Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236J015 + (06:43:20, 3 December 2024)
- ML20236J014 + (06:43:21, 3 December 2024)
- ML20236J009 + (06:43:22, 3 December 2024)
- 05000458/LER-1998-001, :on 980417,flow Rate Through SGTS Filter Assembly Units Were Found to Be Higher than Design Flow Rate.Caused by Personnel Error.Reviewed & Updated Design & Licensing Basis Documents + (06:43:23, 3 December 2024)
- ML20236J005 + (06:43:24, 3 December 2024)
- ML20236J004 + (06:43:24, 3 December 2024)
- ML20236J003 + (06:43:25, 3 December 2024)
- ML20236J000 + (06:43:25, 3 December 2024)
- ML20236H999 + (06:43:26, 3 December 2024)
- ML20236H994 + (06:43:29, 3 December 2024)
- ML20236H995 + (06:43:29, 3 December 2024)
- ML20236H992 + (06:43:30, 3 December 2024)
- ML20236H989 + (06:43:31, 3 December 2024)
- ML20236H991 + (06:43:31, 3 December 2024)
- U-603038, Submits Update to Util Response to NRC Ltr Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f) + (06:43:32, 3 December 2024)
- ML20236H982 + (06:43:33, 3 December 2024)
- ML20236H983 + (06:43:33, 3 December 2024)
- ML20236H979 + (06:43:34, 3 December 2024)
- ML20236H976 + (06:43:35, 3 December 2024)
- ML20236H975 + (06:43:35, 3 December 2024)
- RBG-26873, Responds to Violations Noted in Insp Rept 50-458/87-20 on 870801-0915.Corrective Actions:Fuel Oil Analysis Requirements Entered Into Surveillance Test Procedure Tracking Program & CSP-0100 Reviewed & Revised + (06:43:36, 3 December 2024)
- ML20236H972 + (06:43:36, 3 December 2024)
- ML20236H969 + (06:43:37, 3 December 2024)
- ML20236H966 + (06:43:38, 3 December 2024)
- ML20236H965 + (06:43:38, 3 December 2024)
- ML20236H964 + (06:43:39, 3 December 2024)
- 05000423/LER-1998-027, :on 980416,determined That Unmonitored Flowpaths Existed for Diesel Fuel Oil Transfer Pumps During IST Testing.Caused by Program & Process Re Deficiencies. Review of Past Surveillance Results Conducted + (06:43:41, 3 December 2024)
- ML20236H956 + (06:43:42, 3 December 2024)
- IR 05000298/1987016 + (06:43:43, 3 December 2024)
- ML20236H952 + (06:43:43, 3 December 2024)
- ML20236H950 + (06:43:44, 3 December 2024)
- ML20236H951 + (06:43:44, 3 December 2024)
- ML20236H947 + (06:43:45, 3 December 2024)
- ML20236H949 + (06:43:45, 3 December 2024)
- 05000334/LER-1987-015, :on 870703 & 09,three Chlorine Detector Probes Tested & Failed to Meet Response Time Criteria.Caused by Improper Application of Vendor Test Procedures.Probes Recalibr & Procedure Revised + (06:43:47, 3 December 2024)
- RBG-26875, Gulf States Utils Co,River Bend Station-Unit 1 Startup Test Rept (Suppl 5) + (06:43:48, 3 December 2024)
- PNO-V-87-055, on 870729,unusual Event Declared Due to Loss of Emergency Power Supplies Due to Jacket Water Leak in Engine Driven Jacket Water Pump.Licensee Maintaining Six Operable Offsite Power Transmission Lines + (06:43:50, 3 December 2024)
- 05000456/LER-1987-034, :on 870704,grab Sample Analysis,Taken Due to Inoperability of Radiation Monitor,Not Completed on Time. Caused by Insufficient Data Storage Room in Computer.Addl Disc Drives Will Be Activated + (06:43:51, 3 December 2024)
- ML20236H933 + (06:43:54, 3 December 2024)
- ML20236H931 + (06:43:55, 3 December 2024)
- ML20236H924 + (06:44:28, 3 December 2024)
- ML20236H922 + (06:44:29, 3 December 2024)
- TAC:62730 + (06:44:29, 3 December 2024)
- ML20236H921 + (06:44:31, 3 December 2024)
- ML20236H918 + (06:44:32, 3 December 2024)
- 3F1087-20, Forwards Corrected Certificate of Svc for Tech Spec Change Request 152,inadvertently Identified as Tech Spec Change Request 157 + (06:44:33, 3 December 2024)
- ML20236H915 + (06:44:34, 3 December 2024)
- ML20236H911 + (06:44:35, 3 December 2024)
- ML20236H914 + (06:44:35, 3 December 2024)
- ML20236H909 + (06:44:36, 3 December 2024)
- 05000416/LER-1987-010, :on 870630,unintentional Closure of Isolation Valves Occurred.Caused by Manual Opening of Power Supply Breaker.Procedure Revised to Require Detailed Investigation of Effect on Related Equipments + (06:44:38, 3 December 2024)