ML20235Y920

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-325/OL-87-02 of Exam Administered on 870824-27 for Units 1 & 2.Exam Questions & Answer Key, Facility Comments & Simulation Facility Fidelity Rept Also Encl
ML20235Y920
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/16/1987
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20235Y923 List:
References
NUDOCS 8710200529
Download: ML20235Y920 (2)


Text

- m-m f

z

' h ;.

l ]

+

October 16,'1987-1 CarolinaLPowerandLightCompany c

' ATTN: Mr.JEr E. Utley Senior Executive Vice President

~,'

Power-Supply and. Engineering

.and Construction 4

P. O. Box-1551

-Raleigh', NC' 27602-

' Gentlemen.

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT EXAMINATION-REPORT 325/0L-87 On August 24-27, 1987, the NRC administered examinations.to employees o)(.your'

,<.; company who had applied for licenses to, operate the.Brtinswick Steam Electric ~

Plant..At the conclusion of the-written examination,:a copy.of the exam was-left with.your: staff.

At the conclusion of the site visit,.the examination l

U questions ~and preliminary findings were discussed.with those members. of.your,

staff identified'in'the Examination Report, Enclosure 1 Copies-of the written examination questions and answer key are included in'this report as Enclosure-2.

Facility comments regarding~the written examination are included.in this= report as Enclosure 3. summarizes-simulator l

performance' deficiencies observed during conduct of the simulator portion:of

/

-the' operating examinations.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

-Shoul' you have. any ' questions concerning this letter, please contact us.

d

~

i Sincerely, (ORIGINAL SIGNED BY-C.

A.,

JULIAN)7 Caudie A. Julian, Chief Operations Branch Division of Reactor Safety i

Enclosures:

1; Exam Report 50-325/0L-87-02 i

-2.

R0/SRO Exam Questions & Answer Key.

3. -Facility Comments 4.

Simulation Facility Fidelity Report cc w/encls 1 &'3:

1 J. L. Harness, Manager Nuclear Training

~C. R. Dietz, Plant Manager cc w/encls 1, 2, 3 & 4:

-J. Moyer, Manager Training

.M bec:-(See page 2)

M 9710200529 871016

/

j ADOCKOSOO{gS g(

PDR.

V

= _ _ - _ _ - _ _ _ _ _ _ -

e g:

r

'l'.

October 16, 1987 Carolina. Power and Light Company 2

bec w/ encl.1:

E. Sylvester,. Project Manager, NRR State of' North Carolina-bec w/ enc 1s 1,-2,.3, & 4:

. Senior Resident Inspector Operator Licensing Branch,'DHFT:NRR

' F00cument' Control Desk

Tony Vinnola, EG&G 4

1 i >

1 i

l l

l RI RM R1 Q

RShaw DC a~yne JMunrt CAJu 'an j.

10/dd'/87 '

10/V/87 10/-1 /87 10/p/87 l

l 1

w i