ML20235Y911

From kanterella
Jump to navigation Jump to search
Notifies of Designation of Eb Eckel to Provide Technical Assistance Re Review of Project.Vol I of Dept of Water & Power of City of Los Angeles,Southern California Edison & San Diego Gas & Electric Co PSAR Forwarded.W/O Encl
ML20235Y911
Person / Time
Site: 05000000, 05000307, 05000308
Issue date: 12/11/1967
From: Pecora W
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To: Price H
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20235X376 List: ... further results
References
FOIA-87-462 4037, NUDOCS 8710200526
Download: ML20235Y911 (1)


Text

'T hh$ dLCh k f.

M.

L 1

UNITED STATES -

_ _., _ u,,, n,,,, -,. _ e y DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY

-(sTulatory Syppl Fjjg Oy, WASHINGTON, D. C.

'20242 0FFICE OF THE DIRECTOR Q

g December 11, 1967 p k

E g 1N Mr.' Harold L. Price Director of Regulation g

Atomic Energy Commission M

n f

g ha cco

Washington, D.C. 20545

Dear Mr. Price:

(0 g

Since receipt of your letter of December 4 and as discussed with you from time to time by telephor:2, we have designated Mr. Edwin B.

Eckel of the. Geological Survey staff.to provide the technical assist-ance of the Geological Survey in connection with the review of the Bolsa Island project in accordance with established procedures. Pursuant to that designation, we have forwarded to Mr. Eckal Volume I of the Safety Analysis Raports. filed by the Department of Water and Power of i

the City of Los Angeles and by the Southern California Edison Company and the San Diego Gas and Electric Company. Mr. Eckel will proceed with the review of these reports.

Mr. Eckal is located in Denver, with his present address as follows:

Mr. Edwin B. Eckel U.S. Geological Survey Denver Federal Center Denver, colorado-30225 You may contact him directly in connection with ' the arrangements for the assistance that he will provida. However, because.of his location in Denver, it is requested that every consideration be given to arrange-ments that will involve as little travel by him as possible' consistent with the needs of the project.

Sincerely yours, G

4%

l g

Director

.s gr,,g A000W1. EDGED E

g.CU ge

~

~

O

//

El,gi)6 S

8 8710200526 871014

']

t c

PDR FOIA i

1 Yu

.[

SCHADR A87-462 PDR gp Fo1 A-87-%1.

Klo y

x -

.-]A