Text
U.S. NUCLE AR REGULATORY A
ON DOCKET NUM BE R NRC PORu 195
[d
- 2 [
(2 76)
NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL INCIDENT RE') ORT TO FROM:
DATE OF OOCUMENT Mr Boyce H. Grier Met Ed 09/23/77 Reading, Pa.
19603 OATE RECEIVED J. G. Herbein ng,g j PROP INPUT PORM NUMBER OF COPIES RECEIVED d ETTER CNOTCP
[CRIGIN AL
@ Ng ;p;,
e ID CcOPv
, yy gg CESCRIPTION ENCLOSU RE Furnishing corrective actions deleted per telecon with Mr. Streeter on 09/09/ '7 from ER Report No. 77-22/1T concerning Decay He it Pump...
2p PLANT NAME:
THREE MILE ISLAND UNIT # 1 jcm 09/30/77 NOTE: IF PERSONNEL EXPOSURE IS INVOLVED SEND DIRECTLY TO KREGER/J. COLLINS FOR ACTION /INFORMaTION opssirn envrv. N 88/O
-f g
^
INTERNAL DISTRIBUTION Lorn eT-W-
r c r (H I
vTor crunnrDru/IPPOLITO j
tmrte mny I
l unvar /rnerv I
_ l nDTVvc I
- !Teum n, -, en n an serrn
-enreen l
r T e rVMT,T uarn span
nf T Yrn /QTWrF 1 AOO OO6 I
I 't U L vvv i
vorcen/
T.
Enr i T'ic:
i ungA 1
1 I
EXTERNAL DISTRIBUTION CONTROL NUM BE R J/iG#9/$8026 If5%I.
vpnn TTCt i
((I CR (15) SENT AS GAT,B
'791025076 y
f WM '7 ~f"ai an roa *aoum METROPOLITAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601s x
September 23, 1977 GQL 1295
- ~.= / /
9 '7 '. ~ t i I U hv6 C 'N Mr. Ecyce H. Grier. Director
.- /,
N /,' D ( '.(' '
Office of Inspection L Enforcement Region I U. S. :iuclear Regulatory Con =ission 631 Park Avenue King of Prussia, Pennsylvania 19h06
Dear Sir:
Decket No. 50-289 Operating License No. DPR-50 Report No. TT-22/1T Belov is the Corrective Action which was deleted per a telecen with Mr.
Streeter on September 9, 1977, frc= ER TT-22/lT.
Monthly inspections and tests will be performed en each Decay Heat Pump.
'"hese vill include both Ultrasonic and Vibrationc1 testing.
Liquid penetrant pump shaft inspections will be deferred, but may be conducted in the event the specific acceptance criteria of the UT and/or Vibraticn tests are not met.
The NRC shall i==ediately te notified if any Vibratier and/or UT testing does not meet the acceptance criteria. The results of these evaluations and the detailed test data shall be forwarded to the NRC as part of a ec=plete report.
A metallurgical and fracture analysis of the Crystal River Unit #3 failed shaft is being performed by Babcock & Wilecx. The final report shall be submitted by September 28, 1977 Met-Ed and 3&W are investigating and reviewing the metallurgical properties of the 1A and 13 Decay Heat Pump shafts and the spare shafts based cn the QC records and =aterial certifications. The final report shall be submitted to the NRC by Cetober 5, 1977.
1482 007 91P?SoM
j'r. 3cyce H. Grier, Director September 23, 1977 GQL 1295 A review of the Decay Heat P=p design and its operation in the 80 gpm recirculation mode is being performed by Met-Ed and B&W.
The results of this review shall be submitted to the :EC by October 5,1977.
Please note there was an error in Section 10 " Failure Data" of EE 77-22/1T.
Sat section shculd read:
Decay Heat Removal Pump Manufacturer: Werthington Model No.: 8 H'I 19h Part No.: 930679-1 Material: 9A-56h TYPE 630 HT 1150 Sincera'y, J. G. Herbein Vice President JGH:DGM:dkf 1482 008