Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20235H716 + (10:23:53, 3 December 2024)
- ML20235H712 + (10:23:54, 3 December 2024)
- ML20235H714 + (10:23:54, 3 December 2024)
- 05000458/LER-1987-010, :on 870609,RWCU Sys Isolation Occurred Due to High Temp Isolation Signal from RWCU HX Room Leak Detection Sys.Caused by Two Regenerative HX Pressure Relief Valves. Valves Replaced & Isolation Signal Reset + (10:23:56, 3 December 2024)
- ML20235H710 + (10:23:56, 3 December 2024)
- ML20235H707 + (10:23:57, 3 December 2024)
- ML20235H706 + (10:23:58, 3 December 2024)
- ML20235H702 + (10:23:58, 3 December 2024)
- ML20235H701 + (10:23:59, 3 December 2024)
- ML20235H696 + (10:24:00, 3 December 2024)
- ML20235H694 + (10:24:00, 3 December 2024)
- ML20235H691 + (10:24:01, 3 December 2024)
- ML20235H685 + (10:24:02, 3 December 2024)
- ML20235H682 + (10:24:03, 3 December 2024)
- ML20235H678 + (10:24:04, 3 December 2024)
- ML20235H674 + (10:24:05, 3 December 2024)
- ML20235H677 + (10:24:05, 3 December 2024)
- NLS8700310, Forwards MDE-103-0986, Cooper Nuclear Station Reactor Pressure Vessel Surveillance Matls Testing & Fracture Toughness Analysis. Rept Contains Test Results of Reactor Vessel Surveillance Capsule Withdrawn Following Cycle 9 + (10:24:32, 3 December 2024)
- ML20235H666 + (10:24:33, 3 December 2024)
- ML20235H657 + (10:24:34, 3 December 2024)
- ML20235H658 + (10:24:34, 3 December 2024)
- 05000313/LER-1987-005-01, :on 870825,reactor Trip Occurred Due to Failure of One Phase of Breaker 5118.Caused by Relay Personnel Forgetting to Pull Breaker Failure Module.Maint & Testing Performed & Procedures Under Evaluation + (10:24:36, 3 December 2024)
- JPN-87-035, Forwards Insp Summary of Igscc,Per Util 861028 Commitment. Welds Classified According to NUREG-0313,Rev 2.Specific Insp Plans Will Be Addressed Prior to Next Scheduled Refueling Outage.Two Oversize Drawings Encl + (10:24:37, 3 December 2024)
- ML20235H648 + (10:24:38, 3 December 2024)
- ML20235H644 + (10:24:39, 3 December 2024)
- ML20235H645 + (10:24:39, 3 December 2024)
- ML20235H643 + (10:24:40, 3 December 2024)
- ML20235H641 + (10:24:40, 3 December 2024)
- ML20235H640 + (10:24:41, 3 December 2024)
- ML20235H639 + (10:24:42, 3 December 2024)
- ML20235H636 + (10:24:42, 3 December 2024)
- ML20235H635 + (10:24:43, 3 December 2024)
- TXX-6553, Interim Deficiency Rept CP-86-55 Re Seismic Air Gap Design Adequacy Between Auxiliary Bldg & Units 1 & 2 Containment Bldgs.Initially Reported on 860814.Evaluation Continuing. Next Rept Expected by 870911 + (10:24:44, 3 December 2024)
- ML20235H630 + (10:24:45, 3 December 2024)
- ML20235H629 + (10:24:46, 3 December 2024)
- ML20235H626 + (10:24:47, 3 December 2024)
- ML20235H620 + (10:24:48, 3 December 2024)
- ML20235H619 + (10:24:49, 3 December 2024)
- ML20235H617 + (10:24:49, 3 December 2024)
- ML20235H616 + (10:24:50, 3 December 2024)
- ML20235H612 + (10:24:51, 3 December 2024)
- ML20235H610 + (10:24:52, 3 December 2024)
- ML20235H609 + (10:24:54, 3 December 2024)
- ML20235H605 + (10:24:54, 3 December 2024)
- ML20235H604 + (10:24:55, 3 December 2024)
- PY-CEI-NRR-0680, Forwards Page 55 of Supplemental Startup Rept Inadvertently Omitted Per 870605 Submittal.Attached Page Completes Suppl + (10:24:56, 3 December 2024)
- ML20235H597 + (10:24:57, 3 December 2024)
- ML20235H587 + (10:25:06, 3 December 2024)
- ML20235H584 + (10:25:07, 3 December 2024)
- BSEP-87-1090, Responds to Violations Noted in Insp Repts 50-324/87-20 & 50-325/87-20.Corrective Actions:Personnel Involved W/ Incidents Appropriately Counseled & Operations Total Quality Team Established to Implement Ways to Reduce Operator Error + (10:25:08, 3 December 2024)
- ML20235H583 + (10:25:08, 3 December 2024)
- ML20235H578 + (10:25:09, 3 December 2024)