Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000265/LER-1979-002-03, /03L-0 on 790110:during Routine Insp of Reactor Water Cleanup Pump Rooms,Small Leak Was Found on 2-1205B Cleanup Pump Suction Line.Cause Unknown.Leak Was Isolated & Linear Indication on Flange Ground Out + (16:52:30, 3 January 2025)
- ML19261B209 + (16:52:37, 3 January 2025)
- 05000265/LER-1979-002, Forwards LER 79-002/03L-0 + (16:53:17, 3 January 2025)
- 05000277/LER-1979-003-03, /03L-0 on 790109:2A Offgas Radiation Monitor Failed Downscale.Dirt on Contacts of Trip Test/Zero Calibr Switch Caused Input Key to Remain Deenergized Upon Release of Switch.Contacts Were Cleaned & Monitor Returned to Svc + (16:53:37, 3 January 2025)
- ML19261B205 + (16:53:42, 3 January 2025)
- 05000325/LER-1979-007-03, /03L-0 on 790109:during Sys Component Test, Residual Heat Removal Pump D Would Not Start.Caused by Motor Switch Being in Off Position + (16:53:47, 3 January 2025)
- ML19261B203 + (16:53:50, 3 January 2025)
- 05000325/LER-1979-007, Forwards LER 79-007/03L-0 + (16:53:53, 3 January 2025)
- ML19261B200 + (16:53:56, 3 January 2025)
- ML19261B199 + (16:54:00, 3 January 2025)
- 05000254/LER-1979-001-03, /03L-0 on 790107:high Steam Line Flow Alarm & Automatic Isolation of Reactor Core Isolation Cooling Steam Supply Line Occurred.Caused by Failure of Micro Switch Inside Steam Line High Flow Differential Pressure Switch + (16:54:03, 3 January 2025)
- 05000254/LER-1979-001, Forwards LER 79-001/03L-0 + (16:54:08, 3 January 2025)
- ML19261B195 + (16:54:10, 3 January 2025)
- ML19261B193 + (16:54:13, 3 January 2025)
- 05000265/LER-1979-001-03, /03L-0 on 790104:during Monthly Operability Test, Inlet Air Heater on a Standby Gas Treatment Sys Was Found Inoperable.Caused by Setpoint Drift of Flow Switch 1/2-7541-8A + (16:54:17, 3 January 2025)
- ML19261B189 + (16:54:19, 3 January 2025)
- ML19261B187 + (16:54:21, 3 January 2025)
- ML19261B185 + (16:54:23, 3 January 2025)
- 05000265/LER-1979-001, Forwards LER 79-001/03L-0 + (16:55:07, 3 January 2025)
- ML19261B181 + (16:55:11, 3 January 2025)
- 05000277/LER-1979-004-03, /04L-0 on 790112:during Surveillance Test of Cable Spreading Room Smoke Detector,Annunciator Could Not Be Reset Because It Was Not Properly Reset Previously.Detector Lead Disconnected to Reset Annunciator + (16:55:29, 3 January 2025)
- ML19261B178 + (16:55:33, 3 January 2025)
- ML19261B177 + (16:55:36, 3 January 2025)
- ML19261B176 + (16:55:37, 3 January 2025)
- ML19261B175 + (16:55:38, 3 January 2025)
- ML19261B173 + (16:55:39, 3 January 2025)
- ML19261B172 + (16:55:40, 3 January 2025)
- ML19261B170 + (16:55:41, 3 January 2025)
- ML19261B168 + (16:55:42, 3 January 2025)
- ML19261B167 + (16:55:43, 3 January 2025)
- ML19261B165 + (16:55:44, 3 January 2025)
- ML19261B164 + (16:55:46, 3 January 2025)
- ML19261B163 + (16:55:47, 3 January 2025)
- ML19261B162 + (16:55:58, 3 January 2025)
- IR 05000454/1978009 + (16:56:08, 3 January 2025)
- ML19261B160 + (16:56:12, 3 January 2025)
- ML19261B159 + (16:56:15, 3 January 2025)
- ML19261B157 + (16:56:17, 3 January 2025)
- ML19261B156 + (16:56:19, 3 January 2025)
- ML19261B155 + (16:56:20, 3 January 2025)
- ML19261B154 + (16:56:28, 3 January 2025)
- ML19261B152 + (16:56:31, 3 January 2025)
- ML19261B143 + (16:56:32, 3 January 2025)
- IR 05000271/2019002 + (16:56:34, 3 January 2025)
- ML19261B133 + (16:56:37, 3 January 2025)
- ML19261B130 + (16:56:39, 3 January 2025)
- ML19261B128 + (16:56:50, 3 January 2025)
- ML19261B127 + (16:56:52, 3 January 2025)
- ML19261B126 + (16:56:53, 3 January 2025)
- ML19261B121 + (16:56:56, 3 January 2025)
- ML19261B119 + (16:56:57, 3 January 2025)