Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19271A260 + (10:37:33, 3 January 2025)
- ML19271A235 + (10:37:38, 3 January 2025)
- ML19271A233 + (10:37:39, 3 January 2025)
- ML19271A230 + (10:37:40, 3 January 2025)
- ML19271A193 + (10:37:41, 3 January 2025)
- ML19271A192 + (10:37:42, 3 January 2025)
- ML19271A190 + (10:37:43, 3 January 2025)
- ML19271A172 + (10:37:45, 3 January 2025)
- ML19271A166 + (10:37:46, 3 January 2025)
- PNO-III-80-011, on 800102,eddy Current Examination Identified One Tube in Hot Leg & Two Tubes in Cold Leg Needing Plugging & 37 Cold Leg Tubes in 22 Steam Generator Indicating Some Degradation + (10:37:48, 3 January 2025)
- ML19271A153 + (10:37:48, 3 January 2025)
- ML19271A151 + (10:37:49, 3 January 2025)
- ML19271A150 + (10:37:50, 3 January 2025)
- ML19271A149 + (10:37:51, 3 January 2025)
- ML19271A147 + (10:37:52, 3 January 2025)
- ML19271A131 + (10:37:53, 3 January 2025)
- ML19271A125 + (10:37:54, 3 January 2025)
- PNO-I-79-043, on 791221,individual Identified as Licensee Engineer Stated That Seismic Restraints for Isolation Condensers Would Not Withstand Operational Transient Based on Analysis + (10:37:56, 3 January 2025)
- ML19271A101 + (10:37:57, 3 January 2025)
- PNO-III-80-025, on 800202,while Performing Routine Calibr, Technician Discovered Pressure Transmitters on Two Motor Driven Auxiliary Feedwater Pumps Were Valved Out.One Pump Was Available for Each Unit.Licensee Investigating Matter + (10:37:59, 3 January 2025)
- PNO-III-80-011A, steam Generator Inservice Insp Found One Tube in Steam Generator 21 Hot Leg,One Tube in Steam Generator 21 Cold Leg & Four Tubes in Steam Generator 22 Cold Leg Requiring Plugging + (10:38:01, 3 January 2025)
- ML19271A085 + (10:38:02, 3 January 2025)
- ML19271A021 + (10:38:03, 3 January 2025)
- ML19271A020 + (10:38:06, 3 January 2025)
- ML19271A018 + (10:38:07, 3 January 2025)
- ML19271A009 + (10:38:08, 3 January 2025)
- ML19270K645 + (10:38:09, 3 January 2025)
- ML19270K648 + (10:38:09, 3 January 2025)
- ML19270K642 + (10:38:10, 3 January 2025)
- ML19270K590 + (10:38:11, 3 January 2025)
- ML19270K587 + (10:38:12, 3 January 2025)
- ML19270K539 + (10:38:13, 3 January 2025)
- ML19270K512 + (10:38:14, 3 January 2025)
- ML19270K534 + (10:38:14, 3 January 2025)
- ML19270K510 + (10:38:15, 3 January 2025)
- ML19270K415 + (10:38:16, 3 January 2025)
- ML19270K423 + (10:38:16, 3 January 2025)
- ML19270K365 + (10:38:17, 3 January 2025)
- ML19270K363 + (10:38:18, 3 January 2025)
- ML19270K304 + (10:38:19, 3 January 2025)
- PNO-I-79-045A, on 791227,insp at Tri-State Trucking Co Depot in Joplin,Mo Verified Radiation Level Exceeded 300 Millirem Per Hour at One Location on Trailer Surface Holding 80 Drums of Matl to Be Shipped to Vendor in Tuxedo,Ny + (10:38:21, 3 January 2025)
- ML19270K264 + (10:38:21, 3 January 2025)
- ML19270K262 + (10:38:22, 3 January 2025)
- 05000293/LER-1979-048-01, /01X-0:on 791224,switchyard 125-volt Dc Backup Battery Charger Tripped & Could Not Be Reset.Cause Under Investigation.Spare Battery Charger Will Be Put Into Svc + (10:38:24, 3 January 2025)
- ML19270K257 + (10:38:26, 3 January 2025)
- ML19270K151 + (10:38:35, 3 January 2025)
- ML19270K140 + (10:38:36, 3 January 2025)
- ML19270K126 + (10:38:36, 3 January 2025)
- ML19270K123 + (10:38:37, 3 January 2025)
- ML19270K098 + (10:38:38, 3 January 2025)
- ML19270J984 + (10:38:40, 3 January 2025)