/ E/!N r
[o UNITED STATES 8(g T e g
NUCLEAR REGULATORY COMMISSION g
3 j
WASHINGTON. D. C. 20555
'+
JA!i ?. 51980 Docket No:
50-364 Mr. Alan R. Barton Senior Vice President Alabama Power Company 600 North 18th Street Birmingham, Alabama 35291
Dear Mr. Barton:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR FARLEY 2 OPERATING LICENSE APPLICATION As a nisult of our continuing review of the operating license application for the Joseph M. Farley Nuclear Plant Unit 2, we have developed the enclosed request for additional infomation.
Please provide the infomation requested in the enclosure.
Our review schedule it based on the assumption that the additional infomation will be available for our review by March 15, 1980.
If you cannot meet this date, please inform us within 7 days after receipt of this letter so that we may revise our scheduling.
Sincerely, e
oh F. Stolz, Chief t Water Reactors Branch No.1 Division of Project Management
Enclosure:
Request for Additional Infomation CC:
See next page 1952 269 80o212o O \\ 9
Mr. F. L. Clayton, Jr.
cc:
Mr. Alan R. Barton Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 Mr. Ruble A. Thomas Vice President Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Mr. George F. Trowbridge Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 O
e 1952 270
1 ENCLOSURE REQUESTS FOR ADDITIONAL INFORMATION JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 DOCKET NO. 50-364
, Requests from the following branches in NRC are included in this enclosure.
Requests and pages are numbered sequentially with respect to requests trans-mitted following issuance of SER Supplement No. 3.
Branch Page No.
Mechanical Engineering Branch 110-1 to 110-15 1952 271
110-1 110.0 MECHANICAL ENGINEERING BRANCH 110.1 10CFR50.55a has recently been revised with respect to pump and (3.9.6) valve inservice testing requirements.
(See the October 9,1979 Federal Register, pp. 57912-4.)
Provide a program for the preservice testing and initial 120 month inservice testing of pumps and valves.
as requiredby 10CFR50.55a(g)(2) for preservice testing and (g)
?
(4)(1) for the initial 120 month period. Since inservice testing requirements were not included in the Code until the Sumer 1973 Addenda of the 1971 edition, which is later than the CP date for Farley 2, you have the option of meeting that edition and addenda or later ones to the extent practical for your preservice program.
The applicable Code for your initial 120 month inspection interval which would be required by 10CFR50.55a(g)(4)(1) is the Code endorsed by 10CFR50.55a(b)(2) 12 months prior to the date of issuance of your OL.
Until November 1,1979, the latest endorsed version.of Section XI was the 1974 Edition through the Summer 1975 Addenda.
However, effective November 1,1979,10CFR50.55a(b)(2) endorsed the 1977 Edition with all addenda through Summer 1978. With the current uncertainty in estimating whether your OL date will be before or after November 1,1980, it is difficult to determine which Code addenda would be required by 10CFR50.55a(g)(4)(i). We therefore recommend that you base your initial 120 month inservice testing program on the 1977 Edition with all addenda through Summer 1978 as permitted by 10CFR50.55a(g)(4)(iv).
Your preservice and initial 120 month interval programs should indicate which Code requirements are impractical to meet together with documentation for justification why relief is necessary.
The attached format should be used when submitting your IST progra::.
)
I 1952 272
.i 110-2 NRC STAFF COMMENTS ON INSERVICE PUMP AND VALVE TESTING PROGRAMS AND RELIEF REQUESTS The NRC staff, after reviewing a number of pump and valve testing programs, has determined that further guidance might be helpful to illustrate the type and extent of information we feel is necessary to expedite the review of these programs. We feel that the Licensee can, by incorporating these guidelines into each program submittal, reduce considerably the staff's review time and time spent by the Licensee in responding to NRC staff requests for additional information.
The pump testing program should include all safety related* Class 1, 2, and 3 pumps which are installed in water cooled nuclear power plants and which are provided with an emergency power source.
The valve testing program should include all the safety related valves in the following systems excluding valves used for operating convenience only, such as manual vent, drain, instrument, and test valves, and valves used for maintenance only.
PWR a.
High Pressure Injection System b.
Low Pressure Injection System c.
Accumulator Systems d.
Containment Spray System
' Safety related - necessary to safely shut down the plant and mitigate the consequences of an accident.
1952 273
J 110-3 e.
Primary and Secondary Syst'em Safety and Relief Valves f.
Auxiliary Feedwater Systems 9
Reactor Building Cooling System h.
Active Components in Service Water and Instrument Air Systems which are required to support safety system functions.
- i. Containment Isolation Valves required to change position to isolate containment.
J.
Chemical & Volume Control System k.
Other key components in Auxiliary Systems which are required to directly support plant shutdown or safety system function.
1.
Residual Heat Removal System m.
High Pressure Core Injection System b.
Low Pressure Core Injection System c.
Residual Heat Removal System (Shutdown Cooling System) d.
Emergency Condenser System (Isolation Condenser System) e.
Low Pressure Care Spray System f.
Containment Spray System g.
Safety, Relief, and Safety / Relief Valves h.
RCIC (Reactor Core Isolation Cooling) System
- i. Containment Cooling System j.
Containment isolation valves required to change position to isolate containment.
1952 274
s 110-4 k.
Standby if quid control system (Boron Systen) 1.
Automatic Depressurization System (any pilot or control valves, associated hydr 3ulic or pneumatic systems, etc.)
m.
Control Rod Drive Hydraulic System (" Scram" function) other key components in Auxiliary Systems which are required to directly n.
sup' port plant shutdown or safety system function.
o.
Reactor Coolan'. System Inservice Puno and Valve Testino Program I.
Information required for NRC Staff Review of the Pump and Valve Testing Program A.
Three sets of P&ID's, which include all of the systems listed above, with the code class and system boundaries clearly marked.
The drawings should include all of the components present at the time of submittal and a legend of the P&ID symbols.
B.
Identifi' cation of the applicable ASME Code Edition and Addenda C.
The period for which the program is applicable.
D.
Identify the component code class.
E.
For Pump testing:
Identify 1.
Each pump required to be tested (name and number) 2.
The test parameters to be measured 3.
The test frequency 1952 275
.i 110-5 F.
For valve testing:
Identify 1.
Each valve in ASME Section XI Categories A & B that will be exercised every three months during normal plant operation (indicate whether partial or full stroke exercise, and for power operated valves list the limiting value for stroke time.)
2.
Each valve in ASME Section XI Category A that will be leak tested during refueling outages (Indicate the leak test procedure you intend to use) 3.
Each valve in ASME Section XI Categories C, D, and E that will be tested, the type of test and the test frequency.
For check valves, identify those that will be exercised every 3 months and those that will only be exercised during cold shutdown or refueling outages.
II. Additional Information that will be Helpful in Speeding Up the Review Process A.
Include the valve location coordinates or other appropriate location information which will expedite our locating the valves on the P& ids.
B.
Provide P&ID drawings that are large and clear enough to be read easily.
C.
Identify valves that are provided with an interleck to other components and a brief description of that function.
1952 276
q 110-6 Relief Recuests from Section XI Reouirements The largest area of concern for the NRC staff, in the review of an inservice valve and pump testing program, is in evaluating the basis fe.-
justifying relief from Section XI Requirements.
It has been our experience that many requests for relief, submitted in these programs, do not provide adequate descriptive and detailed technical information.
This explicit information is necessary to' provide reasonable assurance that the burden imposed on the licensee in complying with the code requirements is not justified by the increased level of safety obtained.
Relief requests which are submitted with a justification such as
" Impractical", " Inaccessible", or any other categorical basis, will require additional information, as illustrated in the enclosed exampics, to allow our staff to make an evaluation of that relief request.
The intention of this guidance is to illustrate the content and extent of information required by the NRC staff, in the request for relief, to make a proper evaluation and adequately document the basis for that relief in our safety evaluation report. The NRC staff feels that by receiving this information in the program submittal, subsequent requests for additional information and delays in completing our review can be considerably reduced or eliminated.
I.
Information Reouired for NRC Review of Relief Recuests A.
Identify component for which relief is requested:
1.
Name and number as given in FSAR 2.
Function 3.
ASME Section III Code Class 4.
For valve testing, also specify the ASME Section XI valve category as defined in IWV-2000
)g }//
1;te7 B. Specifically identify the ASME Code reeJirement that has been determined to be impractical for each component. C. Provide information to support the determiration that the 3 requirement in (B) is impractical; i.e., state and explain. the basis for requesting relief. D. Specify the inservice testing that will be performed in lieu of the ASME Code Section XI requirements. E. Provide the schedule for implementation of the procedure (s) in (D). II. Examples to Illustrate Several Possible Areas Where Relief May Be Granted and the Extent and Content of Information Necessary to Make An Evaluation A. Accessibility: The regulation specifically grants relief from the code requirement because of insufficient access pro-visions. However, a detailed discussion of actual physical arrangement of the component in question to illustrate the insufficiency of space for conducting the required test is necessa ry. Discuss in detail the physical arrangement of the component in question to demonstrate that there is not sufficient space to perform the code required inservice testing. 1952 278
110-8 What alternative surveillance means which will provide an acceptable level of safety have you considered and why are these mea,ns not feasible? B. Environmental Conditions (e.g., High radiation level, High temperature, High humidity, etc.) Although it is prudent to maintain occupation radiation ex.posure for inspection personnel as low as practicable, the request for relief from the code recuirements canrot be granted solely on the basis of high radiation levels alone. A balanced judgment between the hardships and compensating increase in the level of safety should be carefully established. If the health and safety of the public dictates the necessity of inservice testing, alternative means or even decontaminatior of the piant if necessary should be provided or developed. Provide additional information regarding the radiation l' vels e at the required test location. What alternative testing techniques which will provide an acceptable level of assurance of the integrity of the component in question have you considered and why are these techniques determined to be impractical? 1952 279
110-9 C. Instrumentation is not originally provided Provide information to justify that compliance with the code requirements would result in undue burden or hardships without a compensating increase in the level of plant safety. What alternative testing methods which will provide an acceptabTe level of safety have you considered and why are these methods determined to be impractical? D. Valve Cycling During Plant Operation Could Put the Plant in an Unsafe Condition The licensee should explain in detail why exercising tests during plant operation could jeopardize the plant safety. E. Valve Testing at Cold Shutdown or Refueling Intervals in Lieu of the 3 Month Required Interval The licensee should explain in detail why each valve cannot be exercised during normal operation. Also, for the valves where. a refueling interval is indicated, explain in detail why each valve cannot be exercised during cold shutdown intervals. III. Acceotance Criteria for Relief Recuest The Licensee must sucessfully demonstrate that: 1. Compliance with the code requirements would result in hardships or unusual difficulties without a compensating increase in the level of safety and noncomplianc.e will provide an acceptable level of quality and safety, or 1952 280
110-10 2. proposed alternatives to the code requirements or portions thereof will provide an acceptable level of quality and safety. 3 Standard Format A standard format, for the valve portion of the pump and valve testing program and relief requests, is included as an attachment to this Guidance. The NRC staff believes that this standard format will reduce the time spent by both the staff in our review and by the licensee in their preparation of the pump and valve testing program and submittals. The standard format includes exanples of relief requests which are intended to illustrate the application of the standard format and are not necessarily a specific plant relief raquest. 1952. 281
110-11 ATTACHMENT STANDARD FORMAT VALVE INSERVICE TESTING PROGRAM SUBMITTAL 1952 282
m U L c = 3 8 e e 0 U E E 5 =* fi 8 ~5 g E 5 h E E REMARKS E E' a e = Valve m s g o Valve S 8 Category 0 U y g g (Not to be used for relief basis) s o " ^ " Number A B C D 'E e 710 3 0-14 X 4 GA M LO ET 700 3 D-15 X 6 DE NA C DT 717 3 C-15 X 16 CK SA CV X CS 702C 3 C-15 X 16 CK SA CV 707 3 E-14 X 3 REL SA CV 834 3 D-ll X X 4 GL M C Q X ET MT 60 sec. 7228 3 0-11 X 3/4 REL SA SRV 722C 3 B-ll X 3/4 REL SA SRV g 715 2 A-10 X 3 REL SA SRV 729 2 B-10 X 3 REL SA SRV 744B 2 D-14 X 10 GA M0 C Q LT X MT 30 sec. L.n N N CD t.
.) 110-13 Legend for Valve Testing Example Format Q - Exercise valve (full stroke) for operability every (3) months LT - Valves are leak tested per Section XI Article IW-3420 MT - Stroke time measurements are taken and compared to the stroke time limiting value per Section XI Article IW 3410 CV - Exercise check valves to the position required to fulfill their function every (3) months SRV - Safety and relief valves are tested per Section XI Article IW-35i0 DT - Test category D valves per Section XI Article IW-3600 ET - Verify and record valve position before operations are performed and after operations are completed, and verify that valve is locked or sealed. CS - Exercise valva for ope ability every cold shutdown RR - Exercise valve for operability every reactor refueling 1952 284
110-14 Relief 'Reouest Basis System: Auxiliary Coolant System, Component Cooling 1. Valve: 71 7 Category: C Class: 3 Function: Prevent backflow from the reactor coolant pump t cooling coils Impractical test requirement: Exercise valve for operability every three months Basis for relief: To test this valve would require interruption of cooling water to the reactor coolant pumps motor cooling coils. This action could result in damage to the reactor coolar.; pumps and thus place the plant in an unsafe mode of operation. Alternative This valve will be exercised for operability Testing: during cold shutdowns. 2. Valve: 834 Category: B-E Class: 3 Function: Isolate the primary water from the component cooling surge tank during plant opertion. It is normally in the closed position, but routine operation of this valve will occur during ref;elir; and cold shatdowns. Impractical Test Exercise valve (full stroke) for operability Requirement: every three (3) months. 1952 285
110-15 Basis for Relief: This valve is not required to change position during plant operation to accomplish its safety function. Exercising this valve will increase the possibility of surge tank line contamination. Alternate Verify and record valve position before and Testing: after each valve operation. 3. Valve: 744B Category: A Class: 2 Function: Isolate the residual heat exchangers from the cold leg R.C.S. backflow and accumulator backflow. Test Requirements: Seat leakage test Basis for This valve is located in a high radiation field Relief: (2000 mr/hr) which woulo make the required seat leakage test hazardous to test personnel. We intend to seat leak test two other valves (875B and 876B) which are in series with this valve and will also prevent backflow. We feel that by complying with the seat leakage requirements we will not achieve a compensatory increase in the level of safety. Alternative No alternative seat leak testing ir proposed. 1952 286 Testing: .}}