Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217E340 + (14:02:43, 3 December 2024)
- ML20217E339 + (14:02:44, 3 December 2024)
- ML20217E338 + (14:02:47, 3 December 2024)
- ML20217E337 + (14:02:49, 3 December 2024)
- ML20217E335 + (14:02:49, 3 December 2024)
- ML20217E331 + (14:02:50, 3 December 2024)
- ML20217E330 + (14:02:51, 3 December 2024)
- ML20217E329 + (14:02:51, 3 December 2024)
- JAFP-98-0135, Provides Addl Clarification Re Proposed Commitments Contained in 961126 & s.Future Changes to Authority Controlled Procedure Will Be Accomplished Using 10CFR50.59 Process + (14:02:53, 3 December 2024)
- ML20217E326 + (14:02:53, 3 December 2024)
- ML20217E322 + (14:02:54, 3 December 2024)
- ML20217E319 + (14:02:56, 3 December 2024)
- ML20217E320 + (14:02:56, 3 December 2024)
- ML20217E318 + (14:02:57, 3 December 2024)
- ML20217E314 + (14:02:57, 3 December 2024)
- ML20217E313 + (14:02:58, 3 December 2024)
- ML20217E312 + (14:02:59, 3 December 2024)
- JAFP-98-0137, Provides Rev to 980225 Response to NRC Re NOV from Insp Rept 50-333/97-08 on 971027-1221.Corrective Actions:Performed Root Cause Evaluation + (14:03:00, 3 December 2024)
- ML20217E306 + (14:03:01, 3 December 2024)
- ML20217E304 + (14:03:02, 3 December 2024)
- ML20217E305 + (14:03:02, 3 December 2024)
- ML20217E302 + (14:03:03, 3 December 2024)
- ML20217E303 + (14:03:03, 3 December 2024)
- ML20217E300 + (14:03:04, 3 December 2024)
- ML20217E299 + (14:03:05, 3 December 2024)
- ML20217E296 + (14:03:05, 3 December 2024)
- 05000454/LER-1998-004-01, :on 980228,determined That Plugged Drain in Reactor Incore Instrumentation Seal Table Room Had Not Been Properly Evaluated.Caused by Inadequate Written & Oral Communications.Temporary Alteration Installed + (14:03:08, 3 December 2024)
- ML20217E293 + (14:03:08, 3 December 2024)
- ML20217E292 + (14:03:09, 3 December 2024)
- ML20217E285 + (14:03:10, 3 December 2024)
- NG-99-1415, Monthly Operating Rept for Sept 1999 for Daec.With + (14:03:10, 3 December 2024)
- ML20217E284 + (14:03:11, 3 December 2024)
- 05000293/LER-1998-003, :on 980220,discovered That RBCCW & Tbccw Heat Exchanger Supports Outside Design Basis Seismic Requirements.Caused by Calculation Error.Reviewed Similar Calculations & Counseled Individuals Associated W/Errors + (14:03:13, 3 December 2024)
- ML20217E279 + (14:03:14, 3 December 2024)
- 3F0398-18, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-12.Corrective Actions:Review of EOPs Was Conducted to Identify Actions to Be Performed by Support Organizations + (14:03:15, 3 December 2024)
- ML20217E274 + (14:03:15, 3 December 2024)
- ML20217E272 + (14:03:16, 3 December 2024)
- ML20217E273 + (14:03:16, 3 December 2024)
- ML20217E269 + (14:03:17, 3 December 2024)
- ML20217E268 + (14:03:18, 3 December 2024)
- ML20217E264 + (14:03:20, 3 December 2024)
- ML20217E262 + (14:03:21, 3 December 2024)
- ML20217E260 + (14:03:22, 3 December 2024)
- ML20217E261 + (14:03:22, 3 December 2024)
- ML20217E257 + (14:03:23, 3 December 2024)
- ML20217E258 + (14:03:23, 3 December 2024)
- ML20217E255 + (14:03:24, 3 December 2024)
- PNO-II-99-045, on 991018,Hurricane Irene Was Located Approx 105 Miles East of Cape Hatteras,Nc.Ctr of Hurricane Was Estimated Near Latitude 35.6 North & Longitude 73.8 West. Storm Was Moving Northeast at 35 Mph + (14:03:25, 3 December 2024)
- ML20217E252 + (14:03:25, 3 December 2024)
- ML20217E248 + (14:03:29, 3 December 2024)
- ML20217E246 + (14:03:29, 3 December 2024)
- PNO-IV-99-043, on 991016,earthquake of Magnitude 7 Occurred. Plant Operations Were Not Disrupted.Unusual Event Classifications Were Exited within 1 H at Both Facilities.No Damage Was Indicated & No Residual Plant Effects Observed + (14:03:32, 3 December 2024)