ML19273B400

From kanterella
Jump to navigation Jump to search
Ack Receipt of 790131 & s Re NRC 790108 Notice of Violation.Nrc Accepts Plan of Interim Rept for Similar Suspect Measurement
ML19273B400
Person / Time
Site: 07000734
Issue date: 03/16/1979
From: Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Wellhouser H
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
References
NUDOCS 7904060234
Download: ML19273B400 (1)


Text

'

UNITED STATES j.

4,

[,,,.

NUCLE AR nEGULATORY COMMISSION

)

REGION V

$ 24,

,d 19 90 N. C ALIF O H NI A B OUt.E VA f4 D Stil T E 2 32, W ALN tJT C R E E K PL A Z A

't,,

    • ae*

W/n LN UT C R E E K, C AllFOH NI A 9?.596 UAR 16 'r37s Docket lio.70-734 General Atomic Company P. O. Box 81603 San Diego, California 92138 Attention:

H. fl. Wellhouser, Director Nuclear Material Control Division Gentlemen:

Thank you for your letters of January 31,1979 (File fio. 696-1018)and February 23,1979 (File flo. 696-1031) in response to our letter and flotice of Violation dated January 8,1979.

Pending further clarification or change in the Form fiRC-741 instructions, we are agreeable to your plan that, in the future, if measurement data are suspect under similar circumstances you will file an interim report.

Of course, we will expect this action to take place within thirty days of material receipt as required by 10 CFR 70.54 and include concurrent written notification to this office giving an explanation of the difficulty and the date such difficulty will be resolved.

The corrective action you have taken on the second noncompliance item will be reviewed during our next material control and accountinr, in-spection.

SincereJy2 l

w k.4 [ 'll dernah,Ch'ef 1

Safeguards Branch

/

cc:

W. R. Mowry Licensing Administrator EUO40GO523I