Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261F303 + (15:03:11, 3 January 2025)
- ML19261F302 + (15:03:12, 3 January 2025)
- ML19261F301 + (15:03:13, 3 January 2025)
- ML19261F300 + (15:03:14, 3 January 2025)
- ML19261F299 + (15:03:15, 3 January 2025)
- ML19261F298 + (15:03:16, 3 January 2025)
- ML19261F297 + (15:03:16, 3 January 2025)
- ML19261F296 + (15:03:17, 3 January 2025)
- ML19261F295 + (15:03:18, 3 January 2025)
- ML19261F294 + (15:03:19, 3 January 2025)
- ML19261F293 + (15:03:20, 3 January 2025)
- ML19261F292 + (15:03:21, 3 January 2025)
- ML19261F291 + (15:03:22, 3 January 2025)
- ML19261F290 + (15:03:23, 3 January 2025)
- ML19261F289 + (15:03:24, 3 January 2025)
- ML19261F288 + (15:03:25, 3 January 2025)
- 05000289/LER-1978-001-01, /01T-0:on 780106,B&W Informed Util That During Certain Plant Transients,Difference Between Reactor Power as Indicated by out-of-core Instrumentation & as Calculated by Heat Balance May Exceed 4% of Full Power + (15:03:28, 3 January 2025)
- 05000289/LER-1978-001, Forwards LER 78-001/01T-0 + (15:03:32, 3 January 2025)
- ML19261F284 + (15:03:37, 3 January 2025)
- ML19261F283 + (15:03:38, 3 January 2025)
- 05000289/LER-1978-002-01, /01T-0:on 780112,valve FS-V156 Closed to Modify Sprinkler Sys Piping to B Emergency Diesel Radiator Room & Continuous Fire Watch Not Established for 24-h.Caused by Personnel Error.Fire Protection Tech Specs to Be Reviewed + (15:03:41, 3 January 2025)
- ML19261F281 + (15:03:42, 3 January 2025)
- ML19261F280 + (15:03:43, 3 January 2025)
- 05000289/LER-1978-002, Forwards LER 78-002/01T-0 + (15:03:46, 3 January 2025)
- ML19261F277 + (15:03:48, 3 January 2025)
- ML19261F276 + (15:03:50, 3 January 2025)
- ML19261F274 + (15:03:51, 3 January 2025)
- 05000289/LER-1978-005-01, /01T-0:on 780119,Plant Operation Review Committee Found Containment Integrity Violated by Opening Valves BS-V47A & B During Pump Operability Test.Caused by Error in Operating Procedure OP 1104-5.Procedure to Be Revised + (15:03:58, 3 January 2025)
- ML19261F272 + (15:04:00, 3 January 2025)
- 05000289/LER-1978-005, Forwards LER 78-005/01T-0 + (15:04:02, 3 January 2025)
- ML19261F269 + (15:04:03, 3 January 2025)
- ML19261F268 + (15:04:04, 3 January 2025)
- 05000289/LER-1978-004-03, /03L-0:on 780117,while Closing Valve MU-V74A,22 Gallon Per Minute Packing Gland Leak Developed.Caused by Worn Packing in Valve.Valve Placed on Backseat.Packing Replaced 780118 + (15:04:06, 3 January 2025)
- ML19261F266 + (15:04:07, 3 January 2025)
- 05000289/LER-1978-004, Forwards LER 78-004/03L-0 + (15:04:09, 3 January 2025)
- 05000289/LER-1978-003-03, /03L-0:on 780112,emergency Diesel Generator 1B Failed to Start on Simulated Test Signal During Procedure SP1305-5.2.Caused by Drifting Oil Pressure Limit Switch. Setting Adjusted,New Limit Switch Ordered + (15:04:12, 3 January 2025)
- 05000289/LER-1978-003, Forwards LER 78-003/03L-0 + (15:04:14, 3 January 2025)
- 05000289/LER-1978-006-03, /03L-0:on 780124,during Normal Operation,Reactor Coolant Sample Isolation Valve CA-V13 Failed to Close When Actuated by Remote Signal.Caused by Valve Stem Thread Wear. Containment Isolation Valve CA-V2 Closed + (15:04:21, 3 January 2025)
- ML19261F256 + (15:04:22, 3 January 2025)
- 05000289/LER-1978-006, Forwards LER 78-006/03L-0 + (15:04:24, 3 January 2025)
- ML19261F253 + (15:04:25, 3 January 2025)
- ML19261F252 + (15:04:26, 3 January 2025)
- ML19261F251 + (15:04:27, 3 January 2025)
- ML19261F249 + (15:04:28, 3 January 2025)
- ML19261F250 + (15:04:28, 3 January 2025)
- 05000289/LER-1978-007-03, /03L-0:on 780128,while at 50% of Full Power,Incore Quadrant Power Tilt Limit Exceeded.Transient Caused by Transient Power Operations & Maneuvering to all-rods-out Configuration.Xenon Burned Out & Tilt Returned to Limits + (15:04:30, 3 January 2025)
- ML19261F247 + (15:04:31, 3 January 2025)
- ML19261F246 + (15:04:32, 3 January 2025)
- 05000289/LER-1978-007, Forwards LER 78-007/03L-0 + (15:04:33, 3 January 2025)
- ML19261F243 + (15:04:35, 3 January 2025)
- 05000289/LER-1978-010-01, /01T-0:on 780318,during Emergency Sequence & Power Transfer test,1A & 1C Makeup Pumps Tripped When Transferring to Onsite Source Due to Malfunctioning Time Delay Relay & Diesel Generators Failed to Start Due to Pressure Swit + (15:04:36, 3 January 2025)