ML20217N020

From kanterella
Jump to navigation Jump to search
Discusses Telcon on 980427 Between J Williams & B Havens Re Arrangements for Administration of Licensing Exam at Plant During Wk of 980810.Written Exams,Operating Tests & Supporting Ref Matls Will Be Due by 980511
ML20217N020
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/28/1998
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
Public Service Enterprise Group
References
NUDOCS 9805050193
Download: ML20217N020 (4)


Text

[.

April 28, 1998

~

f l

i i

I Mr. Harold W. Keiser Executive Vice President Nuclear Business Unit i

Public Service Electric & Gas Company L

Post Office Box 236 Hancocks Bridge, New Jersey 08038

SUBJECT:

SENIOR REACTOR INITIAL EXAMINATIONS - HOPE CREEK l

Dear Mr. Keiser:

In a telephone conversation on April 27,1998, between Mr. J. Williams and Mr. B.

l Havens, arrangements were made for the administration of licensing examinations at the Hope Creek facility the week of August 10,1998.

l The NRC will prepare the examinations based on the guidelines in interim Revision 8, of I

NUREG-1021," Operator Licensing Examination Standards for Power Reactors." in accordance with the guidelines in Attachment 5 of ES-201, your staff will be given the opportunity to review the examinations before the examinations are administered.

The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by May 11,1998. Any delay in receiving the

)

required reference materials, or the submittal of inadequate or incomplete materials, may 1

cause the examinations to be rescheduled.

-In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator perfonnance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval j

number 3150-0090), medical certificetions (OMB approval number 3150-0024),and waiver requests (if any) (OMB approval number 3150-0090)at least 30 days before the first examination date. If the applications are not received at least 30 days before the l

examination date, a postponement may be necessary. Signed applications certifying that i

all training has been completed should be submitted at least 14 days before the first examination date.

t 9805050193 980428 C

PDR ADOCK 05000354 f

V PDR

l r

\\.

l :i l-Mr. Harold W. Keiser 2

This letter contains information collections that are subject to the Paperwork Reduction Act of 1996(44 U.S.C. 3501 et seq.). _ These information collections were approved by the Office of Management and Budget, approval number 3150-0101,which expires on l

April 30, 2000.

The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001,or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202,(3150-0101), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Havens has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact J. Williams at (610) 337 5124, or me at (610) 337-5183.

Sincerely, Richard J. Conte, Chief l

Operator Licensing and Human Performs;nce Branch j

Division of Reactor Safety Docket No.: 50-354 l-i J

l g

Mr. Harold W. Keiser 3

.cc:

L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

J. A. Isabella, Manager, Joint Generation Atlantic Electric M. Bezilla, General Manager - Hope Creek Operations J. McMahon, Director - Quality Assurance & Nuclear Safety Review D. Powell, Director - Licensing, Regulation and Fuels R. Kankus, Joint Owner Affairs A. C. Tapert, Program Administrator Jeffrey J. Keenan, Esquire Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways Creek To vnship State of New Jersey State of Delaware i

hl Mr. Harold W. Keiser 4

Distribution:

Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector PUBLIC H. Miller, RA/W. Axelson, DRA (irs) l J. Linville, DRP S. Barber, DRP l

L. Harrison, DRP C. O'Daniell, DRP R. Conte, DRS J. Williams, Chief Examiner OL Facility File DRS File B. McCabe, OEDO R. Capra, PDI-2, NRR B. Mozafari, PM, NRR inspection Program Branch, NRR (IPAS)

DOCDESK i

i l

l l

l l

l DOCUMENT NAME: G:OLHP\\ WILLIAMS \\SRINIEXM.HC To receive a ecmy of this docuenet.t, Indicate in the box: 'C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS r#/ l Rl/DRS., A [,

/

l l

l NAME JWilliams /"

RCont/f4V DATE 04/27/98 4/'I4 04F X 04/ /98 04/ /98 04/ /98 OFFICIAL RECORD COPY l