Forwards Safety Insp Rept 50-483/87-17 on 870602-04.No Violations Noted.Summary of Exercise Weaknesses Encl. Corrective Actions Requested within 45 Days of Ltr Date
ML20235H578
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/30/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20235H581 List:
References
NUDOCS 8707150187
Download: ML20235H578 (3)


See also: IR 05000483/1987017

Text

'

. 1

..

i

JUN 3 01987

'

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

Vice President - Nuclear

Post Office Box 149 - Mail Code 400

St. Louis, M0 63166 i

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. P. Patterson

and others of this office on June 2 through June 4, 1987, of activities at the

Callaway Nuclear Power Plant authorized by NRC Operating License No. NPF-30

and to the discussion of our findings with you and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective .

examination of procedures and representative records, observations, and l

interviews with personnel. l

No violations of NRC requirements were identified during the course of this

inspection; however, one weakness was identified which will require corrective I

action by your staff. This weakness is summarized in the " Exercise '

Weaknesses," enclosed with this letter. As required by 10 CFR Part 50, Appendix E

(IV.F), any weaknesses that are identified must be corrected. Accordingly,

please advise us within 45 days of the date of this letter of the corrective

actions you have taken or plan to take, including the estimated dates of

completion.

l In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

NRC Public Document Room.

l We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by W. Snell*

l

1 Q h5gcue70500o493

O

870630

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

l Enclosures: y

l

1.

2.

Exercise Weaknesses

Inspection Report 'e

./

No. 50-483/87017(DRSS)

See Attached Distribution  ; )

i

RIII RI I RI RIII R Ip RIII

ff \u C' -

IA

W l

'

wGS n

Pat rson/nma P gg nd Shafe

r. g;h $er ,; suo w. ,

__

- . - - - -_

,-

.e-

Union Electric Company 2'

Jl)N 3 C) 1987

!

Distribution

cc w/ enclosures:

A. P. Neuhalfen, Manager Quality l

Assurance

Gary L. Randolph, General Manager,

Nuclear Operations

DCS/RSB (RIDS)

Licensing Fee Management Branch l

Resident Inspector, RIII l

Region IV '

Resident Inspector, Wolf Creek

K. Drey l

Chris R. Rogers, P.E.

Utility Division, Missouri i

Public Service Commission

SNUPPS

0. Matthews, EPB, NRR

R. Bissell, FEMA, RVII

_ _ _ _ _ _ _ _

. _ _ - _ _ _ _ _ _ _

.

..-

l

Exercise Weaknesses

The medical drill portion of the exercise, which included a burning car with

an injured, radioactively contaminated man, was evaluated as being unacceptable.

Several key response aspects relating to following Emergency Implementing

Procedure, EIP-ZZ-00224, Injury or Illness for Callaway Injured Person, were

not adhered to. These included, among others, the lack of cordoning off the

contaminated area from the clean area around the accident, contaminated survey

results were not relayed to the Control Room, the lack of gloves in the

treatment of the injured man by the Medical Emergency Response Team (MERT),

and the lack of demonstrating the transfer of the injured man to a stretcher

further away from the accident _ scene. Additional detail is listed in

Section 5d (50-483/87017-01).

!