Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19273B458 + (10:26:12, 3 January 2025)
- ML19273B456 + (10:26:13, 3 January 2025)
- ML19273B450 + (10:26:14, 3 January 2025)
- ML19273B454 + (10:26:14, 3 January 2025)
- NG-77-1353, Forwards LER 1-77-95 + (10:26:15, 3 January 2025)
- ML19273B449 + (10:26:15, 3 January 2025)
- ML19273B446 + (10:26:18, 3 January 2025)
- ML19273B445 + (10:26:22, 3 January 2025)
- ML19273B442 + (10:26:23, 3 January 2025)
- ML19273B444 + (10:26:23, 3 January 2025)
- ML19273B440 + (10:26:24, 3 January 2025)
- ML19273B438 + (10:26:25, 3 January 2025)
- STC-19-066, Notice of Request for Comment and Public Meetings: Nuclear Energy Innovation and Modernization Act Local Community Advisory Board Best Practices + (10:26:26, 3 January 2025)
- ML19273B435 + (10:26:28, 3 January 2025)
- ML19273B434 + (10:26:30, 3 January 2025)
- ML19273B431 + (10:26:31, 3 January 2025)
- PM-79-212, Reports on Failure of Seismic Monitoring Instrumentation on 790127:peak Acceleration Recorder 2L51-N034 on Feedwater Loop B Inlet Line Was Moved.Instrument Failed Calibr Check & Sent to Manufacturer for Repair + (10:26:32, 3 January 2025)
- ML19273B430 + (10:26:32, 3 January 2025)
- ML19273B427 + (10:26:35, 3 January 2025)
- ML19273B428 + (10:26:35, 3 January 2025)
- 05000338/LER-1979-035-01, /01T-0 on 790319:valve Weights for 14 Check Valves Supplied by Vendor Were Higher than Originally Specified. Caused by Erroneous Design Specs by Vendor.One Pipe Hanger Identified as Unsatisfactory Will Be Modified + (10:26:37, 3 January 2025)
- ML19273B424 + (10:26:38, 3 January 2025)
- 05000338/LER-1979-035, Forwards LER 79-035/01T-0 + (10:26:42, 3 January 2025)
- ML19273B421 + (10:26:44, 3 January 2025)
- ML19273B420 + (10:26:44, 3 January 2025)
- ML19273B419 + (10:26:45, 3 January 2025)
- ML19273B416 + (10:26:46, 3 January 2025)
- ML19273B417 + (10:26:46, 3 January 2025)
- 05000237/LER-1979-014-03, /03L-0 on 790305:U2 Diesel Generator Failed to Start on First & Fifth Attempts.Caused by Bendix Gear Failure to Engage & Failure of Air Start Solenoid to Energize.Solenoid Was Replaced + (10:26:48, 3 January 2025)
- ML19273B412 + (10:26:49, 3 January 2025)
- 05000219/LER-1978-033-01, /01T-2 on 781214:reactor Scram Occurred in Range 1 of Intermediate Range Monitors Due to Failure of Emergency Rod in Control Switch.Caused by Bent Switch Stop.Stop Plate Replaced + (10:26:50, 3 January 2025)
- ML19273B409 + (10:26:52, 3 January 2025)
- 05000302/LER-1979-023-03, /03L-0 on 790308:discovered RCS C1 Concentration Was .17ppm,contrary to Tech Specs.Caused by Appearance of Suspended Solids During Cooldown When Boron Concentration Increased.Purification Sys Reduced Concentration + (10:26:53, 3 January 2025)
- 05000219/LER-1978-033, Forwards LER 78-033/01T-2 + (10:26:55, 3 January 2025)
- 05000302/LER-1979-023, Forwards LER 79-023/03L-0 + (10:26:57, 3 January 2025)
- ML19273B401 + (10:26:59, 3 January 2025)
- ML19273B400 + (10:27:00, 3 January 2025)
- ML19273B399 + (10:27:01, 3 January 2025)
- ML19273B398 + (10:27:02, 3 January 2025)
- ML19273B397 + (10:27:06, 3 January 2025)
- ML19273B396 + (10:27:07, 3 January 2025)
- ML19273B395 + (10:27:09, 3 January 2025)
- ML19273B394 + (10:27:11, 3 January 2025)
- ML19273B393 + (10:27:11, 3 January 2025)
- ML19273B392 + (10:27:12, 3 January 2025)
- ML19273B390 + (10:27:13, 3 January 2025)
- ML19273B388 + (10:27:14, 3 January 2025)
- ML19273B383 + (10:27:15, 3 January 2025)
- ML19273B382 + (10:27:16, 3 January 2025)
- ML19273B380 + (10:27:17, 3 January 2025)
- ML19273B376 + (10:27:18, 3 January 2025)