Monthly Operating Rept for Jan 1979
ML19261B173
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/01/1979
From: Kennedy R
FLORIDA POWER CORP.
To:
Shared Package
ML19261B171 List:
References
NUDOCS 7902140127
Download: ML19261B173 (5)


Text

.

AVERAGE DAILY UNIT POWER LEVEL h

DOCKET NO. 50-307 UNIT FLCRP-3 DATE 2-1 70 COMPLETED BY R. W. Kennedy TELEPHONE 904-745-6486_ ex.168 MONTil. JN ARY 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net)

I 803 17 306 2

800 Ig 196 3

784 19 595 4

795 20 772 804 5

769 21 6

98 22 800 659 7

23 An?

8 719 24 7R4 803 800 25 9

10 A09 26 7on 801 27 532 1J 804 23 56d 12

'766 13 804 29 803 14 30 315 15 801 31 500 16 805 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 790214oG-1

UNIT SilUTDOWNS AND POWER REDUCTlONS DOCKET NO.

50-302 UNI T N AME FLCRP-3 DATE 2-1-79 COMPLETED BY n u vonnnay REPORT Af 0NTil JANUARY TELEPilONE gne_795_un6 ext.168

's -."i e"

c c.

.2 e s

>.E '4 Licensee g r, g'.

Cause & Corrective

-o No.

D.it e g

3g

{

,j g 5 Event u?

o-?

Action to

$E 5

jd-Report #

cfi0 0

Present Recurrence 6

79-1 790106 F

17.2 A

2 IIA Instru Turbine tripped - Suspect momentary high level instrumentation signal from CDilE-2B 79-2 790117 F

23.3 A

2 WE Valvex SCllE-1A open (maintenance) CWV-2 (tagged closed) failed (open) causin;;

flooding of Turbine Bldg. basement 790127 S

46.8 B

llc Filter Installing screens in condensers Power Reduct Lon to 70%

79-3 790130 F

7.5 A

3 Cil PumpXX Main feed pump FWP-2B failed IIll PumpXX Condensate pump CDP-1A out of 790130 F

33.8 B

service for repairs Power Reduct Lon t > 76%

i 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Repor (LER) File (NURI.G-D Regulatory Restriction 4-Other ( Explain) 0161)

E Operator Training & License Examination F Administrative 5

G Operational Error (Explain)

Eshibit 1 - Same Source cl/77)

Il-Other (E xplain )

.l OPERATING DATA REPORT DOCKET NO.

50-302 LATE:

2/5/79 COMPLETED DY:

R.W. KENNEDY TELEPHONE.(904) 795-6456 CX ufEffIIUD 2~6I92 l

INGTES I

o6IT NAnE. CRY 3TAL RIVER 43 1

1 TPORTIdG PE110D-1/1/79 4 1/31/79 I

I m 'CCN3CD THERMAL F0WER 'MUT).

C45 1

i AMEPLATC RAT NC (GR;3S tiWE) 090 1

I ZCIGN ELECTRICAL RATING (NET MWC).

GC5 I

i W4IMUM DEPENDA2LE CAPACITY (GEOGS MWE)-

E35 i

i

..v'!EUM FrE.40ACLE C APACITY G.!ET MWC ).

T77 i

IF CHANGCB CCCUR IN CAFACITY RATINCS (ITEMS NUMDER 3 THROUGH 7> GINCE LAST REPORT. CIVE KwH,avaa.- m.3.---------------------------------------------------

'CWCP LEVEL TC WriTC*1 RE3TRICTED,IF ANY(NET HWC): NCNE 3DN3 FOR.?E 3 T 2 IC T IO N 3, IF ANY: __

- - - - - - - - - - - - - - - - - - - - - - - - -. - - - - - - - - - -.. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ ~ - -

THIS MONTH YR.-TO-DATE CUMULATIVE H PFd IN CFCITING FCRIOD T44.0 744.0 16560.0 2.

FUMDC7 CF HOUR 3 RCACTCP WAC CP.ITICA.

707.4 707.4 13564.5

. 2. REACTUF RCSCR'.E SliUTDCWN HCUR3 0.0 0.0 302.4 14.

HOURS GENCRATOR CN-LINE 695.9 675.9 10:43.3 l5. UNIT RESCRVC 3HUTDOWN P0urs 0.0 0.0 0.0

_o.

GRCS3 TI;CRMAL CNCRCY CENCRATED (MWH) 1571534.0 1571504.0 22163752.0

' ? GROS 3 ELCCTRICAL ENERGY CCNERATED (MWH) 53C14G.2 538149.C T5359Ca.C 1 NCT CL~CTRICAL ENERGY GENERATED (MWH) 509311.0 509811.0 71396T5.7

!? UNIT SLRVICE FACTCR 93.5=/+

93.5./=

61.5 /-

20. UNIT AVAILABILITY FACTOR 93.5+/=

?3.5*/=

61.0-/*

~1 UNIT CAPACITY FACTOR (USING MDC NET) r '..0*/*

86.0*/*

54.1=/a

22. UNIT CAPACITY FACTOR (U3ING DER NET)

.1*/*

33.1a/*

52.3-/*

3. UNIT FORCED CUTAGE RATE 6.5=/*

6.5./.

35.9*/=

3.

CHUTDCWNG 3CHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH):

-- -_ _ _.Akbbd.

O b N_k--_3__ N*_Y b M b l*N_W_

'T IF SKU~ iCa AT END C- 7 5 T TERIOD. ESTIMATED DATE OF STARTUP._-.--------------.

o.

LNiTS IN TC37 STATUC (PRIOR TO COMMERCIAL OPERATION}.

FORCCAST ACHIEVED INITIAL CRITICALITY INITIAL CLCCTRICITY 1/1k/77 C0hMERCIAL CPERATION 1/30/7?

3/13/77

MONTHLY STATUS REPORT REFUELING INFORMATION RU)UEST 1.

Name of Facility:

Crystal River Unit 3 2.

Scheduled date of next refueling shutdown: April, 1979.

3.

Scheduled date for restart following refueling: June, 1979.

4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license anendment? Yes.

In general, changes to the CR #3 technical specifications will include:

a.

Moderator Temperature Coefficient (3.1.1.3) b.

Control Rod Insertion Limits (3.1.3.6) c.

Control Rod Group Assignments (3.1.3.7) d.

Axial inhalance Limits (3.2.1)

Refueling Boron Concentration (3.9.1) e.

These specifications will be reviewed and changed as necessary based on the reactivity of the second cycle as compared to that of the first cycle.

5.

Scheduled date(s) for submitting proposed licensing action and supporting in forma tio'1: February, 1979.

6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or perfor-mance analysis methods, significant changes in fuel design, or new opera-ting procedures.

Florida Power Corporation is presently discussing with the NRC staff our intent to request that the power level of CR #3 he raised from the present level of 2452 MW (t) to the ultimate core power level of 2544 MW (t) as described in the CR #3 FSAR. Additional information concerning our proposed power upgrade for CR #3 will be supplied in forthcoming monthly operating reports.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

a) 177 assemblies b) 4 assemblies 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number if fuel assemblies.

Fresent storage capacity - Pool A - 120 plus 8 failed fuel assemblies a.

Pool B - 120 plus 8 failed fuel assemblies

8.

(Continued) b.

Filed request on January 9,1978 with flRC concerning expansion of Pool A from 120 to 544 assemblies plus 6 failed fuel assemblies and expansion of Pool B from 120 to 609 assem-blies.

Expansion of Pool A is to occur af ter the refueling in April, 1979.

The Pool B expansion will occur at a later refueling outage (approximately 1986).

Additional detailed design infonnation concerning our fuel pool expansion was submitted to the Commission on fiarch 3, fiarch 22, 1978 and January 18, 1979.

9.

The projected date of the last refueling that can be discharged to the spent fuel a.ssuming the present licensec capacity.

1981-1982.

.