project Directorate.II-3

.t Division ~ of Reactor Projects:- I.7

'l Office of Nuclea'r Reactor Regulation;

+

^

Enclosure:

As stated a

)

Y cc w/ encl:.

l '

LSee next page-

)

~

c lE Distribution:

5/

i.

(N E. Jordan MNBB-3302 b

NRC &LLocal PDR-ACRS (10) 9/A/2 l w o' PD.II-31R/F-Vogtle File i

e M80 S.-Varga 14/E/4 i

~

1

$g$

i

.G.LLainas 14/H/25-i

' imo D. Matthews e,.o x R. Ingram '

l48

. OGC (pkinsinfo. only.)

15/B/18 O,i

~

J. Ho loo

' oc

\\

w>

P&

-0FFICIAL RECORD COPY f oso Document Name:

V0GTLE RAI SETTLEMENT MON

\\l

" " '"jlA:PDIII-PM:PDII3 D:PDII %

N

' Ring @ra C 4Hopkins:sa DMatthews 4 / /89 gg/g]/89

// /;b/89 r

e m

t.,

_y

%l'

.1 i,,

.Mr. W' G. Hairston,-III t

' Georgia. Power Company Vogtle Electric Generating Plant i

CC:

Mr. J. A. Bailey

-Resident Inspector-Manager - Licensing Nuclear Regulatory Commission Georgia Power Company P.O. Box 572 P.O. Box 1295 Waynesboro, Georg4 3 30830

~ Birmingham, Alabama 35201 James'E. Joiner, Esq.

Bruce W.-Churchill, Esq.

Troutmen, Sanders, Lockerman, Shaw, Pittman, Potts and Trowbridge

& Ashmore 2300 N Street, N.W. -

1400 Candler Building Washington, D.C.'20037 127 Peachtree Street, N.E.

Atlanta, Georgia 30303 Mr.: G. - Bockhold, Jr.

General Manager, Vogtle Electric Mr. R. P. Mcdonald

' Generating Plant Executive Vice President -

P.O. Box'1600 Nuclear Operations Waynesboro,: Georgia 30830 Georgia Power Company P.O. Box 1295 Regional Administrator, Region II Birmingham, Alabama 35201 U.S. Nuclear Regulatory Commissien

-l 101 Marietta Street, N.W., Suite 2900 Mr. J. Leonard Ledbetter, Director Atlanta,' Georgia -30323 Environmental Protection Division Department of Natural Resources Office of the County Connissioner 205 Butler Street, S.E., Suite 1252 Burke County Commission = _

Atlanta, Georgia 30334 Waynesboro,- Georgia 30830 c

Office of Planning and Budget Attorney General

?

Room 615B Law Department l.

270 Washington Street, S.W.

132 Judicial Building-Atlanta, Georgia 30334 Atlanta, Georgia 30334 u

Mr. C. K. McCoy Mr. Alan R. Herdt, Chief l.

<Vice Presient - Nuclear, Vogtle Project Project Branch #3 i

Georgia Power Company U.S. Nuclear Regulatory Commission P.O. Box 1295 101 Marietta Street, NW, Suite 2900 l-Birmingham, Alabama 35201 Atlanta, Georgia 30323 1

l l

l

m_

n.d L

,,e.

,;s s

ENCLOSURE 1 V0G1LE ELECTRIC GENERATING PLANT' UNITS 1 & 2' SETTLEMENT MONITORING PROGRAM REQUEST FOR ADDITIONAL INFORMATION (STRUCTURALANDGEOS'CIENCESBRANCH) r 1.(a) Provide a detailed description of the surveying procedures used to

- relocate settlement markers including' the details of quhlity 0

control / quality assurance procedures.

-i The staff is particularly interested in the methods and results'of relocating markers from inside a t

structure to a location outside the structure.

- (b) State-if, and how, the surveying procedures used in the settlement monitoring program at Vogtle meet the standards of professional surveying procedures accepted in the field.of surveying.

2.(a) Provide a layout and longitudinal section of buried pipelines showing location of markers; areas where the pipes are embedded in soils; and areas where they are routed through tunnels.

(b) Provide calculated and actual differential settlements experienced by

-buried pipes-going from soil to Category I ' structures, and compare them with the allowable-differential settlements.