Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19260D740 + (17:29:44, 3 January 2025)
- ML19260D739 + (17:29:45, 3 January 2025)
- ML19260D738 + (17:29:47, 3 January 2025)
- ML19260D736 + (17:29:48, 3 January 2025)
- ML19260D734 + (17:29:50, 3 January 2025)
- ML19260D733 + (17:29:51, 3 January 2025)
- ML19260D732 + (17:29:53, 3 January 2025)
- ML19260D731 + (17:29:55, 3 January 2025)
- ML19260D730 + (17:29:56, 3 January 2025)
- ML19260D729 + (17:29:57, 3 January 2025)
- ML19260D728 + (17:29:59, 3 January 2025)
- ML19260D727 + (17:30:01, 3 January 2025)
- ML19260D726 + (17:30:02, 3 January 2025)
- ML19260D725 + (17:30:04, 3 January 2025)
- ML19260D722 + (17:30:06, 3 January 2025)
- ML19260D721 + (17:30:07, 3 January 2025)
- ML19260D718 + (17:30:08, 3 January 2025)
- ML19260D716 + (17:30:10, 3 January 2025)
- ML19260D714 + (17:30:11, 3 January 2025)
- ML19260D713 + (17:30:15, 3 January 2025)
- ML19260D712 + (17:30:16, 3 January 2025)
- ML19260D710 + (17:30:18, 3 January 2025)
- ML19260D709 + (17:30:20, 3 January 2025)
- ML19260D707 + (17:30:22, 3 January 2025)
- ML19260D708 + (17:30:22, 3 January 2025)
- ML19260D706 + (17:30:24, 3 January 2025)
- 05000282/LER-1980-006-01, /01T-0:on 800123,during Testing of Diesel Generator D-21,ability to Reduce Generator Load from Control Room Was Lost.Caused by Loose Front End Shield on Governor Synchronizing Motor.Motor Replaced + (17:30:26, 3 January 2025)
- ML19260D704 + (17:30:28, 3 January 2025)
- ML19260D703 + (17:30:29, 3 January 2025)
- 05000282/LER-1980-006, Forwards LER 80-006/01T-0 + (17:30:30, 3 January 2025)
- ML19260D700 + (17:30:31, 3 January 2025)
- ML19260D697 + (17:30:33, 3 January 2025)
- 05000293/LER-1980-002-02, /02T-0:on 800124,cable Separation Inadequacy Discovered Following Review of IE Info Notice 79-32. Affected Automatic Depressurization Sys Cables Will Probably Be Rerouted + (17:30:35, 3 January 2025)
- ML19260D695 + (17:30:36, 3 January 2025)
- ML19260D694 + (17:30:37, 3 January 2025)
- 05000293/LER-1980-002, Forwards LER 80-002/02T-0 + (17:30:39, 3 January 2025)
- ML19260D690 + (17:30:40, 3 January 2025)
- ML19260D689 + (17:30:40, 3 January 2025)
- ML19260D688 + (17:30:42, 3 January 2025)
- ML19260D686 + (17:30:43, 3 January 2025)
- 05000368/LER-1979-087-03, Updated LER 790987/03X-1:on 791114,during Mode 5 Operation, Leak Was Discovered in Socket Weld on LPSI Flow Orifice Valve 2SI-5091B.Failure Resembles Mechanical Fatigue Failure of Weld.Valve Replaced & Socket Weld Dye Penetr + (17:30:44, 3 January 2025)
- 05000368/LER-1980-002-03, /03L-0:on 800110,during Mode 1 Operation,Core Protection Calculator C Failed,Resulting in DNBR & Linear Power Density Trips in Channel C Primary Power Sys.Cause Undetermined.Sys Restarted During Failure Analysis + (17:30:47, 3 January 2025)
- ML19260D683 + (17:30:48, 3 January 2025)
- ML19260D682 + (17:30:49, 3 January 2025)
- ML19260D681 + (17:30:50, 3 January 2025)
- 05000368/LER-1980-001-03, /03L-0:on 800107,during Mode 1 Operation, Containment Isolation Valve 25V-5876-2 Failed to Close After Taking Samples from Safety Injection Tanks for Boron Analysis.Caused by Faulty Valve Position Indication + (17:30:51, 3 January 2025)
- ML19260D678 + (17:30:53, 3 January 2025)
- 05000368/LER-1979-087, Forwards LERs 80-001/03L-0,80-002/03L-0 & Updated LER 79-087/03X-1 + (17:30:54, 3 January 2025)
- ML19260D674 + (17:30:55, 3 January 2025)
- 05000245/LER-1980-001-03, /03L-0:on 800103,runback of Recirculation Pump a Resulted in Pump Speed Mismatch Greater than 10%.Resulted in Possible Error in LPCI Loop Selection Logic.Caused by Electronic Saturation.Sys Mods Being Considered + (17:31:00, 3 January 2025)
- 05000333/LER-1980-008-03, /03L-0:on 800109,while Performing Surveillance, Core Spray Valve 14-MOV-12B Failed to Open as Required. Caused by Torque Switch Not Being Bypassed for Sufficient Time Period.Adjusted Torque & Limit Switches + (17:31:01, 3 January 2025)