_ - _ _ _ - _ _ _ - - _ _ _ _ _ _ _ - _ _ _ _
Portland Lu dral Electric One blJ Dade Center 121 SW S.ulmon Strert Portland, OR 9H04 August 21,1997 VPN-060-97 Trojan Nuclear Plant i
Docket 50-344 License NPF-1 U.S. Nuclear _ Regulatory Conunission ATTN: Document Control Desk Washington, DC 20555 i
Eitness For Duty Program Performance Data Renort Please find enclosed Portland General Electric Company's Fitness For Duty Perfonnance Data Report for the period beginning January 1,1997, and ending June 30,1997. This report is submitted in accordance with 10 CFR 26,71(d).
Sincerely, Stephen M. Quennoz Trojan Site Executive -
I Enclosure I
,' Q} !
p Attachments c:
D. Stewart-Smith, ODOE R. A. Scarano, NRC Region IV M. T. Masnik, NRC, NRR 9708250390 970821' PDR ADOCK 05000344 f ffllf Q ([a *.1 Natural gas. Electricity. Endless possibilities.
Enclosure to VPN-060-97 August 2I,1997-Eage1of1 Fitness For Duty Program Performance Data Renort During the reporting perica, January through June,1997, the Trojan Nuclear Plant Security Department continued to operate under the Trojan Nuclear Plant Security Plan (Defueled Condition). The Security Plan contains a commitment to 10 CFR 26 for unescorted access to the Trojan Protected Area.
Effectiveness Summary One positive PGE employee pre-access drug test occurred during this reporting period.
Two positive contract employee pre-access drug tests occurred during this reporting period, i
I One positive PGE employee random alcohol test occurred during this reporting period.
During this eporting period the Trojan Plant Fitness For Duty Program staffing level remained at two personnel.
Events Reported No reportable events occurred during this reporting period Statistical Summary During the reportmg period, the Fitness For Duty Program conducted 149 pre-access drug and alcohol tests,72 random drug and alcoho! tests, I reasonable suspicion test,0 post-accident tests, and 5 follow-up drug and alcohol tests. PGE's overall positive rate for the random screening program was 1.4 percent (1.4 percent for PGE employees and 0 percent for contract personnel).
The positive rate for all screenings during the period January through June 1997, is 1.7 percent.
The Trojan Nuclear P.lant average population during the reporting period was 228. The total number of random tests was 72. At the end of the reporting period, PGE had randomly screened 31.6 percent of the average plant population granted protected area unescorted access. During this period 149 pre-access tests were completed.-
Attachment to VPN-060-97
"* August 21, 1997 Page 1 of 2 FITNESS FOR DUTY PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Portland General Electric June 30, 1997 Company 6 Months Ending Trojan Nuclear Plant, 71760 Columbia River Hwv.,
Rainier, OR 97048 Location Manuel D.
Gatlin, Manager, Nuclear Security (503) 556-6429 Contact Name Phone (include area code)
Cutoffs. Screen / Confirmation (ng/ml) u Appendix A to 10 CFR 26 j
Marij uana 20/15 Amphetamines 1000/500 Sarbiturates 300/200 Cocaine 300/150 Phencyclidine 25/25 Ben:adiazepenes 300/200 Opiates 300/300 Alcohol (%BAC) 0.041, l
Testing Results Licensee Employees Long-Term Short Ter:n Contractor Contractor Personnel Personnel Average Number With 173 6
49 Unescorted Access Categories Tested Positivel Tested Positivel Tested Positival Pre-Access 54 1
1 0
0 0
35 2
2 f
For C
Post-Accident p
g g
g y
g g
g g
a u
s Observed Behavior 1
9 9
0 0
0 0
0 J
e Random 59 1
1 1
9 9
12 0
0 Follow-up 5
0 g
y g
y-g g
g Other y
y y
0 y
0 0
G G
Total 119 2
2 1
0 0
107 2
2 NRC PCE NRC PCE NRC PCE U Separate columns for reporting positive tests using URC and PCE confirmation levels.
Page 1 of 2 TPP 23-3 Revision 4 Page 31 of 42
a...'--....s
=
KT. '
F
.r-BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCE-
?El i s i g
-l Barb Benz g
[ ~ ft l
Amphe-Phency-Refusal Marijuana Cocaine Opiates tamines didine Alcohol to Test 1
2 3
4 5
gg e
Licensee 1
4$'
Employees -
1 0
0 0
0 1
0 0
0 z
,[0 h
I Long-Term 0
0 0
0 0
0 0
0 0
Contractors
/
Short-Term 2
Contractors 2
0 0
0 0
0-0 0
0 A
Total 3
0 0
0 0
1 0
0 0
0 NRC PGE Attachment Page1ofl'