Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217E686 + (14:00:09, 3 December 2024)
- ML20217E688 + (14:00:09, 3 December 2024)
- ML20217E685 + (14:00:10, 3 December 2024)
- ML20217E684 + (14:00:11, 3 December 2024)
- ML20217E682 + (14:00:11, 3 December 2024)
- BSEP-98-0050, Forwards Rev 2 to ESR 97-00034, Engineering Evaluation B213R1 Core Shroud Insps, Incorporating Changes Resulting from Revised Insp Data.Root Cause Evaluation for Condition Rept 97-03902 Included + (14:00:12, 3 December 2024)
- ML20217E681 + (14:00:12, 3 December 2024)
- ML20217E678 + (14:00:13, 3 December 2024)
- ML20217E676 + (14:00:20, 3 December 2024)
- ML20217E672 + (14:00:21, 3 December 2024)
- ML20217E675 + (14:00:21, 3 December 2024)
- NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future + (14:00:22, 3 December 2024)
- ML20217E669 + (14:00:23, 3 December 2024)
- ML20217E664 + (14:00:25, 3 December 2024)
- ML20217E661 + (14:00:26, 3 December 2024)
- ML20217E662 + (14:00:26, 3 December 2024)
- ML20217E660 + (14:00:27, 3 December 2024)
- ML20217E654 + (14:00:30, 3 December 2024)
- ML20217E653 + (14:00:31, 3 December 2024)
- L-98-055, Forwards ISI Ninety-Day Summary Rept Bvps,Unit 1 Outage 12, Yr 1997, Per ASME Boiler & Pressure Vessel Code,Section XI, Artical IWA-6230 + (14:00:32, 3 December 2024)
- ML20217E647 + (14:00:32, 3 December 2024)
- ML20217E645 + (14:00:34, 3 December 2024)
- IR 015000042/1997009 + (14:00:35, 3 December 2024)
- ML20217E641 + (14:00:35, 3 December 2024)
- ML20217E633 + (14:00:36, 3 December 2024)
- ML20217E631 + (14:00:37, 3 December 2024)
- ML20217E628 + (14:00:38, 3 December 2024)
- ML20217E629 + (14:00:38, 3 December 2024)
- ML20217E623 + (14:00:39, 3 December 2024)
- ML20217E622 + (14:00:40, 3 December 2024)
- ML20217E618 + (14:00:41, 3 December 2024)
- ML20217E614 + (14:00:42, 3 December 2024)
- ML20217E615 + (14:00:42, 3 December 2024)
- ML20217E609 + (14:00:43, 3 December 2024)
- ML20217E605 + (14:00:44, 3 December 2024)
- ML20217E603 + (14:00:45, 3 December 2024)
- ML20217E600 + (14:00:46, 3 December 2024)
- ML20217E602 + (14:00:46, 3 December 2024)
- ML20217E599 + (14:00:48, 3 December 2024)
- PNO-III-99-046, on 991018,licensee Reported That Medical Misadministration Had Occurred on 990907.Written Directive Has Been Prepared by Patient Physician for 200 Mci Dose of I-131 for Thyroid Treatment + (14:01:02, 3 December 2024)
- IR 05000250/1997009 + (14:01:03, 3 December 2024)
- ML20217E595 + (14:01:03, 3 December 2024)
- ML20217E592 + (14:01:04, 3 December 2024)
- B17185, Monthly Operating Rept for Mar 1998 for Millstone Nuclear Station,Unit 1 + (14:01:05, 3 December 2024)
- ML20217E588 + (14:01:05, 3 December 2024)
- ML20217E587 + (14:01:06, 3 December 2024)
- ML20217E582 + (14:01:14, 3 December 2024)
- 05000482/LER-1999-014, :on 991024,determined That Plant Entered Mode 4 Following Seventh RFO Without Satisfying TS Sr.Caused by Failure to Identify TS Requirements 3.5.2 & 3.5.3 with Respect to Plant Conditions.Procedures Revised + (14:01:16, 3 December 2024)
- ML20217E577 + (14:01:17, 3 December 2024)
- ML20217E579 + (14:01:17, 3 December 2024)
- NPL-98-0296, Forwards Response to Violations Noted Insp Repts 50-266/98-03 & 50-301/98-03.Corrective Actions:Appropriate Maint Procedure Controls Applied to safety-related Maint Activities Have Included Clarification & Review of Mgt + (14:01:18, 3 December 2024)