Forwards Insp Rept 50-285/97-13 on 970630-0718 & Notice of Violation
ML20217E654
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/02/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20217E658 List:
References
50-285-97-13, NUDOCS 9710070117
Download: ML20217E654 (4)


See also: IR 05000285/1997013

Text

r

ti -

'

t ju *'Ch UNiit o ST ATES

I#

f /* NUCLEAR REGULATORY COMMISSION

[ ), ' l - $. RtoioN iv

C

Gil RYAN PLAZA DRIVE, SulTE 400

t.

%, ..../

"

AR LING ton, T & X AS 76011 8064

I

October 2,1997

S. K. Gambhir, Division Manager

Engineering & Operations Support

Omaha Public Power District -

1

Fort Calhoun Station FC 2-4 Adm.

P.O. Box 399

Hwy. 75 North of Fort Calhoun

Fort Calhoun, Nebraska 680.13-0399

SUB.H.CT: NRC INSPECTION REf0Rr 50-285/9713 AND NOTICE OF VIOLATION

Dear Mr. Gambhir:

An NRC inspection was conducted June 30 through July 18,1997, at your Fort Calhoun

Station reactor facility. The enclosed report presents the scope and results of that

inspection. The final results of this inspection were discussed with you on October 2,

1997.

Based on this inspection, we have determined that your-corrective action program was

effective in identifying, resolving, and preventing issues that could degrade the quality of

plant operations or safety. However, three violations were identified as discussed below.

The first violation involved the failure to maintain the senior vice president as the

chairperson of the safety audit and review committee as required by Technical

-Specification. - As discussed in the attached inspection report, this administrative change

involved a reduction in previous commitments by deleting the senior vice president position

as the chairperson of the safety audit and review committee.

The second violation involved two examples of the failure to issue a condition report for-

conditions adverse to quality. This violation was of concern because these conditions

were identified by your staff and could potentially impact safe operation of Fort Calhoun

Station.

The third violation involved the preconditioning of component cooling water outlet valves

prior to inservice stroke time testing.

Regarding the first violation, the NRC has concluded that information regarding the reason

for the violation, and the corrective actions taken to correct the violation and prevent its

~

recurrence, have already been adequately addressed. Therefore, you are not required to

respond to this violation unless the description in this report does not accurately reflect

your corrective actions or your position. In that case, or if you choose to provide

additicnal information, you should follow the instructions specified in the enclosed Notice.

9710070117 971002

PDR ADOCK 05000285

l l $!

0 PDR ~

- _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ -

e

0

e

Omaha Public Power District -2-

Regarding violations two and three, these violations are cited in the enclosed Notice of

Violation (Notice) and the circumstancet surrounding the violations are described in detail

in the enclosed report. Please note that you are required to respond to this letter and

should follow the instructions specified il the enclosed Notice when preparing your

response. The NRC will use your response, in part, to determine whether further

enforcement action is necessary to ensure compliance with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response should not include any personal privacy,

proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

'

-

,

-

0 - j

j I Arthur . Howell lli, Director

'

Division of Reactor Safety

Docket No.: 50 285

License No.: DPR 40

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-205/97-13

cc w/ enclosures:

James W. Tills, Manager

Nuclear Licensing

Omaha Public Power District

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399

Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023-0399

James W. Chase, Manager

Fort Calhoun Station

P.O. Box 399

Fort Calhoun, Nebraska 68023

_--

.

. . , .

..

.

-*

'

e

Omaha Public Power District -3-

Perry D. Robinson, Esq.

?Winston & Strawn

1400 L. Street, N.W.

Washington, D.Ci20005 3502

Chairman

Washington County Board of Supervisors

Blair, Nebraska 68008

Cheryl Rogers, LLRW Program Manager

Environmental Protection Section

Nebraska Department of Health

3

301 Centennial Malli South '

. .P.O. Box 95007

Lincoln, Nebraska 68509 5007-

i'

.

. . . .- . .. .

.

.

Omaha Public Power District -4-

E Mail report to T Frye (TJF)-

E-Mail report to T Hiltz (TGH)

- E-Mail report to NRR Event Tracking System (IPAS)

E Mai. aport to Document Control Desk (DOCDESK)

E Mail report to Rich Correia (RPC)

E Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib, by RIV:

Regional Administrator DRS-PSB

DRP Director Mis System

, Branch Chief (DRP/B) RIV File -

Project Engineer (DRP/B) Branch Chief (DRP/TSS)

Resident inspector

DOCUMENT NAME:

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N"

= No copy

RIV:EB:RI RI:EB Rl:EB

, AC:EB D:DRP go , D:DRM ,

WJWagne6 % DBPereira MFRunyar, TFStetka ff TPGw/nnW ATH64lfill ,

093/97 P 09/ /97 09/)2/97 % 09/g97 0941/97 $/2/97

"

OFFidlAL RECORD COPY

!

gw

- Omaha Public Power Mstrict- -4-

.

E-Mail recart to T. Frye (TJF)

E-Mail .eport to T. Hiltz (TGHi

E Mal'. report to NRR Event Tracking ?iystem (IPAS)

E Ma.1 report to Document Control Pesk (DOCDESK)

E-Mail report to Rich Correia (nec)

E Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib by RIV:

Regional Administrator . DRS-PSB

DRP Director MIS System

Branch Chief (DRP/B) RIV File

Project Engineer (DRP/B) Branch Chief (DRP/TSS)

- Resident inspector

. DOCUMENT NAME:

= To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N"

= No copy

RIV:EB:RI , Rl:EB ' RI:EB AC:EB D:DRP do ,. D:DRM ,

WJWagnen $ DBPereira MFRunyar, TFStetka d TPGw/nnb ATH6vWlfill 4

R 09/-/97 "

093/97 -J

09/A/97% 09/g/97 09/> t/97 $/2/97

OFFICIAL RECORD COPY

Y M0O32

,

..,r,.,