Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217N059 + (13:00:02, 3 December 2024)
- ML20217N057 + (13:00:03, 3 December 2024)
- ML20217N052 + (13:00:04, 3 December 2024)
- ML20217N046 + (13:00:06, 3 December 2024)
- ML20217N039 + (13:00:07, 3 December 2024)
- ML20217N036 + (13:00:08, 3 December 2024)
- ML20217N038 + (13:00:08, 3 December 2024)
- ML20217N034 + (13:00:09, 3 December 2024)
- ML20217N031 + (13:00:10, 3 December 2024)
- 05000254/LER-1997-018-01, :on 970721,determined That RHRSW Valves Associated W/Rhr Pumps Were Not Included in Monthly Valve Surveillance.Caused by Inadequate Procedure Development. Verified Valves to Be in Corrected Position + (13:00:12, 3 December 2024)
- IR 05000458/1998009 + (13:00:13, 3 December 2024)
- ML20217N024 + (13:00:13, 3 December 2024)
- ML20217N021 + (13:00:15, 3 December 2024)
- ML20217N020 + (13:00:15, 3 December 2024)
- ML20217N018 + (13:00:16, 3 December 2024)
- ML20217N019 + (13:00:16, 3 December 2024)
- ML20217N017 + (13:00:17, 3 December 2024)
- ML20217N016 + (13:00:17, 3 December 2024)
- ML20217N014 + (13:00:19, 3 December 2024)
- ML20217N013 + (13:00:19, 3 December 2024)
- 05000445/LER-1998-003, :on 980406,SG Tube Plugging Was Noted.Caused by Stress Corrosion Cracking.Plugged All Defective Tubes Identified During Current Refueling Outage + (13:00:21, 3 December 2024)
- ML20217N009 + (13:00:23, 3 December 2024)
- ML20217N011 + (13:00:23, 3 December 2024)
- ML20217N006 + (13:00:24, 3 December 2024)
- ML20217N004 + (13:00:25, 3 December 2024)
- ML20217N005 + (13:00:25, 3 December 2024)
- B17207, Forwards Clarification of Commitment Made in Licensee Re Response to RAI on Recirculation Spray Sys.List of Revised Commitments,Encl + (13:00:26, 3 December 2024)
- ML20217N003 + (13:00:26, 3 December 2024)
- ML20217M999 + (13:00:27, 3 December 2024)
- ML20217M998 + (13:00:28, 3 December 2024)
- ML20217M997 + (13:00:28, 3 December 2024)
- IR 05000321/1997012 + (13:00:29, 3 December 2024)
- ML20217M995 + (13:00:30, 3 December 2024)
- ML20217M989 + (13:00:30, 3 December 2024)
- NSD-NRC-97-5287, Forwards Westinghouse Revised Response to NRC Request for Addl Info Pertaining to AP600 fuel-coolant Interactions. Revised Response Closed,From Westinghouse Perpective,Rai + (13:00:31, 3 December 2024)
- NSD-NRC-97-5283, Submits Info Being Provided in Response to Question by NRC Staff Re Limited Number of Small Threaded Holes in Turbine Rotor for AP600 + (13:00:32, 3 December 2024)
- B17152, Submits Revised NRC Form 396, Certification of Medical Examination by Facility Licensee, for One Licensed SRO Who Now Requires Corrective Lenses.W/O Encl + (13:00:33, 3 December 2024)
- ML20217M977 + (13:00:33, 3 December 2024)
- ML20217M976 + (13:00:34, 3 December 2024)
- ML20217M973 + (13:00:36, 3 December 2024)
- BSEP-98-0072, Documents Info Provided to NRC During 980323 Conference Call Re Conversion to Improved Tech Specs Manual Scram Functions + (13:00:37, 3 December 2024)
- NSD-NRC-97-5286, Forwards non-proprietary Rev 1 to WCAP-14942, AP600 Accident Analyses - Evaluation Models + (13:00:38, 3 December 2024)
- ML20217M970 + (13:00:38, 3 December 2024)
- 05000339/LER-1998-001-02, :on 980405,manual Reactor Trip Was Declared Inoperable Due to Control Bank B Group Step Counter.Caused by Malfunction of Mechanical Drive.Ts Action Statement 3.1.3.3 Initiated + (13:00:40, 3 December 2024)
- ML20217M966 + (13:00:40, 3 December 2024)
- ML20217M965 + (13:00:41, 3 December 2024)
- ML20217M964 + (13:00:42, 3 December 2024)
- VPN-060-97, Forwards FFD Performance Data Rept for Period 970101-970630 + (13:00:43, 3 December 2024)
- ML20217M961 + (13:00:44, 3 December 2024)
- ML20217M960 + (13:00:45, 3 December 2024)
- ML20217M958 + (13:00:46, 3 December 2024)
- ML20217M952 + (13:00:47, 3 December 2024)