Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000334/1989003 + (08:24:48, 3 December 2024)
- 05000374/LER-1988-013-01, :on 881015,LPCS Min Flow Bypass Differential Switch Exceeded Rejection Limit & Sys Declared Inoperable. Cause by Setpoint Drift.Replacement Switch Installed & Calibrated + (08:24:51, 3 December 2024)
- ML20235Y926 + (08:24:54, 3 December 2024)
- ML20235Y924 + (08:24:55, 3 December 2024)
- ML20235Y922 + (08:24:56, 3 December 2024)
- ML20235Y921 + (08:24:57, 3 December 2024)
- ML20235Y920 + (08:24:57, 3 December 2024)
- ML20235Y919 + (08:24:58, 3 December 2024)
- ML20235Y917 + (08:24:59, 3 December 2024)
- ML20235Y918 + (08:24:59, 3 December 2024)
- ML20235Y914 + (08:25:00, 3 December 2024)
- ML20235Y913 + (08:25:01, 3 December 2024)
- IR 05000289/1988029 + (08:25:03, 3 December 2024)
- ML20235Y911 + (08:25:05, 3 December 2024)
- 05000296/LER-1987-003-04, :on 870918,RWCU Sys Isolated Unexpectedly During Troubleshooting Maint on Secondary Containment Isolation Damper.Cause Unknown.No Corrective Action Planned. Testing May Identify Corrective Actions Needed + (08:25:06, 3 December 2024)
- ML20235Y908 + (08:25:07, 3 December 2024)
- ML20235Y907 + (08:25:08, 3 December 2024)
- ML20235Y906 + (08:25:08, 3 December 2024)
- ML20235Y903 + (08:25:09, 3 December 2024)
- ML20235Y901 + (08:25:10, 3 December 2024)
- ML20235Y899 + (08:25:10, 3 December 2024)
- ML20235Y898 + (08:25:11, 3 December 2024)
- ML20235Y896 + (08:25:12, 3 December 2024)
- ML20235Y895 + (08:25:12, 3 December 2024)
- 05000374/LER-1988-009-03, :on 880817,pressure Differential Switch PDS-2E31-N007BB Found to Have Apparent Ruptured Diaphragm. on 880901,spurious Actuation Occurred Due to New Switch Not Fully Valved.First Event Caused by Leakage + (08:25:14, 3 December 2024)
- IR 05000245/1989001 + (08:25:15, 3 December 2024)
- ML20235Y891 + (08:25:16, 3 December 2024)
- ML20235Y889 + (08:25:17, 3 December 2024)
- ML20235Y887 + (08:25:18, 3 December 2024)
- ML20235Y886 + (08:25:18, 3 December 2024)
- PNO-I-89-016, on 890303,JM Allan Approved NRC Restart Assessment Panel Recommendation to Release Licensee from Second Approval Point in Power Ascension Test Program. Testing Activities for Next Phase Stated + (08:25:19, 3 December 2024)
- ML20235Y883 + (08:25:20, 3 December 2024)
- ML20235Y881 + (08:25:20, 3 December 2024)
- JPN-87-053, Comment Supporting Proposed Rule 10CFR50 Re Revising Backfitting Process for Power Reactors.Minor Alterations Urged Re Conditions Under Which Backfit Needed to Assure Adequate Protection + (08:25:21, 3 December 2024)
- ML20235Y879 + (08:25:22, 3 December 2024)
- ML20235Y878 + (08:25:22, 3 December 2024)
- ML20235Y876 + (08:25:23, 3 December 2024)
- ML20235Y877 + (08:25:23, 3 December 2024)
- ML20235Y875 + (08:25:24, 3 December 2024)
- ML20235Y872 + (08:25:25, 3 December 2024)
- ML20235Y873 + (08:25:25, 3 December 2024)
- ML20235Y870 + (08:25:26, 3 December 2024)
- ML20235Y871 + (08:25:26, 3 December 2024)
- IR 05000353/1989009 + (08:25:28, 3 December 2024)
- ML20235Y867 + (08:25:28, 3 December 2024)
- 05000458/LER-1989-004, :on 890210,ESF Actuation Occurred When Instrumentation & Controls Technician Incorrectly Took Voltage Reading on Instrument Trip Unit.Caused by Personnel Error.Technician Received Counseling + (08:25:30, 3 December 2024)
- ML20235Y865 + (08:25:31, 3 December 2024)
- IR 05000528/1987027 + (08:25:32, 3 December 2024)
- ML20235Y864 + (08:25:32, 3 December 2024)
- ML20235Y862 + (08:25:33, 3 December 2024)
- ST-HL-AE-2383, Responds to NRC Re Deviation Noted in Insp Repts 50-498/87-41 & 50-499/87-41.Corrective Actions:Affected Preventive Maint & Maint Work Requests Not Identified as quality-related When Performed Have Been Reviewed + (08:25:34, 3 December 2024)