Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216J743 + (14:53:00, 3 December 2024)
- ML20216J738 + (14:53:04, 3 December 2024)
- PNO-III-78-193, on 781109,received Allegation Re Qualification of Welders Performing Safe End Repair Work at Plant.State of IA Informed + (14:53:05, 3 December 2024)
- ML20216J732 + (14:53:06, 3 December 2024)
- ML20216J733 + (14:53:06, 3 December 2024)
- SVP-98-095, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-22 & 50-265/97-22.Corrective Actions:Procedure Qcop 2300-08 Was Walked Down & Verified by Sro,Corrected Procedure & Evaluated Effect of Longer Valve Closures Times + (14:53:07, 3 December 2024)
- ML20216J728 + (14:53:08, 3 December 2024)
- ML20216J726 + (14:53:08, 3 December 2024)
- ML20216J724 + (14:53:09, 3 December 2024)
- SVP-98-094, Provides Revised Response to Violations Noted in Insp Repts 50-254/97-14 & 50-265/97-14.Corrective Actions:Performed Instrument Error Analysis & Detailed Calculation to Determine Min Pressure Criteria & Revised Qcos 2900-01 + (14:53:10, 3 December 2024)
- ML20216J719 + (14:53:11, 3 December 2024)
- ML20216J720 + (14:53:11, 3 December 2024)
- ML20216J717 + (14:53:12, 3 December 2024)
- ML20216J715 + (14:53:12, 3 December 2024)
- ML20216J713 + (14:53:14, 3 December 2024)
- ML20216J710 + (14:53:15, 3 December 2024)
- ML20216J707 + (14:53:16, 3 December 2024)
- ML20216J708 + (14:53:16, 3 December 2024)
- ML20216J704 + (14:53:17, 3 December 2024)
- PNO-III-99-045, on 991001,brush Fire Was Reported on Licensee Site in Unused Area one-fourth to one-half Mile from Plant Itself.Massac County Fire Dept Responded with Two Trucks & Tanker & Extinguished Fire in About 1 H + (14:53:17, 3 December 2024)
- ML20216J702 + (14:53:18, 3 December 2024)
- ML20216J695 + (14:53:19, 3 December 2024)
- ML20216J700 + (14:53:19, 3 December 2024)
- ML20216J694 + (14:53:20, 3 December 2024)
- ML20216J690 + (14:53:21, 3 December 2024)
- ML20216J693 + (14:53:21, 3 December 2024)
- ML20216J687 + (14:53:22, 3 December 2024)
- ML20216J689 + (14:53:22, 3 December 2024)
- ML20216J685 + (14:53:23, 3 December 2024)
- ML20216J686 + (14:53:23, 3 December 2024)
- 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 + (14:53:24, 3 December 2024)
- ML20216J681 + (14:53:24, 3 December 2024)
- ML20216J680 + (14:53:25, 3 December 2024)
- ML20216J679 + (14:53:26, 3 December 2024)
- BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 + (14:53:27, 3 December 2024)
- ML20216J678 + (14:53:27, 3 December 2024)
- ML20216J676 + (14:53:28, 3 December 2024)
- 05000461/LER-1987-030, :on 870605,RWCU Sys Automatically Isolated. Caused by Feedwater Flow/Pressure Sensitivity to Flow/ Pressure Perturbations.Sys Remained Isolated Until Feedwater Flow Manipulations Complete & Flow Stabilized + (14:53:32, 3 December 2024)
- ML20216J672 + (14:53:33, 3 December 2024)
- ML20216J673 + (14:53:33, 3 December 2024)
- ML20216J667 + (14:53:34, 3 December 2024)
- ML20216J670 + (14:53:34, 3 December 2024)
- ML20216J665 + (14:53:35, 3 December 2024)
- ML20216J666 + (14:53:35, 3 December 2024)
- ML20216J664 + (14:53:36, 3 December 2024)
- 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data + (14:53:37, 3 December 2024)
- LR-N980104, Monthly Operating Rept for Feb 1998 for Hope Creek Generating Station,Unit 1 + (14:53:38, 3 December 2024)
- ML20216J661 + (14:53:38, 3 December 2024)
- ML20216J658 + (14:53:39, 3 December 2024)
- ML20216J659 + (14:53:39, 3 December 2024)
- ML20216J654 + (14:53:41, 3 December 2024)
- RC-99-0192, Forwards Updated 1999 ECCS Evaluation Model Revs Rept for VC Summer Nuclear Station.Rept Is Being Submitted Pursuant to 10CFR50.46,which Requires Licensees to Notify NRC of Corrections to or Changes in ECCS Evaluation Models + (14:53:41, 3 December 2024)