ML20217N057
| ML20217N057 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 04/30/1998 |
| From: | Conte R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hornick J BALTIMORE GAS & ELECTRIC CO. |
| References | |
| NUDOCS 9805050204 | |
| Download: ML20217N057 (2) | |
Text
a April 30, 1998 Mr. John Hornick initial Training Supervisor l
Baltimore Gas & Electric Co.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Musby, Maryland 20657
Dear Mr. Hornick:
The purpose of this letter is to inform you of the individual examination result for your applicant on the initial retake examination conducted on April 1,1998, at your facility.
This meets the intent of section E.1 of the Examiner Standards (ES 501)in NUREG 1021.
This information is considered to be " proprietary" in accordance with 10 CFR 2.790 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, (NRC Form 157) for the applicant. Contained therein are the deficiencies noted for each applicant, in accordance with your Systems Approach to Training (SAT) Program, wo expect that you will review these results and provide appropriate remedial training for the individualindependent of the overall pass status. The 1
applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the license issued.
Thank you for your cooperation in this matter. Please refer any questions you have to me at 610-337-5183.
Sincerely, Original signed by T. Kenny for/
l Richard J. Conte, Chief i
l Operator Licensing and Human Performance Branch Division of Reactor Safety l
L Docket Nos. 50-317 and 50-318
\\
/
0FFICIAL RECORD COPY f
y D
gg 4
9805050204 990430 PDR ADOCK 05000317 PM V
I i
e
[
l l
Mr. John Hornick l
Enclosures:
- 1. ES-501-2, Power Plant Licensing Examination Results Summary
- 2. ES-303-1 and 303-2, Individual Examination Results
- 3. ' License cc w/o encis:
P. E. Katz, Plant General Manager PUBLIC bec w/o encis:
Master Exam File i
DOCUMENT NAME: A:\\initno, cc To rec 2ive a copy of this document, Indicate in the box:
- C" = Copy without attachment / enclosure
- E' = copy with attachment / enclosure "N" = No copy 0FFICE RI/DRS l
RI/DRS l
RI/DRS l
l l
NAME Curley D' Antonio /#
Conte
- M DATE 04/30/98 04/Jo /98 '
04/ So /98 04/
/98 04/
/98 0FFICIAL RECORD COPY i
l J